Unauthorised Occupation of Green Belts on National Highways
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3146 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether it is a fact that green belts along National Highways in the National Capital Region are encroached or under unauthorised occupation and if so, the details thereof; and (b) the quantum of land under encroachment in the National Capital Region along National Highways and the details of action initiated to remove the encroachments along with the time frame by which the encroachments would be removed in order to reduce air pollution?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMapped and Notified Water Bodies under AMRUT in Panna
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3147 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware of encroachment, pollution and loss of public space at Lokpal Sagar Talab in Panna town and if so, the details thereof; (b) whether the waterbody has been mapped, notified and considered under AMRUT/urban waterbody rejuvenation guidelines for conservation and restoration and if so, the details thereof; (c) whether any Detailed Project Report (DPR), proposal or fund sanction for desilting, anti-encroachment works and lake-edge protection has been received from the State/ULB and if so, the details and present status thereof; (d) if not, the administrative or procedural reasons therefor along with the remedial measures being taken for urgent conservation; and (e) the timeline fixed and the funding modality for restoring the lake, securing drinking-water quality and reclaiming the adjacent community space?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMetro Rail Network in Uttar Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3148 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the details of the current operational length of metro networks in Uttar Pradesh, the present average daily ridership for each and the targets set and achieved for network length and ridership, city-wise including Lucknow, Kanpur, Agra, Noida and Ghaziabad; (b) the status and projected timelines for completion of ongoing metro phases including Lucknow Phase-2, Kanpur corridors and Agra Phase-2, details of cost overruns or delays, if any and the extent to which completion targets have been met; (c) the status of new metro/rapid transit projects currently under planning or Detailed Project Report (DPR) stage in Uttar Pradesh including Lucknow-Kanpur RRTS, Meerut Metro and Gorakhpur Metro along with their expected commencement timelines and targets set and achieved; and (d) the financial and technical support provided by the Union Government for metro and rapid transit projects in Uttar Pradesh along with the extent to which set targets for project completion and operational efficiency have been achieved?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceVyapaar Vikas App for MSMEs
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3149 · Asked on 2025-12-18
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
We have not ingested the asking members for this question.
(a) the details of the salient features and services currently available on the Vyapaar Vikas App/Business Development Application for MSMEs along with the status of its nationwide rollout including the number of Business Facilitation Centres operational as on date across the country; (b) whether any time-limit and target have been fixed by the Government to expand the coverage of Vyapaar Vikas App/Business Development Application to all the talukas across the country, if so, the details of progress achieved under each phase of implementation; (c) the details of Micro, Small and Medium Enterprises (MSMEs) included on the Vyapaar Vikas App/Business Development Application platform so far, sector and State-wise; (d) whether the National Council for Industrial Research and Development has finalised Partnership with banks, financial institutions and NBFCs to facilitate access to credit/loans up to 500 crore for MSMEs through Business Development Application/Vyapaar Vikas App and if so, the details thereof; and (e) the details of the methods and amount of loans sanctioned or disbursed, State and district-wise, including Himachal Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDelay in National Highway Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3150 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
Benny Behanan, Karti Chidambaram, Namdeo Kirsan
(a) the total number and value of national highway projects sanctioned during the last ten years which are currently delayed along with the current status of the project; (b) the total number and value of highway projects which have been bid out but construction is yet to begin including the reasons for non-commencement; (c) the steps being taken by the Government to expedite these delayed projects to avoid cost escalation; and (d) the manner in which the Government plans to bring all delayed or uninitiated highway projects back on schedule?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFunctional Household Tap Connections in Karnataka under Jal Jeevan Mission
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3151 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
(a) the details of funds released, physical progress achieved and number of Functional Household Tap Connections (FHTCs) provided in Karnataka under the Jal Jeevan Mission (Rural) since its inception in 2019, year-wise along with the total approved cost and the share of the Union and State Governments including the funds released, utilised and pending State matching share and any outstanding liabilities or unspent balances; (b) the details of projects sanctioned under the National Rural Drinking Water Programme (NRDWP) during 2009–19 in Karnataka including funds released, coverage achieved and the reasons for delays, if any; (c) whether the Government has accorded National Project status to any major irrigation project in Karnataka and if so, the details thereof; and (d) the details of National Project status to the Upper Krishna Project, Upper Bhadra Project or any other major irrigation project in Karnataka along with the allocation of funds made for the purpose?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMillet-based Products
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3152 · Asked on 2025-12-18
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) the steps taken by the Government to promote millet based food processing clusters and startups in view of the increasing global demand for millet based products in the aftermath of the International Year of Millets and the incentives provided to exporters and food processors to scale production; (b) the measures being implemented to improve infrastructure packaging and quality control for millet based products; and (c) whether the Government has conducted any periodic review of export performance and the impact on farmer income due to millet based products processing, if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCities to be developed under SCM
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3153 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the names of cities included by the Union Government for development under the Smart Cities Mission (SCM) in the country, State-wise including Rajasthan; (b) the details of the budget allocated and expenditure incurred for these cities during each of the last three financial years and the current financial year, head-wise; (c) whether the cities selected under SCM in Rajasthan and other States have not been developed as per Smart City parameters despite budgetary expenditure; (d) if so, the reasons therefor along with the details of the authorities responsible for the same; (e) whether the Government proposes to conduct a third-party quality audit of works carried out under SCM in various cities of Rajasthan; and (f) if so, the time by which it is likely to be done and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNH-66 in Kasaragod
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3154 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether widening, service-road and drainage components of National Highway (NH)-66 in Kasaragod remain incomplete, if so, the details thereof; (b) the reasons for delays relating to land acquisition, utility shifting or contractor performance; and (c) the revised construction timeline, penalty measures and deadline for completion?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceTap Water Supply in Bhiwandi under JJM
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3155 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
(a) whether the tap water supply to various rural and semi-urban households has not been completed so far in Bhiwandi Lok Sabha Constituency under the Jal Jeevan Mission (JJM); (b) if so, the number of villages households provided with tap water connections so far along with the number of villages and households deprived of tap water connection in the said Constituency; (c) whether the Government has received any report highlighting water quality issues including industrial pollution, bacterial contamination and heavy metal concentrations in groundwater in the said Constituency and if so, the details thereof; (d) whether any specific financial and technical assistance is being provided by the Union Government for water conservation, water quality test and treatment in the said Constituency; and (e) if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePLI Scheme in Karnataka
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3156 · Asked on 2025-12-18
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
We have not ingested the asking members for this question.
(a) the number of applications approved under the Production Linked Incentive (PLI) scheme in various sectors in Karnataka, the number of approved projects which have started commercial production and the percentage of projects which have achieved their committed investment milestones; (b) the criteria for selection of food processing companies which have received PLI disbursements; and (c) the monitoring mechanisms in place to ensure compliance with the minimum sales and investment limits required for claiming PLI incentives?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCompletion of Bypass Roads in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3157 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the details of bypass roads constructed in Andhra Pradesh during the last five years including their length and location; (b) the current status of ongoing bypass road projects in the State; (c) the expected timelines for completion of each project; and (d) the funds allocated and utilised under each project?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStrengthening City Gas Distribution and National Gas Grid Connectivity
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3158 · Asked on 2025-12-18
Ministry: PETROLEUM AND NATURAL GAS
Member asked
Alok Sharma, Shobhanaben Baraiya, Vishnu Dayal Ram
(a) the progress made in the expansion of the National Gas Grid during the last five years including the total length of operational and under-construction pipelines; (b) the current status of connecting all the States and Union Territories to the National Gas Pipeline Network and the plan and timelines for connecting the remaining areas; (c) the details of steps taken to ensure reliable Piped Natural Gas (PNG) supply particularly in remote, hilly and North-Eastern States; and (d) the number of Geographical Areas currently connected to trunk pipelines for City Gas Distribution operations and the measures being taken to accelerate Geographical area-wise connectivity in areas not yet covered?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRevenue Generation through Toll Collection
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3159 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the total revenue generated by the National Highways Authority of India (NHAI) through toll collection across the country during the last ten years; (b) whether the Government prescribes any time-limit for levying toll on national highways and if so, the details thereof and the number of highways that continue to collect toll beyond the prescribed period, State-wise; (c) whether the Government has prescribed any performance or maintenance metrics to assess upkeep of national highways, if so, the details thereof; and (d) whether any audit has identified highways not meeting those standards, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational Commission for Scheduled Tribes
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3160 · Asked on 2025-12-18
Ministry: TRIBAL AFFAIRS
Member asked
(a) whether the National Commission for Scheduled Tribes (NCST) has formed a special committee to look into the aspects of protecting specific rights of Scheduled Tribes, if so, the details thereof; (b) whether due to lack of funds and staff, the NCST felt handicapped to initiate studies on the assigned duties, if so, the details thereof; and (c) whether the Commission is now preparing a report on the manner in which these assigned tasks can be taken up and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Green Highways Policy
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3161 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
Avimanyu Sethi, Chandra Prakash Choudhary
(a) the targets set by the Government for using recycled materials, Construction and Demolition waste and fly ash in National Highway (NH) projects in the financial year 2025-26 and the manner in which it is ensuring the structural integrity of these green highways; (b) the manner in which the Government plans to speed up the implementation of the green highways policy including mandatory roadside afforestation/tree plantation; (c) the details of third-party audit system that verifies tree survival rates along the NHs; (d) whether the Government has finalised guidelines for using steel slag in major pavement works for the said region, if so, the details thereof; and (e) the manner in which the Ministry is coordinating with the Ministry of Steel and the steel industries to ensure continuous supply of the material for the purpose?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOperationalisation of Azamgarh Airport
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3162 · Asked on 2025-12-18
Ministry: CIVIL AVIATION
Member asked
(a) the date on which Azamgarh Airport was fully constructed and became ready for operation; (b) the details of total expenditure incurred on the construction of the said airport; (c) whether it is a fact that all flights have been suspended following the initial inauguration of the airport and if so, the reasons therefor; (d) the hurdles and challenges being faced by the Government in the operationalisation of Azamgarh Airport; and (e) the time by which the Government proposes to overcome these hurdles and challenges in order to make the said airport operational at the earliest?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInfrastructure Development for Public Transport
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3163 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether the Government is aware of the problem of traffic jams increasing rapidly due to continuous increase in vehicles in big metropolitan cities, tier-3 and tier-2 cities of the country, if so, the details thereof; (b) whether any national level strategy or coordinated plan is being prepared by the Union Government to address the said problem, if so, the details thereof; (c) whether the Government is contemplating to come up with new schemes for infrastructure development of public transport in the near future; and (d) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceIndo-Bhutan River Commission
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3164 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
We have not ingested the asking members for this question.
(a) whether there is any proposal to form an Indo-Bhutan River Commission, if so, the details thereof and if not, the reasons therefor; (b) whether the State Government of West Bengal would be included if such a commission is formed, if so, the details thereof and if not, the reasons therefor; (c) the details of the members of the Joint Technical Team (JTT) on Flood Management and the Joint Experts Team (JET) on Flood Forecasting; and (d) the implementable action taken/activities undertaken by JTT, JET and the Joint Group of Experts (JGE)?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEMRS in Kandhamal District of Odisha
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3165 · Asked on 2025-12-18
Ministry: TRIBAL AFFAIRS
Member asked
(a) whether the Government has taken significant steps to expand Eklavya Model Residential Schools (EMRS) across tribal districts including Kandhamal in Odisha and if so, the details thereof; (b) the present status of EMRS in Kandhamal district including the number of functional schools and those under various stages of development; (c) whether the Government is considering sanctioning new EMRS in tribal-dominated blocks such as Khajuripada and Chakapad in Kandhamal which are currently not covered under the scheme and if so, the details thereof; and (d) if not, whether the Government would consider their inclusion in the next phase and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceLand Lease Revision of Delhi Golf Club
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3166 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the reasons for not revising/increasing the land rates/lease rates operated by the Land and Development Office (L&DO) for the Delhi Golf Club since 2011 as 170 acres valuable land was given on lease to the said Club; and (b) the names of officers, serving or retired who acquired membership of the Delhi Golf Club during their posting in the Ministry of Housing and Urban Affairs since 2010 till date?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceApproval of Funds for Jal Jeevan Mission
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3167 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
(a) the quantum of funds for which approval of the Expenditure Finance Committee (EFC) was sought by the Government upon launching the Jal Jeevan Mission (JJM) in 2019 including the total outlay and the Central share therein; (b) the final quantum of funds actually approved by the Government for JJM including the total outlay and the Central share therein; (c) whether the Government has once again approached the EFC for additional funds for the extension of JJM and if so, the details thereof along with the action taken by the EFC thereon; (d) the quantum of funds for which approval of the EFC has been sought including the additional outlay, additional Central share, cumulative total outlay and cumulative Central share therein; and (e) whether the JJM therefore stands formally extended or whether there are still any formalities pending to extend the same and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceReduction of Carbon Emission
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3168 · Asked on 2025-12-18
Ministry: CIVIL AVIATION
Member asked
(a) the specific steps taken to reduce carbon emissions from airports and airlines, including adoption of Sustainable Aviation Fuel (SAF), use of green energy, implementation of CORSIA and upgrades to aircraft technology; (b) the details of SAF blending targets, the number of airports achieving carbon neutrality and compliance plans for CORSIA; (c) the timelines fixed for achieving net-zero emissions in the aviation sector aligned with India’s climate goals; and (d) the mechanisms in place to monitor progress and address any gaps such as carbon footprint mapping and airport carbon accreditation?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Yettinahole Project
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3169 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
(a) the current status of the Yettinahole project; (b) whether all surveys, clearances and ground-level works have begun and if so, the number of the planned works completed so far; (c) whether the Government has the stated goal to supply drinking water to about seventy five lakh people across nine districts within two years and if so, the details thereof, district-wise along with the number of people per district and the proportion of the total target population that has already started receiving water supply; (d) the total estimated cost of the Yettinahole project as approved and utilised till date and the projected expenditure likely to be incurred during the next two years to meet the target; and (e) the measures being taken to ensure sustainable water distribution, prevent wastage, maintain quality standards and guarantee equitable supply across all nine districts, especially in the most water-scarce and hilly regions?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePollachi–Dindigul Four-Lane Highway Project
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3170 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
We have not ingested the asking members for this question.
(a) the total amount allocated and utilised so far for the Pollachi–Dindigul four-lane highway project implemented under the Bharatmala Pariyojana scheme; (b) the present stage of progress of the project and the expected time-frame for its completion; and (c) whether any delay has occurred due to monsoon or other reasons and if so, the details thereof along with the revised completion schedule?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.