Use of BIM Technology in SCM
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3171 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) the details of the Smart City projects wherein Building Information Modelling (BIM) technology has been used including the project name, location and cost of the project in the country, State-wise including Bihar; (b) the details of the funds allocated and utilised for these projects along with the benefits achieved through the use of BIM technology; (c) the names of the engineers and companies involved in the implementation of BIM technology in these projects; (d) the impact of BIM technology on the efficiency and productivity of these projects, including reduction in construction time and cost, if any; and (e) the plans of the Government to promote the adoption of BIM technology in other Smart City projects across the country, State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational Highway Projects in Rajasthan
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3172 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the number of approved National Highway projects in the last ten years in Rajasthan and across the country including Dausa which are currently delayed; (b) if so, the number and status, State-wise and project-wise along with the estimated cost thereof; (c) the number of National Highway projects for which bids were invited and received during the last ten years but construction is yet to begin and the reasons therefor; (d) whether the Government is taking any specific policy or corrective measures to ensure timely completion, check cost escalation and expedite the work on these delayed National Highway projects; and (e) whether the Government is preparing any action plan to restart and complete all pending or not yet started National Highway projects in a timely manner in Rajasthan including Dausa, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRural Households covered under JJM in Rajahmundry
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3173 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
We have not ingested the asking members for this question.
(a) the current number of rural households provided with safe and adequate drinking water through household tap connections under the Jal Jeevan Mission (JJM), particularly in Rajahmundry Lok Sabha Constituency; (b) the key focus areas of the Mission’s next phase regarding sustainability, functionality and community participation to ensure long-term reliable water supply; (c) the manner in which the Mission is integrating digital innovations such as Geographic Information System (GIS) and predictive analytics for monitoring and transparency; (d) the role of district administrations in strengthening governance and ensuring continuous service delivery under the Mission; and (e) the examples of community-led success stories demonstrating the impact of the Mission on rural water management?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSFURTI Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3174 · Asked on 2025-12-18
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the details of number of clusters approved, functional/operational, pending clearance and yet to commence including handloom clusters under the Scheme of Fund for Regeneration of Traditional Industries (SFURTI) along with their status across the country during the last five years, State-wise and district-wise in Andhra Pradesh, especially in Eluru district; (b) whether the Government has identified reasons for delays in operationalizing clusters in the various States including Andhra Pradesh and the steps being taken to address these delays; (c) the total funds allocated, released and utilized under the SFURTI scheme in the country, State-wise and district-wise in Andhra Pradesh including the Eluru Lok Sabha Constituency during the last five years; and (d) the details regarding the total number of individuals, especially women and youth, who have been benefited by the SFURTI scheme during the last five years across the country, State-wise and district-wise in Andhra Pradesh including the Eluru Lok Sabha Constituency?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceShortage of Air Traffic Controllers
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3175 · Asked on 2025-12-18
Ministry: CIVIL AVIATION
Member asked
We have not ingested the asking members for this question.
(a) whether it is a fact that there is an operational overload of Air Traffic Controllers (ATCOs) and if so, the details thereof; (b) the number of ATCOs deployed per airport along with their working hours, airport-wise; (c) the number of vacancies for ATCOs, airport-wise; (d) whether the Government intends to develop a Fatigue Risk Management System for ATCOs, if so, the details thereof and if not, the reasons therefor; and (e) whether it is a fact that excessive fatigue in ATCOs poses a direct and ongoing threat to airspace safety and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAuthorised Petroleum Retail Outlets
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3176 · Asked on 2025-12-18
Ministry: PETROLEUM AND NATURAL GAS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware that the islands of Chetlat, Kadmat, Kiltan, Agatti and Amini in the Union Territory of Lakshadweep are facing difficulties due to the absence of authorised petroleum retail outlets, if so, the details thereof; (b) whether any proposals have been submitted by the Lakshadweep Administration or Oil Marketing Companies for establishing petroleum outlets in these islands; (c) if so, the details thereof along with the present status of such proposals including approvals, land availability and expected timelines; (d) whether the Government proposes to prioritise the establishment of petroleum outlets in these islands considering their essential role in supporting transportation, fisheries, power generation and public services, if so, the details thereof; and (e) the time by which petroleum outlets are likely to be commissioned in Chetlat, Kadmat, Kiltan, Agatti and Amini to ensure uninterrupted fuel supply to the residents?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUnified Metropolitan Transport Authority for Tiruchirappalli
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3177 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware that the proposal to establish a Unified Metropolitan Transport Authority (UMTA) for Tiruchirappalli selected under the National Urban Transport Policy (NUTP) has remained non-functional for the last several years and if so, the details thereof; (b) whether any funds, operational guidelines or legislative support have been provided to the State Government of Tamil Nadu to facilitate the setting up of UMTA for Tiruchirappalli and if so, the details thereof; (c) whether the Union Government has taken steps to coordinate with the State Government and local authorities to revive and operationalise the UMTA framework for Tiruchirappalli; (d) if so, the current status of the proposal and the expected timeline for its implementation; and (e) whether the Government would consider providing technical and financial assistance to expedite the formation of UMTA for Tiruchirappalli in view of its importance in improving urban mobility and integration of various transport modes and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExpansion of City Gas Distribution Network in Karnataka
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3178 · Asked on 2025-12-18
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) the present status of the City Gas Distribution (CGD) network expansion across the country, State/UT-wise, particularly for the State of Karnataka; (b) whether any subsidies or incentives are available or proposed for consumers switching from LPG to PNG, if so, the details thereof; and (c) the time by which PNG is made available in all Tier-2 and Tier-3 cities for door-to-door gas supply through pipelines across the country, State/UT-wise, particularly in the State of Karnataka?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFlood Management and Border Area Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3179 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
(a) whether the Union Government maintains data on flood-related damage to crops, land and loss of life in West Bengal during the last eleven years and if so, the details thereof, year-wise; (b) whether it is true that no funds were released by the Union Government for the Ghatal Master Plan upto December, 2023 and if so, the details thereof; and (c) the allocation of funds under the Flood Management and Border Areas Programme (FMBAP) since its inception, year and State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRole of State Governments and ULBs in PM SVANidhi Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3180 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the role of State Governments and Urban Local Bodies (ULBs) in identification of beneficiaries, verification of applications and facilitation of loan disbursal under the PM SVANidhi scheme; (b) the total number of new beneficiaries registered under the restructured scheme since its launch; (c) the number of beneficiaries who have successfully availed the second loan and the total number to whom UPI-linked RuPay Credit Cards have been issued or disbursed under the scheme; (d) the details of the number of street vendors registered as beneficiaries under the scheme along with the total amount sanctioned and disbursed to all beneficiaries, State/UT-wise; and (e) the details of the number of lending institutions including Scheduled Commercial Banks, Regional Rural Banks, Small Finance Banks, Cooperative Banks, NBFCs and MFIs functioning in Odisha, district-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDisplacement due to Doongri Dam
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3181 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
(a) whether around 76 villages are expected to be displaced completely or partially due to proposed Doongri Dam in Sawai Madhopur–Karauli of Rajasthan and if so, the details thereof; (b) the official data of the total population, agricultural land, forest land, pastureland, religious places, households, livelihood means and livestock likely to be displaced due to the said project; (c) whether the options like alternate design/location/height of Doongri Dam have been considered and if so, the details thereof; (d) whether the Environmental Impact Assessment (EIA) and the Social Impact Assessment (SIA) reports have been completed and if so, the details thereof; (e) whether the consent of the concerned Gram Sabhas has been obtained and if so, the details thereof; and (f) whether the Government proposes to discontinue the project operations without ensuring resettlement of the affected 76 villages, land compensation, livelihood security and consent of the Gram Sabha, if so, the time by which it is likely to be done and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAdequate Representation in BBMB
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3182 · Asked on 2025-12-18
Ministry: POWER
Member asked
We have not ingested the asking members for this question.
(a) whether Rajasthan which is a major partner State in the sharing of the waters of the Ravi Beas rivers has not been provided appropriate representation in the Bhakra Beas Management Board (BBMB) in accordance with the agreements made and decisions taken in the previous meetings, if so, the details thereof; (b) the steps being taken by the Government and BBMB to provide appropriate representation to Rajasthan including the creation of any additional position for a full time member from Rajasthan; (c) whether the Bhakra Beas Management Board (BBMB) consists mainly of officers from the successor States of United Punjab (as defined in the Punjab Reorganization Act, 1966) at present and Rajasthan is not adequately represented; (d) if so, the measures proposed to include officers from Rajasthan in key positions in BBMB along with details of timeline and procedure for their appointment; and (e) if not, the time by which the representation from Rajasthan is likely to be ensured?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConstruction of Greenfield Expressway
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3183 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the specific targets set for Greenfield Expressway construction for the remaining part of the financial year 2025-26; (b) the manner in which the ministry is using the InvIT mechanism to monetise highway assets and generate fresh capital after August 2025; (c) whether any new policy has been adopted to expedite land acquisition by streamlining the compensation process, if so, the details thereof; (d) the progress in the implementation of Satellite-Based Toll Collection System (SBTC) on major corridors; and (e) the measures taken by the Ministry to promote the use of recycled materials like plastic and fly ash in road construction?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePower Supply to National Grid
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3184 · Asked on 2025-12-18
Ministry: POWER
Member asked
(a) the current total installed power generation capacity in the country along with the latest available figures indicating the respective shares of fossil fuel-based and non-fossil fuel-based sources; (b) the portion of this installed capacity that is presently generation-ready and capable of supplying power to the national grid together with the criteria used to determine grid-readiness; (c) whether the quantum of installed generation capacity remains unutilised or under-utilised due to the absence or inadequacy of transmission infrastructure, if so, the details thereof, State-wise; and (d) the timelines proposed by the Government for completing the transmission infrastructure necessary to ensure timely evacuation, grid integration and optimal utilisation of power across all regions of the country?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInclusion of Dakshina Kannada under Atal Bhujal Yojana
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3185 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
(a) whether the Government has received any proposal or recommendation from the State Government of Karnataka to include Dakshina Kannada district under the Atal Bhujal Yojana (Atal Jal); (b) if so, the details thereof including the taluks or Gram Panchayats proposed to be covered and if not, the reasons therefor; (c) whether the Government has conducted any recent survey or study to identify the causes of water scarcity or depletion of drinking water sources in Mangalore and other parts of Dakshina Kannada district; (d) if so, the details and key findings thereof; and (e) the present status of groundwater levels in each Gram Panchayat of Dakshina Kannada district along with comparative data on changes observed from 2020-21 to 2024-25?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceHousing for All
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3186 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether the Government has reviewed the implementation of the Pradhan Mantri Awas Yojana - Urban (PMAY-U) 2.0 and other urban housing schemes to ensure “Housing for All”, if so, the status of number of houses sanctioned, completed and occupied, State-wise and if not, the reasons therefor; (b) whether any initiatives have been taken to improve urban infrastructure including transport, sanitation, water and housing in Tier-II and Tier-III cities and peripheral areas, if so, the details thereof including budget, timelines and projects initiated and if not, the reasons therefor; (c) whether the Government has mechanisms for monitoring urban development projects ensuring inclusion of economically weaker sections and addressing urban migrants’ housing needs, if so, the details and findings thereof and if not, the reasons therefor; and (d) the details regarding the latest evaluation of urban housing and infrastructure programmes, gaps identified, corrective action taken and budget utilisation for the purpose?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStreet Lights on National Highways in West Bengal
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3187 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether the full stretch of National Highways in West Bengal are covered with street lights, if so, the details thereof; (b) if not, the details and number of kilometres of highways that are uncovered; and (c) the timeframe by which the total portion will be covered with street lights?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceContaminated Water in Faridkot, Punjab
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3188 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
(a) the total number of rural houses in Punjab, particularly in Faridkot Lok Sabha Constituency and the number of houses out of these with tap water connection/supply; (b) the total number of habitations in Punjab and the number of habitations out of these affected by arsenic, fluoride and other contamination; (c) whether the water level in Punjab is continuously going down and also becoming poisonous and if so, the details thereof along with the projects implemented/being implemented by the Government to prevent this; and (d) the budget allocated and spent on these projects during the last five years?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRoutes under UDAN 5.4 Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3189 · Asked on 2025-12-18
Ministry: CIVIL AVIATION
Member asked
(a) the total number of routes operationalised under the UDAN scheme since its inception in the country including those connecting various cities in Tamil Nadu; (b) whether the Government has launched UDAN Version 5.4 to enhance regional air connectivity and if so, the details thereof; (c) the objectives and key features of UDAN 5.4, particularly with respect to improving air services in Tamil Nadu; (d) the number of routes and airports in Tamil Nadu proposed to be covered under UDAN 5.4; (e) whether the scheme gives special focus to underserved and unserved regions and Tier-2/Tier-3 cities in Tamil Nadu and if so, the details thereof; (f) the current status of airport infrastructure in the said State to support the new UDAN 5.4 routes; and (g) the steps taken to monitor performance and ensure timely implementation of UDAN 5.4 in the said State?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRapid Rail Project in Meerut
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3190 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether the Rapid Rail Project in Meerut has been completed in September, 2025 and if so, the details thereof; and (b) the time by which the Rapid Rail and Meerut Metro are likely to be inaugurated?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAffordable Housing Partnership
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3191 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government intends to increase the Central assistance per dwelling unit under Affordable Housing in Partnership (AHP) vertical in response to increased construction cost, if so, the details thereof and if not, the reasons therefor; (b) whether the Government is not increasing the Central assistance only because it would take more time and if so, the details thereof; and (c) whether the Government has conducted any survey on increased cost of construction, if so, the details thereof along with its impact on urban landless, Economically Weaker Section (EWS) households and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExpansion of CBG and Green Hydrogen Projects in Uttar Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3192 · Asked on 2025-12-18
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) the details of the Government monthly/annual target plan for setting up and expansion of Compressed Biogas (CBG) plants and Green Hydrogen Projects in Uttar Pradesh; (b) the number of plants/projects likely to be commissioned in industrial areas during the next three years; (c) the manner in which the skill development schemes of the Ministry are contributing in providing training and permanent employment to the youths belonging to SC/ST/OBC categories for smooth operation and maintenance of CBG and Green Hydrogen projects; and (d) the number of the youths trained and employed through these schemes during the last two years, district-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMajor Schemes under AMRUT 2.0
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3193 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the details of the major measures and schemes undertaken under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0; (b) the present status of projects under the AMRUT 2.0 and the number of projects completed, in progress and the projects for which tenders have been issued; and (c) the details of the efforts made by the Government regarding financial allocation and its utilisation under the AMRUT 2.0?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceKhadi Gramodyog Vikas Yojana
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3194 · Asked on 2025-12-18
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the number of Khadi and Village Industries clusters and individual units established in Uttar Pradesh during the last three years, district-wise; (b) the details of funds sanctioned, released and utilized under the Khadi Gramodyog Vikas Yojana to Uttar Pradesh; and (c) the total employment generated, including the number of women, SC/ST and minority beneficiaries supported through these initiatives, district-wise in Uttar Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment of Airports in Tamil Nadu
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3195 · Asked on 2025-12-18
Ministry: CIVIL AVIATION
Member asked
We have not ingested the asking members for this question.
(a) the total number of existing airports developed/proposed to be developed in Tamil Nadu during the last five years; (b) the total number of airports that are under expansion/proposed for expansion in Tamil Nadu, airport-wise; (c) the total funds allocated, disbursed and utilised for the development/expansion of airports in Tamil Nadu, airport-wise; and (d) whether the Government has any proposal to construct/start new airports in Tamil Nadu, if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.