Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 11,126–11,150 / 34,220
MSME Credit Growth in Tamil Nadu
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3121 · Asked on 2025-12-18
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the total Credit extended to Micro, Small and Medium Enterprises (MSME) by Scheduled Commercial Banks and NBFCs in Tamil Nadu since Financial Year 2021, including volume distribution by sector, ticket size and district and year-wise; (b) the steps taken to improve financial literacy and expand formal credit access for unserved MSMEs in Tamil Nadu, ensuring equitable regional and industrial distribution; (c) the monitoring mechanisms to address rising delinquencies, credit quality concerns and vulnerabilities from demand volatility and supply chain issues affecting Tamil Nadu MSMEs; and (d) the reforms proposed for risk management, comprehensive credit assessment and sustainable MSME credit growth in Tamil Nadu aligned with Budget 2025-26 allocations?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePM Vishwakarma Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3122 · Asked on 2025-12-18
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the aims and objectives of PM Vishwakarma Scheme launched in 2023; (b) the extent to which the above scheme is helping in end-to-end support to artisans and craftspeople of traditional trades; (c) whether 21,64,000 applications have been received from the State of Andhra Pradesh under the above scheme; (d) if so, the details thereof, district-wise and the reasons that only 2.22 lakh applications have only been registered so far; (e) the reasons the other applications have not been registered and steps being taken by the Government to register maximum applications; and (f) the benefits available for registered applicants under the above scheme and details of benefits actually extended to registered people since implementation of the scheme in Andhra Pradesh, district-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFHTCs under Jal Jeevan Mission in Assam
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3123 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
(a) the total number of households that have been provided Functional Household Tap Connections (FHTCs) under the Jal Jeevan Mission in Assam; (b) the current shortfall in achieving universal household tap connections in the said State; (c) the reasons for delays, if any, in meeting the targets; and (d) the details of funds yet to be released to the State Government of Assam under the said Mission?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Schemes for Development of FPI
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3124 · Asked on 2025-12-18
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is implementing special schemes for development of food processing industries in tribal and rural areas in Parliamentary Constituency no.-24, if so, the details thereof; (b) whether a brief description of currently operational schemes and the number of beneficiary individuals and institutions under them is available, if so, the details thereof; (c) the financial assistance, the grant rate and eligibility conditions being provided for establishment of food processing units in these areas; and (d) whether the Government is considering to launch new schemes for expansion in this sector in the near future and if so, the details thereof, if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAllotment of Petrol Pumps to OBC/SC/ST/General Category
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3125 · Asked on 2025-12-18
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) the number of eligible candidates belonging to OBC, SC, ST and General category in Aonla Parliamentary Constituency of Uttar Pradesh who have been allotted petrol pumps during the previous years; (b) the details of allotment, selection process and the total number of applications received and the applications finally accepted in this regard, year-wise and category-wise; (c) whether the Government has taken any corrective measures to ensure a transparent and efficient draw system in the Aonla region especially for applicants from reserved categories, if so, the details thereof; and (d) whether any proposal is under consideration with the Government to increase separate quota or additional allocation for OBC, SC, ST and General Category for new petrol pumps in the area in future, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment of Nuclear Power Plants by NTPC
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3126 · Asked on 2025-12-18
Ministry: POWER
Member asked
whether the Government is aware that the State run thermal power giant National Thermal Power Corporation (NTPC) is contemplating to develop nuclear power plants in different States aiming at achieving the target of 150 GW by 2032 for meeting future power demand and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConstruction of NE-7 Chennai-Bengaluru Express Highway
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3127 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether there is an inordinate delay in completion of Phase-2 and Phase-3 (106 km stretch in Tamil Nadu and 85 km stretch in Andhra Pradesh) in the construction of NE-7 Chennai–Bengaluru Express Highway and if so, the details thereof and the reasons therefor; (b) whether the Government has disbursed compensation amount for acquisition of land from private land owners for the construction of National Expressway-7 between the stretches, Gudipala–Walajapet, Walajapet–Arakkonam, Arakkonam–Kancheepuram and Kancheepuram–Sriperumbudur as per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 and if so, the details thereof; and (c) whether the Government is aware that some land owners are demanding their due compensation under the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 in Govindavadi near Kancheepuram, Tamil Nadu and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMaize based Processing Clusters in Karnataka
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3128 · Asked on 2025-12-18
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) whether the Government has identified Maize as the One District One Product (ODOP) for Davangere district, Karnataka under the PM Formalisation of Micro Food Processing Enterprises (PM-FME) Scheme and if so, the details thereof; (b) the steps being taken by the Ministry to promote maize-based value addition, processing clusters and market linkages in Davangere and neighbouring districts; (c) whether the Government proposes to extend credit support, technical training, and branding assistance to small and micro-entrepreneurs engaged in maize processing under the ODOP framework and if so, the details thereof; and (d) whether the Ministry has examined the feasibility of establishing a dedicated Maize-Based MEGA Food Park in Davangere, given its central location, strong maize production base and logistics connectivity and if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDelhi Master Plan 2021
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3129 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the details and key parameters of the Master Plan for Delhi (MPD) 2021; (b) whether nearly 1,270 group housing societies in Delhi have not been able to benefit from it for the last nineteen years and if so, the reasons therefor; (c) the steps taken by the Government for the redevelopment of the aforesaid group housing societies; (d) the measures taken to remove rigid and impractical conditions imposed primarily by the DDA/MCD which are causing obstacles in redevelopment and modernisation; (e) whether the Government is reconsidering the redevelopment policy in view of the difficulties faced by such societies and if so, the details thereof; (f) whether the Government is considering removing the four-hectare plot-size requirement to make the redevelopment approach more feasible and if so, the details thereof; (g) whether the Government has received any letters or representations from the Hon’ble Members of Parliament or other forums on this matter; and (h) if so, the details thereof along with the action taken by the Government in this regard?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOutstanding Dues of Power Generation Companies
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3130 · Asked on 2025-12-18
Ministry: POWER
Member asked
(a) the details of the total outstanding dues of power generation companies (GENCOS) on power distribution companies (DISCOMs) at present; and (b) the corrective steps taken/proposed to be taken by the Government in this regard?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFunctioning of EMRS in Kerala
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3131 · Asked on 2025-12-18
Ministry: TRIBAL AFFAIRS
Member asked
(a) whether the Government has assessed the present state of infrastructure in Eklavya Model Residential Schools (EMRS) functioning in Kerala; (b) if so, the details of deficiencies reported with respect to classrooms, hostels, sanitation facilities, ICT infrastructure and availability of trained teaching and non-teaching staff; (c) whether the Government has taken steps to expedite the completion of sanctioned EMRS projects in Wayanad, Palakkad, Idukki and other tribal-dominated districts in Kerala and if so, the details thereof; (d) whether additional financial or technical support is proposed to upgrade existing EMRS facilities to meet national standards, including provisions for smart classrooms, digital learning tools, sports infrastructure and gender-sensitive hostel arrangements, if so, the details thereof; and (e) the timeline within which the Government proposes to bridge the infrastructure gaps and ensure full operationalisation of all sanctioned EMRS in Kerala?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRoutes under UDAN Scheme for Tamil Nadu
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3132 · Asked on 2025-12-18
Ministry: CIVIL AVIATION
Member asked
(a) the total number of routes currently operational under the UDAN scheme in Tamil Nadu along with their passenger load factors; (b) the steps taken to ensure timely commencement of new UDAN routes and to maintain regular flight operations; (c) whether regional airports are being upgraded to handle increased air traffic under the UDAN scheme and if so, the details thereof; (d) the measures taken to monitor airline compliance, safety standards and service quality on UDAN routes; and (e) the initiatives taken/proposed to be taken to promote tourism, business and economic growth through enhanced regional air connectivity under the UDAN scheme?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWater-body Restoration Projects under PMKSY in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3133 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
(a) the details of the number of water bodies selected for restoration under the Repair, Renovation and Restoration of Water Bodies (RRR) component of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) in Andhra Pradesh since 2018-19, district-wise; (b) the total funds approved, released and utilised under this component in the State, year-wise, including the Central and State share; (c) the number of projects completed, under implementation and pending out of the total approved water-body restoration projects, district-wise; and (d) whether the Government proposes to expedite release of funds and approve revised or new proposals submitted by the State for timely completion of these projects and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBoosting MSME Exports
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3134 · Asked on 2025-12-18
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the total value of Micro, Small and Medium Enterprises (MSME) exports in FY 2025-26 and the sectors that have shown the highest export growth; (b) the initiatives taken by the Government to promote MSME participation in global value chains; (c) the steps taken to provide financial and logistical support to MSMEs to boost their export potential; and (d) the details of any collaborations with international trade organisations to enhance MSME exports?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of the LIFE Mission in Kerala
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3135 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the number of the beneficiaries selected, houses completed and under construction under the Livelihood, Inclusion & Financial Empowerment (LIFE) Mission in Kerala, district-wise; (b) whether the Government is aware of delays in construction and irregular fund flow caused by financial constraints of local bodies and if so, the details of steps taken to ensure smooth disbursal including the reported Rs. 1,500 crore borrowing to clear pending dues; (c) whether the Government has taken any measures to ensure that landless, homeless and tribal families in Thiruvananthapuram district receive their houses in a time-bound manner with updated unit cost reflecting current construction inflation, if so, the details thereof and if not, the reasons therefor; and (d) the steps taken by the Government to monitor district-level implementation, fund-flow transparency and completion rates to ensure timely completion and accountability?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGOBARdhan Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3136 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
We have not ingested the asking members for this question.
(a) the total financial assistance given by the Government under the GOBARdhan Scheme to eligible Gram Panchayats in Andhra Pradesh during the last three years, year and district-wise; (b) the number of Biogas/Compressed Biogas (CBG) plants established in Andhra Pradesh, district-wise; (c) whether there is a systematic process in place for identifying and prioritizing villages with a high population of cattle for the implementation of the GOBARdhan Scheme and if so, the details thereof; and (d) the steps taken/being taken to ensure that such villages receive adequate financial support, technical assistance and community engagement to maximize the benefits of the said scheme?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceReluctance of States in Implementation of JJM
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3137 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
(a) whether some States are reluctant to implement the Jal Jeevan Mission (JJM) in its full spirit and if so, the details thereof along with the reasons therefor; (b) whether it is true that laying of pipelines is undergoing without ensuring the source of water and if so, the details thereof; and (c) the steps taken/being taken by the Government to ensure strict action against the misuse of drinking water for commercial or industrial purposes?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSurplus Land held by NHAI
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3138 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the details of surplus land held by the National Highways Authority of India (NHAI), State-wise and district-wise in Tamil Nadu; and (b) whether the Government has proposed to develop these surplus lands with the help of private players, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAir Connectivity to Smaller Towns
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3139 · Asked on 2025-12-18
Ministry: CIVIL AVIATION
Member asked
Rajesh Verma, Lata Wankhede, Atul Garg
(a) the details of new airports recently established and the manner in which this rapid expansion would improve connectivity for smaller towns while complementing the UDAN scheme in the country, particularly in Bihar; (b) the current statistical data of UDAN including the total number of operational routes and connected airports and the present status, locations and function of the UDAN Yatri Café initiative; (c) the expanded operational framework and the specific resource allocation including Viability Gap Funding (VGF) for UDAN’s planned extension to 120 new destinations enabling affordable travel for an additional four crore passengers; (d) the details of the “Fares Se Fursat” fixed low airfare scheme and the manner in which such fixed-fare initiatives would stabilise air ticket prices for the passengers; and (e) the steps being taken to leverage infrastructure growth and the extended UDAN framework beyond 2027 to stabilise ticket prices and ensure sustainable and affordable air travel?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExpansion of Domestic MRO Infrastructure
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3140 · Asked on 2025-12-18
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government is aware that our country continues to remain heavily dependent on foreign Maintenance, Repair and Overhaul (MRO) facilities resulting in a significant outflow of foreign exchange and if so, the details thereof; (b) whether the Government proposes to expand domestic MRO infrastructure to minimise this dependency; and (c) if so, the details thereof along with the proposed timeline fixed for strengthening MRO ecosystem of the country in future?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceData on Urban Housing and Urban Infrastructure Development
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3141 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether the Government has compiled State-wise data on urban housing shortages among EWS and LIG households under schemes such as Pradhan Mantri Awas Yojana - Urban (PMAY-U), Affordable Rental Housing Complexes (ARHC) and the Urban Infrastructure Development Fund and if so, the details thereof during each of the last three years; (b) whether Odisha has submitted proposals seeking central assistance for addressing housing gaps in rapidly urbanising cities including those with high slum concentrations and if so, the details thereof; (c) whether any affordable housing, rental housing or urban infrastructure projects from Odisha have been approved or are under consideration for funding support under PMAY-U or ARHC; and (d) if so, the details thereof including sanctioned units, central share released and timeline fixed for project completion?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Completion of Projects under the Smart Cities Mission
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3142 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) whether it is true that out of the hundred cities selected under the Smart Cities Mission, only a few cities have actually completed all their approved projects and if so, the number of cities that have met full completion of targets; (b) the number of extensions granted since the launch of the said Mission; (c) the total numbers of incomplete or stalled projects on the ground, city and State-wise; and (d) whether there is any revised completion deadline for the remaining unfinished projects, if so, the time by which the said Mission is expected to be fully completed across all the hundred cities?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceChallenges faced by PMFME Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3143 · Asked on 2025-12-18
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) the challenges identified with respect to credit access, skill development, market linkages and infrastructure utilisation during the implementation of the Pradhan Mantri Formalisation of Micro Food Processing Enterprises (PMFME) scheme and the measures being taken to address them; (b) the number of incubation centres presently operational under the above scheme and whether the Government proposes to establish additional centres to expand access to common facilities for micro food processing units and if so, the details thereof; (c) whether the Ministry has used any indicators to evaluate the effectiveness of the training and capacity-building programmes and if so, the details thereof; (d) the measures being taken based on such evaluation to further improve training and capacity-building programmes; and (e) the future plans for strengthening incubation and support facilities under the PMFME scheme?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUrban Mobility and Metro Rail Expansion
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3144 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
Basavaraj Bommai, Khagen Murmu, Tejasvi Surya
(a) whether the Government has ensured that ongoing Metro Rail projects including Bengaluru Metro meet revised timelines and cost estimates, if so, the details thereof and the measures taken to address rising raw material costs; (b) the key objectives of the proposed National Urban Transport Policy (NUTP) 2025 and the manner in which it would mandate integration of public transport, cycling and pedestrian infrastructure; (c) the details of the initiatives being considered to ensure mandatory adoption of National Common Mobility Card (NCMC) standards across all new and existing Metro and Bus systems across the country; and (d) the features of NCMC in different metro rail system along with the status of its implementation?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Solid Waste Management Policy
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3145 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether the Government has taken cognizance of garbage burning, especially at tourist spots in Barabanki district of Uttar Pradesh and a solid waste management policy has been implemented in the district and if so, the details thereof; (b) whether the Government has identified shortcomings in the implementation of the solid waste management policy in the district and if so, the details thereof; and (c) whether the Government proposes to undertake a comprehensive review of such policy so that municipal waste is properly segregated and disposed of and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.