Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 9,801–9,825 / 34,220
Implementation of Schemes in Karnataka
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1064 · Asked on 2026-02-05
Ministry: JAL SHAKTI
Member asked
(a) whether there is any monitoring mechanism in place to track fund flow and bill clearance under centrally sponsored and central sector schemes of the Ministry, if so, the details thereof and if not, the reasons therefor; (b) whether any advisory or directive has been issued to the State Governments to clear pending dues to vendors and contractors for smooth execution of various schemes under the Ministry within a fixed timeframe and if so, the details thereof; (c) whether any penalties are imposed or corrective measures are taken for repeated delays in fund utilisation by the State Governments and if so, the details thereof; (d) the steps proposed to be taken to strengthen financial discipline and transparency in the implementation of the Union Government’s schemes under the Ministry in Karnataka; and (e) the total amount of funds sanctioned and utilised in Karnataka under schemes such as Atal Bhujal Yojana, Jal Jeevan Mission, Jal Shakti Abhiyan and others during the Financial Years 2024-25 and 2025-26 till date?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePower Distribution Projects in Budaun
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1065 · Asked on 2026-02-05
Ministry: POWER
Member asked
(a) whether the Government has initiated projects to strengthen power distribution in Budaun district of Uttar Pradesh; (b) if so, the details thereof and if not, the reasons therefor; (c) whether any scheme has been implemented in the district to support Micro, Small and Medium Enterprises (MSMEs) and large industrial units like sugar mills and chemical plants through reliable power infrastructure and if so, the details thereof; and (d) the steps taken by the Government to adopt renewable energy, improve transmission lines and reduce power cuts to facilitate industrial development in Budaun?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFunds Sharing Pattern between Centre and States under AMRUT
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1067 · Asked on 2026-02-05
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the details of the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) including the fund sharing pattern between the Centre and the States; (b) the details of the cities currently under AMRUT in Jharkhand; (c) the details of the funds allocated and utilised under AMRUT in Jharkhand, project and district-wise; and (d) whether specific guidelines have been fixed to monitor and supervise the implementation of AMRUT at district and State levels and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceTribal Freedom Fighter Museums
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1068 · Asked on 2026-02-05
Ministry: TRIBAL AFFAIRS
Member asked
(a) whether the Government has proposed ten museums to honour the contributions of Adivasi freedom fighters and only three have been inaugurated so far; (b) if so, the details thereof; (c) whether there has been slow progress in setting up Tribal Freedom Fighters Museums across the country; (d) if so, the details thereof along with the reasons therefor; (e) whether the Government has taken any decision to complete the said museums on a time-bound basis; and (f) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExpansion of CGD Network and PNG Infrastructure in Sonipat
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1069 · Asked on 2026-02-05
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) whether the Government is aware that the establishment of natural gas-based industries in the Sonipat Lok Sabha Constituency has significant potential for industrial development and employment generation, if so, the details thereof; (b) whether it is a fact that the expansion of City Gas Distribution (CGD) network and Piped Natural Gas (PNG) infrastructure in the area is still inadequate causing difficulties to industries, if so the details thereof; (c) the number of proposals received and the number of proposals approved for setting up natural gas based industrial units in the said Constituency since 2018; (d) whether the Government has proposed any special package or policy to promote gas based industries, if so, the details thereof; and (e) the future action plan of the Government in this regard for the Sonipat area?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUrban Housing Shortages
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1070 · Asked on 2026-02-05
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether the Government has reviewed the persistent urban housing shortage of nearly twenty million units, of which over ninety five per cent pertains to Economically Weaker Sections and Low-Income Groups, despite substantial budgetary allocations over successive Five-Year Plans and if so, the details thereof; (b) whether the Government proposes targeted interventions to prevent the growth of slums and squatter settlements, particularly in metropolitan cities where a significant proportion of the population resides in informal housing and if so, the details thereof; (c) whether balanced economic and physical development of rural areas, small and medium towns and cities with populations below five lakh is being pursued to reduce migration pressure on metropolitan cities and if so, the details thereof; and (d) the measures being considered to strengthen coordination among financial institutions, State Governments, Urban Local Bodies and planners to ensure effective implementation of housing policies and sustainable urban development?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGrowth and Export Promotion of FPI
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1071 · Asked on 2026-02-05
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) the projected growth of India’s Food Processing Industry (FPI) over the next two years along with the major factors driving this growth; (b) the role of Government schemes such as the Production Linked Incentive scheme and Pradhan Mantri Kisan Sampada Yojana (PMKSY) in supporting this expansion; (c) the steps being taken to promote the rapidly growing organic food market, particularly for farmers and MSMEs; (d) the measures undertaken to strengthen processing, storage and cold chain infrastructure to reduce post-harvest losses; (e) the estimated employment generation and export growth expected from the food processing sector during the Financial Year 2026; and (f) the strategies in place to increase exports of value-added and organic food products, and the expected impact on farmers’ income and India’s share in global food markets?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMembership for Delhi Golf Club
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1072 · Asked on 2026-02-05
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether it is a fact that the Ministry of Housing and Urban Affairs nominates persons for Delhi Golf Club on ‘Out of turn’ and Limited Playing Rights basis as per the relevant clause of the Supplementary Lease Deed which provides for memberships in block of three, four or five years and if so, the details thereof; (b) the name and details of persons who have been nominated by the Ministry of Housing and Urban Affairs for Delhi Golf Club under the ‘Out of turn’ category from 2014 to till date; and (c) the details of guidelines/regulations based on which the Ministry selects persons for Delhi Golf Club under the ‘Out of turn’ category?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOperationalisation of Ambala Civil Airport
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1073 · Asked on 2026-02-05
Ministry: CIVIL AVIATION
Member asked
We have not ingested the asking members for this question.
(a) whether the terminal building at Ambala Civil Airport of Haryana has been constructed in accordance with prescribed airport regulatory norms and if so, the details thereof along with the passenger handling capacity of the terminal building; (b) whether the Government is aware that the State Government of Haryana has applied for an aerodrome licence and if so, the expected timeline for grant of the said licence; (c) the provisional number of apron bays available for commercial aircraft; (d) the time by which Ambala Civil Airport is likely to be operationalised; (e) the total strength and ranking of personnel posted at the Ambala civil terminal building; and (f) the details of infrastructure works still pending for operationalisation of flights?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRelaxation in Toll Tax to Advocates
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1074 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether the Government is considering any scheme/proposal to provide free FASTags or toll fee exemptions to the advocates as they have to move from more than one court, district/State/High Court regularly as a part of their profession and if so, the key features thereof; (b) whether the Government has made assessment of the fact that such a facility is likely to help in saving time in legal process, pleading a case on immediate basis and increasing the efficiency of the legal system and if so, the details thereof; (c) whether the Bar Council of India, State Bar Councils and advocates’ associations have been consulted on this matter; and (d) the concrete action plan of the Government to provide toll exemption facilities to the advocates for carrying out their professional duties in near future in the country particularly in Rajasthan including Dausa Lok Sabha Constituency?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePerformance of 2G Ethanol Plants
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1075 · Asked on 2026-02-05
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) the approved and actual capital cost and item-wise expenditure details of the 2G ethanol plant established at the Indian Oil Corporation Limited (IOCL) Panipat Refinery based on Praj Industries technology; (b) the installed production capacity of the plant, the commercial production start date and year-wise/quarter-wise actual production and capacity utilisation percentage since commissioning of the said plant; (c) whether the Government is aware that the production of the Panipat 2G ethanol plant has consistently remained below its design capacity and if so, the technical and operational reasons therefor; (d) the details of capacity cost commissioning date and actual production of 2G ethanol plants established by other Public Sector Oil Companies at locations including Bathinda, Odisha, Assam and Haryana, if so, the details thereof, plant-wise; and (e) whether any penalties have been imposed on the technology providers or Engineering Procurement and Construction (EPC) contractors for failure to achieve targets despite performance guarantees, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWayside Amenities on NHs
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1076 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
We have not ingested the asking members for this question.
(a) the number of Wayside Amenities (WSAs) planned, sanctioned, under construction and operational in the State of Andhra Pradesh, district-wise, along with the National Highways (NHs) on which they are located, especially in the Amalapuram Parliamentary Constituency; (b) the details of facilities provided or proposed for each sanctioned and operational WSA in Andhra Pradesh, site-wise; (c) the details of sanctioned WSAs which are facing delays along with the reasons and the revised completion timelines in Andhra Pradesh; (d) the details of tenders issued for the development/operation of WSAs during the last three years, including the mode of award (lease/PPP/revenue share), concessionaire/lessee, contract duration and present status in Andhra Pradesh; (e) the funds allocated, released and utilised for the development of WSAs in Andhra Pradesh during the last three years, year-wise and project-wise; and (f) the status of land and statutory clearances, including private-land franchise arrangements, and the timelines for completion of pending WSAs in Andhra Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceQuality and Safety on National Highways
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1077 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether the Government is aware of frequent collapse of roads constructed under the National Highways Authority of India; (b) if so, the details of quality audits conducted during the last three years, year-wise; (c) whether the Government has ensured that highway construction adheres to high-quality standards; and (d) the measures taken to improve the quality of road construction?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMega Food Park in Rajasthan
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1078 · Asked on 2026-02-05
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) whether the Government has proposed to establish a Mega Food Park in Rajsamand district of Rajasthan; (b) if so, the details thereof; and (c) the time by which the food park is likely to be made operational?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConnectivity of Kolkata Airport to Europe and USA
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1079 · Asked on 2026-02-05
Ministry: CIVIL AVIATION
Member asked
(a) whether it is a fact that there are no direct flights from Kolkata to Europe or the United States of America (USA) and if so, the details thereof along with the reasons therefor; (b) the number of direct flights from all metropolitan cities to Europe or the USA, airline-wise; (c) whether the Government proposes to incentivise Kolkata to Europe and the USA routes to enhance air connectivity; and (d) if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFlights from Kolkata to Jeddah, Saudi Arabia
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1080 · Asked on 2026-02-05
Ministry: CIVIL AVIATION
Member asked
(a) the details and the number of direct flights operating from the airports of the country to Jeddah, Saudi Arabia, airport and airline-wise including the weekly frequency of these flights; (b) whether the Government is aware of the hardships faced by passengers in the absence of direct flight connectivity between Kolkata and Jeddah and if so, the details thereof; and (c) whether the Government plans to incentivise airlines to operate direct flights between Kolkata and Jeddah and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDelay in Construction of National Highway in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1081 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
Supriya Sule, Dhairyasheel Mohite Patil
(a) whether the Union Government has taken note of the reported slowdown in National Highway construction in Maharashtra, including the total length constructed during the last five years, year-wise and the progress achieved in 2024–25 vis-à-vis the targets fixed for 2025–26; (b) whether major highway, expressway or corridor projects in the State have been delayed or stalled and if so, the project-wise reasons, cost overruns and revised timelines; (c) whether the impact of land acquisition delays, financing constraints, contractor capacity issues and pending clearances has been assessed; and (d) the steps taken to expedite stalled projects, improve coordination with the State Government, ensure timely fund release and mitigate adverse effects on employment, rural connectivity and industrial logistics in Maharashtra?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEstablishment of Food Testing Laboratories under PMKSY
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1082 · Asked on 2026-02-05
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has approved or proposes to establish hundred NABL-accredited food testing laboratories across country under Pradhan Mantri Kisan Sampada Yojana (PMKSY) during 2025–26, if so, the details thereof along with the total financial outlay and implementation timeline; (b) the number of such laboratories sanctioned, operationalised, under implementation as on date, along with the funds released and utilised; (c) whether any locations in Karur Parliamentary Constituency, including Assembly segments of Karur, Manapparai, Vedasandur, Viralimalai, Aravakurichi and Kadavur, have been identified or shortlisted for setting up these laboratories and if so, the details thereof along with the present status and timelines; (d) the criteria adopted for selection of locations if no such laboratory is proposed in above-mentioned areas and whether proposals from Tamil Nadu, particularly Karur region, are under consideration and if so, the details thereof; and (e) the manner in which these laboratories would support farmers, Farmer Producer Organisations (FPOs), Self Help Groups (SHGs), micro and small food processing units in quality testing of produce such as millets, pulses, oilseeds, milk, fruits, vegetables, seafood, facilitate compliance with FSSAI, export standards?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of AMRUT in Bihar
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1083 · Asked on 2026-02-05
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the present status of implementation of the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) in Bihar; (b) the number of cities included and the total funds allocated and utilised so far under AMRUT in Bihar, year and district-wise; (c) whether Buxar and Kaimur have been included under AMRUT and if so, the details of projects approved in Buxar related to water supply, sewerage, green spaces, roads and other urban infrastructure along with their current status, cost and expected completion timelines thereof; and (d) if not, whether the Union Government proposes to include the said cities in the upcoming phase of AMRUT and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Completion of NH Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1084 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
Neeraj Kushwaha Maurya, Lalji Verma
(a) the number of National Highway (NH) projects that have not been completed within the stipulated time since 2014, State-wise; (b) the reasons for serious delays in NH and other related projects in the country; (c) whether such delays have resulted in any increase in project cost and if so, the details thereof; (d) the amount of loans taken by the National Highways Authority of India (NHAI) for various projects from 2015 to till date, year-wise; and (e) the details of the proposed NHs passing through Ambedkar Nagar, Bareilly, Budaun and Shahjahanpur districts and the time by which the construction of the said highways are likely to be completed?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGroundwater Management and Drinking Water Schemes in Punjab
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1085 · Asked on 2026-02-05
Ministry: JAL SHAKTI
Member asked
(a) whether groundwater depletion and water quality issues in Punjab have been reviewed; (b) if so, the details of districts identified as most affected and the remedial measures proposed in this regard; (c) whether any new drinking water schemes or river rejuvenation projects are planned for Punjab; and (d) if so, the details thereof including funding pattern, implementation timeline fixed and expected outcomes?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSetting up of Thermal Power Plants in Bihar
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1086 · Asked on 2026-02-05
Ministry: POWER
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has discussed any plan with the State Government of Bihar to set up Thermal Power Plants (TPPs) and gas-based power plants including multi-purpose dam based power projects, small hydro power projects in rivers like Koshi, Mahananda and Karamnasa in view of voltage fluctuation, load shedding, tripping and power cut in crop season and shortage of 24X7 reliable power for industries in the Koshi-Simanchal region of the Bihar; and (b) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExpansion of Highways
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1087 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has undertaken any new projects planned for double laning and expansion of existing highways and if so, the details thereof; (b) the details of the funds allocated, sanctioned and released for National Highway (NH) projects, year and State-wise, particularly in Tamil Nadu; (c) whether the Government has conducted road safety audits for NH stretches across the country, particularly in Tamil Nadu and if so, the findings thereof; and (d) the number of accidents and fatalities reported on NHs during 2023, 2024 and the first half of 2025, year and State-wise and the steps being taken to curb the rising number of road accidents?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGanga Expressway
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1088 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
Lovely Anand, Rajkumar Chahar, Chandan Chauhan
(a) the current construction and commissioning status of the Ganga Expressway and other access-controlled expressways; (b) the safety audits and crash barrier standards enforced before opening these corridors; (c) the manner in which maintenance responsibilities are being monitored during the defect liability period; and (d) whether any penalties have been imposed on concessionaires for delays or quality deviations and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Speed Management Guidelines
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1089 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether the Government has taken steps to introduce and implement scientific speed management guidelines across the country, with speed limits determined based on road characteristics, built-up areas, road design and road usage; (b) if so, the details thereof and if not, the reasons therefor; (c) whether it is a fact that under Section 183 of the Motor Vehicles Act, 1988, there are no penalties for speeding by two-wheelers, whereas such penalties existed earlier; and (d) if so, the relevant provisions under the Motor Vehicles Act, 1988 that enable penalisation for speeding by two-wheelers?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.