Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 9,776–9,800 / 34,220
Frequent Power Cut during Peak Hours
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1038 · Asked on 2026-02-05
Ministry: POWER
Member asked
Satpal Brahamchari, Jai Parkash
(a) whether complaints regarding frequent power cuts and voltage fluctuations during peak hours are being received in the State of Haryana particularly in Hisar and Sonipat Parliamentary Constituencies, causing serious inconvenience to domestic consumers, farmers and industries and if so, the details thereof; (b) whether expansion of transmission and distribution infrastructure has not kept pace with the increasing demand and if so, the steps taken by the Government in this regard; (c) whether the implementation of Solar Feeder Scheme is not keeping with expected pace and if so, the details thereof; (d) the number of Solar Feeder sanctioned, set up and made functional in Sonipat parliamentary constituency since 2020; (e) the maximum peak load demand recorded in the Hisar Parliamentary Constituency since 2020 and corresponding availability of power supply during the same period; (f) whether the Ministry has taken any specific measures such as additional power generation, load management or grid strengthening to ensure uninterrupted power supply during peak hours and if so, the details thereof; and (g) the time-bound action plan of the Government to provide a permanent solution to these issues in Hisar region and of expansion of solar feeder and renewable energy based infrastructure in Sonipat Parliamentary Constituency in future?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInspection of Schemes under Jal Jeevan Mission
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1039 · Asked on 2026-02-05
Ministry: JAL SHAKTI
Member asked
(a) whether the Government has started countrywide inspection of various schemes under the Jal Jeevan Mission (JJM) following concerns related to cost escalation and quality of implementation; (b) if so, the details thereof including the total number of schemes and districts covered and the parameters being assessed during the said inspection; (c) whether the Government has any data on the number of such schemes under JJM where the actual cost has significantly exceeded the initial estimates and if so, the details thereof, State/UT-wise including Maharashtra; (d) the original estimated outlay under JJM since its inception and the cumulative cost of schemes under JJM approved so far; and (e) the measures being taken by the Government to improve cost efficiency, enhance transparency in tendering and ensure timely completion of water supply schemes under JJM?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProjects on NH-183 and NH-183A
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1040 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
We have not ingested the asking members for this question.
(a) the details of National Highway (NH) projects on NH-183 and NH-183A in the Mavelikkara Lok Sabha Constituency for which financial sanction is pending, stretch-wise; (b) the year of proposal, DPR cost, stage at which financial sanction is pending and the reasons for such pendency, including land acquisition, revised cost estimates or inter-ministerial clearances; (c) the amount already committed or partially sanctioned, if any, and the balance funds required for commencement or completion of works; (d) whether the delay in financial sanction has led to cost escalation, traffic congestion or safety concerns and the assessment made in this regard; and (e) the timeline proposed for according financial sanction and initiating works on the pending stretches?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAvailability of LPG Agency in Rural Areas
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1041 · Asked on 2026-02-05
Ministry: PETROLEUM AND NATURAL GAS
Member asked
We have not ingested the asking members for this question.
(a) whether the number of Liquefied Petroleum Gas (LPG) agencies in the rural, tribal and remote areas of the Ratlam Parliamentary Constituency is inadequate resulting in serious difficulties for consumers in obtaining gas connections, timely refilling and distribution, if so, the details thereof; (b) whether the Government has conducted any survey, site selection or prepared any proposal for approval of new LPG agencies or expansion of existing agencies in the said Constituency, if so, the details thereof; and (c) whether the Government proposes to approve new LPG agencies promptly, keeping in view the population, geographical location and consumer demand in the area, if so, the likely timeframe thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of EMRSs and Vacancies
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1042 · Asked on 2026-02-05
Ministry: TRIBAL AFFAIRS
Member asked
(a) the details of funds (in Rs.) sanctioned, allocated and utilised under Eklavya Model Residential Schools (EMRSs) since the inception of the scheme, States/UT-wise and year-wise; (b) the details of faculty and non-faculty sanctioned and vacant posts in EMRSs as of, 01 January 2026, category-wise and State-wise; (c) the number of EMRSs with no faculty, less than 10 faculty members and less than 20 faculty members, category-wise; and (d) the details/numbers of the dropout of students of EMRS since the inception of the scheme, year-wise and State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSix-Lane Port Road Connectivity on NH-516C
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1043 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether the Government has proposed a six-lane connectivity to the Port Road from the Sabbavaram–Sheelanagar section of NH-516C, proposed with an estimated cost of Rupees 964 crore, covering Visakhapatnam and Anakapalli districts of Andhra Pradesh, and if so, the details thereof; (b) the details of expenditure incurred so far on the above project; and (c) the expected date of completion of the project?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceVacant Posts in DGCA
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1044 · Asked on 2026-02-05
Ministry: CIVIL AVIATION
Member asked
(a) the total number of sanctioned posts notified in the Directorate General of Civil Aviation (DGCA) as on 15.01.2026; and (b) the total number of vacant posts at different levels as on 15.01.2026 and the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational Highway Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1045 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
We have not ingested the asking members for this question.
(a) the details of all National Highway projects sanctioned during the last five years, indicating the name of the project, length, estimated cost, year of sanction and scheduled timeline for completion, State/Union Territory-wise; (b) the current status of implementation of each such project, State/UT-wise, indicating whether the project is completed, under execution or delayed along with the percentage of physical and financial progress achieved so far; (c) the present status of land acquisition for these projects, State/UT-wise, including the extent of land required, land acquired to date, compensation paid and cases pending due to disputes or litigation; and (d) the details of fund allocation, disbursed and expenditure incurred for ongoing National Highway projects during the said period, project-wise and State/UT-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceHouses allotted in Uttarakhand under PMAY-U
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1046 · Asked on 2026-02-05
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the number of new houses sanctioned under the Pradhan Mantri Awas Yojana – Urban (PMAY-U) 2.0 in various municipal bodies of Uttarakhand; (b) the present construction status of these houses; (c) the process of selection of beneficiaries and assistance disbursal; and (d) the details of the Government’s schemes to provide additional houses to the urban poor in Uttarakhand in future?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceParallel Water Pipeline Project in Solapur
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1048 · Asked on 2026-02-05
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether the Government is aware of the delays and non-performance of the Parallel Water Pipeline Project in Solapur integrated under the Smart City Mission (SCM) and if so, the details thereof; (b) whether any inquiry or review has been conducted to ascertain the reasons for the delay, cost overruns and under-delivery of intended benefits to citizens under SCM and if so, the details thereof; (c) whether additional funds are being sanctioned or proposed for completing the project and improving city-level water infrastructure in Solapur under SCM and if so, the details thereof; and (d) the time by which the project is expected to be fully operational and provide reliable water supply to the residents of Solapur?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDigital Highway Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1049 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
Omprakash Rajenimbalkar, Sanjay Deshmukh
(a) the details of Digital Highway Projects being implemented across the country, particularly in Maharashtra; (b) the details of the total funds allocated and released so far for these projects during the last five years, State-wise, particularly for Maharashtra; (c) the current physical and financial progress of these Digital Highway projects; and (d) the timelines fixed by the Government for the completion of these projects and the steps being taken to ensure their timely implementation?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExpansion of Gorakhpur Airport
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1050 · Asked on 2026-02-05
Ministry: CIVIL AVIATION
Member asked
(a) the details of the number of domestic flights operated, passenger movement and cargo handled at Gorakhpur Airport during the last three years, year-wise; (b) whether any project has been approved or proposed for the expansion/modernisation including terminal capacity, runway, apron, night landing, Instrument Landing System, etc., at Gorakhpur Airport and if so, the details thereof including cost and the timeline fixed for the said project; (c) whether any discussions/proposals are under consideration with airlines to introduce new domestic or inter-State flights from Gorakhpur, particularly to Delhi, Mumbai, Bengaluru, Kolkata, Ahmedabad and if so, the details thereof; and (d) whether complaints regarding flight delays, cancellations and excessive fare increases have been received in respect of Gorakhpur Airport and if so, the details thereof along with the steps taken to safeguard passenger convenience and protection?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSafety Incidents in ONGC Fields in Assam
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1051 · Asked on 2026-02-05
Ministry: PETROLEUM AND NATURAL GAS
Member asked
We have not ingested the asking members for this question.
(a) the complete details of the number of gas leakages, uncontrolled well blow-outs fires and other industrial accidents that occurred during the last five years in the oil and gas fields operated by Oil and Natural Gas Corporation Limited (ONGC) in the State of Assam; (b) whether mandatory safety audits were conducted at the concerned installations prior to these incidents and if so, the details of action taken against the officials and contractors found responsible for the said incidents; (c) the details of compensation likely to be paid to the affected farmers, workers and local residents, incident-wise and district-wise; and (d) whether any concrete action plan has been prepared for the modernisation of ageing and obsolete infrastructure of ONGC in Assam to prevent recurrence of such incidents in future, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment of MSMEs Sector in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1052 · Asked on 2026-02-05
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
Arvind Sawant, Sanjay Deshmukh
(a) the details of the current schemes and programmes being implemented by the Government to support Micro, Small and Medium Enterprises (MSMEs) in the Maharashtra including Washim-Yavatmal Lok Sabha Constituency; (b) the objectives, scope and targeted beneficiaries of these schemes; (c) the major initiatives currently under implementation for the development, competitiveness, technology upgradation and innovation in the MSME sector; (d) the total amount of funds disbursed to MSMEs and utilised in Maharashtra including Washim-Yavatmal Lok Sabha Constituency under concessional credit schemes during the last three years and the current year, year-wise; (e) whether any new proposals or schemes for providing additional support to the MSME Sector in Maharashtra, particularly for cluster development are under consideration; and (f) if so, the details thereof and the likely timeline for their implementation?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAtal Bhujal Yojana in Water-Stressed Areas
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1053 · Asked on 2026-02-05
Ministry: JAL SHAKTI
Member asked
(a) the current status of groundwater levels in the over-exploited blocks of Ghaziabad; (b) the details of enforcement of guidelines for groundwater extraction by industries and high-rise societies; (c) the status of implementation of the Atal Bhujal Yojana in the water-stressed areas of the said district; (d) the measures taken to promote artificial recharge structures and rainwater harvesting in urban and rural areas; and (e) the Government’s plan to supply surface water (Ganga water) to reduce dependence on groundwater?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Metro Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1054 · Asked on 2026-02-05
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the details regarding the status of metro rail projects across the country including those proposed, under construction and presently operational, project and State-wise, particularly for Andhra Pradesh; (b) the details of the funds allocated, sanctioned, released and utilised for construction, maintenance and upgradation of metro rail projects across the country during the last five years, project and State-wise, particularly in Andhra Pradesh; (c) the details regarding the annual passenger footfall and revenue generated by each operational metro rail projects in the country during the last five years; (d) whether any timelines have been fixed for completion of pending metro rail projects, especially those delayed by more than five years; and (e) if so, the details of the expected dates of completion and the measures undertaken by the Government to expedite execution and ensure timely completion, project-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCGTMSE in MSMEs
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1055 · Asked on 2026-02-05
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the details of credit guarantees approved under Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE) including the enhanced coverage ceiling and special provisions for various categories during the year 2025; (b) the progress under the Mutual Credit Guarantee Scheme for manufacturing MSMEs announced in January 2025; (c) the cumulative loans sanctioned under PM MUDRA Yojana since its inception and its achievement; and (d) the steps being taken to enhance collateral-free credit access for micro and small enterprises?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceResearch Outputs of National River Research Centre
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1056 · Asked on 2026-02-05
Ministry: JAL SHAKTI
Member asked
(a) whether the Government has laid down a clear roadmap for translating the research outputs of the National River Research Centre (NRRC) into policy interventions and on-ground river rejuvenation programmes across the country and if so, the details thereof; (b) the immediate research priorities identified for the NRRC during its initial phase including studies relating to river health assessment, freshwater biodiversity, pollution abatement, sediment management and impacts of climate change; (c) whether the Union Government would function in coordination with the State Governments, river basin authorities, academic institutions and local communities and if so, the details of the mechanism proposed for such coordination; and (d) the timelines envisaged by the Government to deliver actionable recommendations and the manner in which these would be monitored and reviewed by the Government?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceTribal Status for Jhodia Community and Recognition of Soura Language
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1057 · Asked on 2026-02-05
Ministry: TRIBAL AFFAIRS
Member asked
(a) whether the Government has examined the long-pending demand for inclusion of the Jhodia community of Odisha, a tribal group from the Koraput–Rayagada–Nabarangpur region, in the Scheduled Tribes list and if so, the present status of the proposal submitted by the State Government and the Registrar General of India; (b) the details of ethnographic, linguistic and anthropological studies relied upon by the Government in determining the tribal status of the Jhodia community and the reasons for the continued delay in their constitutional recognition; (c) whether the Government has examined the proposal for inclusion of the Soura (Sora) language, spoken by lakhs of tribal people in Odisha, Andhra Pradesh and Telangana, in the Eighth Schedule of the Constitution and if so, the present status thereof; and (d) whether the Government proposes to take a time-bound decision on both, the Jhodia Scheduled Tribe status and Soura language recognition to safeguard the identity, culture and constitutional rights of these tribal communities, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCommunity Forest Resource Management Committees
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1058 · Asked on 2026-02-05
Ministry: TRIBAL AFFAIRS
Member asked
(a) whether discussions are underway with the Ministry of Environment, Forest and Climate Change to provide funding support for Community Forest Resource Management Committees (CFRMCs) constituted under the Forest Rights Act, 2006, if so, the current status and timeline for finalising such financial arrangements and the amounts proposed; (b) the criteria/norms being considered for allocating funds to CFRMCs; (c) the details of the safeguards to ensure that the funds are used for forest conservation, sustainable resource use and community livelihoods; and (d) the steps taken by the Government to strengthen Gram Sabhas and CFRMCs in areas where Community Forest Resource Rights have been recognised but implementation remains weak?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRegulation of Private Bus Operators
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1059 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
a) the total number of road accidents involving private bus operators reported during the last five years, State-wise and district-wise in Andhra Pradesh; (b) the existing regulatory framework governing private bus travel services, including permit conditions, safety standards, driver qualifications and vehicle fitness norms; (c) the steps taken by the Government to strengthen monitoring, surveillance and compliance of safety norms by private bus operators in the light of the increasing accidents; (d) whether the Government proposes to introduce mandatory safety technologies such as GPS tracking, driver alert systems, speed governors, real-time monitoring or emergency response integration for private buses; (e) if so, the details thereof, if not, the reasons therefor; and (f) the number of penalties imposed, licences suspended and cases registered against private bus operators for non-compliance with safety regulations during the last five years, State-wise and district-wise in Andhra Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRoad Accidents and Safety Measures on NHs in Kerala
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1060 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether the Government has any data on road accidents on National Highways (NHs) in the country during the last five years and if so, the details thereof, State-wise, including Kerala; (b) whether the Government has carried out any audits or studies to ascertain the causes of repeated accidents and if so, the details and findings of such reports; (c) the status of safety measures implemented on NH stretches in Kerala, particularly on stretches where construction is ongoing; (d) whether the Government proposes to bring Road Safety Bill, 2026 and if so, the details thereof; and (e) whether the Bill addresses Kerala’s specific concerns regarding recurring road accidents?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRestoration of Water Bodies under AMRUT
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1061 · Asked on 2026-02-05
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware of encroachment, pollution and loss of public space at Lokpal Sagar Talab in Panna town and if so, the details thereof; (b) whether the waterbody has been mapped, notified and considered under the AMRUT/urban waterbody rejuvenation guidelines for conservation and restoration and if so, the details thereof; (c) whether any Detailed Project Report (DPR), proposal or fund sanction for desilting, anti-encroachment works and lake-edge protection has been received from the State/Urban Local Body and if so, the present status thereof; (d) if not, the administrative or procedural reasons therefor and the remedial measures being taken for urgent conservation; and (e) the details of the timeline fixed and funding modality for restoring the lake, securing drinking-water quality and reclaiming the adjacent community space?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUDAN Scheme for Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1062 · Asked on 2026-02-05
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government is aware that the Regional Connectivity Scheme - Ude Desh Ka Aam Nagrik (RCS-UDAN) has facilitated over 3.23 lakh flights and carried more than 1.56 crore passengers during the last nine years since its launch thereby enhancing air-accessibility in Tier-2/3 and remote regions and if so, the details thereof; (b) the number of routes and airports added under the said scheme during 2024-25 and 2025-26 in Maharashtra, particularly in tribal or backward districts including Nandurbar that previously lacked air-connectivity; (c) whether special incentives or concessional Viability-Gap Funding (VGF) is offered for airports/air-strips and if so, the details thereof; (d) the mechanism in place to monitor utilisation, service sustainability and whether remote airports meet performance benchmarks and if so, the details thereof; and (e) the expected timeline fixed for full operationalisation of UDAN routes in all districts of Maharashtra and the time by which a district-wise status report for airports would be published?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Mahanadi Water Dispute and Tribunal Proceedings
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1063 · Asked on 2026-02-05
Ministry: JAL SHAKTI
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware that construction of upstream barrages by Chhattisgarh has reduced the flow of water in the Mahanadi River adversely affecting irrigation, drinking water and livelihoods in Odisha and if so, the details thereof; (b) whether the Mahanadi Water Disputes Tribunal (MWDT) was constituted in 2018 under the Inter-State River Water Disputes Act, 1956 and if so, the details thereof along with the present status of its proceedings; (c) whether the Tribunal has submitted any interim or final report, recommendations or conclusions regarding equitable sharing of Mahanadi waters between Odisha and Chhattisgarh, if so, the details thereof and if not, the reasons therefor; and (d) the revised timeline fixed for its submission and the steps taken by the Union Government to facilitate an amicable resolution between the two States?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.