Lalitpur-Singrauli Rail Project
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4349 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) the details of the amount allocated for Lalitpur Singrauli rail line during the financial year 2026-27; (b) the current status of acquisition of the remaining land falling along the route of this project and the approval from the forest department; (c) whether the process of providing adequate compensation and employment to the farmers affected by land acquisition has been completed and if so, the details thereof; and (d) the present status of the rule regarding provision of employment in lieu of land acquisition?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational Youth Parliament Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4350 · Asked on 2026-03-18
Ministry: PARLIAMENTARY AFFAIRS
Member asked
(a) the details and the objectives of the National Youth Parliament Competition; (b) the manner in which the National Youth Parliament Scheme (NYPS 2.0) is different; (c) whether there is a provision for individual participation therein; (d) if so, the details thereof; and (e) the details of financial assistance for states without Legislature?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePost Office Passport Service Centers
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4351 · Asked on 2026-03-18
Ministry: COMMUNICATIONS
Member asked
(a) the progress made so far under the scheme to open post office passport service centers in all Lok Sabha Constituencies along with the circle-wise number of centers currently operational; (b) the total number of passport applications processed during the last three years along with the details of new services launched; (c) whether the Government has made any assessment of the impact of this on the accessibility of passport services and if so, the details of the conclusions thereof; (d) whether a post office passport service center has been established or proposed in Meerut Lok Sabha Constituency; and (e) if so, the current status, number of applications processed along with the details of service coverage thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNFSA
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4352 · Asked on 2026-03-18
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) the details of the number of eligible families excluded from the Ration Card list under the National Food Security Act (NFSA) in Tonk-Sawai Madhopur district under the Tonk-Sawai Madhopur Lok Sabha Constituency in Rajasthan along with the reasons for exclusion thereof and the action taken in this regard; (b) the allocations made, actual distributions done and cases of shortages observed in wheat, rice and other foodgrains allocated under the NFSA in the said Lok Sabha Constituency during the last three years, district-wise; (c) whether the Government proposes to launch any special drive in the Tonk-Sawai Madhopur Lok Sabha Constituency by investigating complaints of fake ration cards, receiving foodgrains on behalf of persons deceased/migrated out and eligible families being denied ration due to technical errors in e-KYC and Aadhaar seeding; and (d) if so, the timeline thereof including the details of the agencies responsible therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePunjabi-language Newspapers on Premium Trains Serving Punjab Region
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4353 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) whether the Government is aware of reports that Punjabi language newspapers are not consistently available on board Vande Bharat, Shatabdi and other premium trains starting from, passing through/terminating in Punjab, Chandigarh, Himachal Pradesh, Haryana and Delhi despite the sizeable Punjabi‑speaking population in these regions and if so, the details thereof; (b) the policy/guidelines of Railways/IRCTC regarding distribution of regional language newspapers on long‑distance and premium trains; (c) the reasons for the lack of Punjabi newspapers where available newspapers are predominantly Hindi/English and steps taken/being taken to ensure multilingual newspaper supply reflective of passenger demographics; and (d) whether the Government proposes to issue standardised instructions to ensure equitable distribution of regional language newspapers on such services and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Crossings on National Highways
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4354 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) the details of railway crossings on National Highways in the country, State/UT and district-wise; (b) the details of unmanned and manned railway crossings on National Highways in the country particularly in Gujarat; and (c) the time by which unmanned railway crossings are likely to be converted into manned railway crossings?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceComplaints Received by National Commission for Minorities
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4355 · Asked on 2026-03-18
Ministry: MINORITY AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) the details of the number of complaints received and disposed of by the National Commission for Minorities during the last five years; (b) the details of the total Number of prolonged vacancy of all statutory posts in the National Commission for Minorities along with the reasons therefor; (c) the impact of this institutional vacuum that has had on the disposal of discrimination complaints; and (d) the timeline by which the Commission is likely to be reconstituted?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAkashwani Kargil Station
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4356 · Asked on 2026-03-18
Ministry: INFORMATION AND BROADCASTING
Member asked
(a) whether the Government is aware of the fact that the Akashwani Kargil station, which used to function as an independent and full-fledged station, due to a recent administrative change, even lacks a dedicated Drawing and Disbursing Officer (DDO), leading to delays in payments and other administrative hardships and is currently functioning under the Leh cluster head which has severely hampered the dissemination of localized content; (b) if so, the details of steps being taken by the Government to re-establish a separate Cluster Head for Akashwani Kargil, appoint a DDO, strengthen local language programming and upgrade transmission infrastructure to improve coverage in remote areas; (c) if not, the reasons therefor; and (d) the steps taken/proposed to be taken by the Government to enhance the production of content in local languages and to create content that reflects the socio-cultural identity of the region?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Projects in Maharashtra and Madhya Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4357 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) whether several railway projects are pending in Maharashtra and Madhya Pradesh; (b) if so, the details thereof including such railway projects where work is yet to be commenced and those pending for completion including their current status and timeline fixed for their completion; (c) the details of the budgetary provisions made in respect of railway projects which have formally sanctioned but are yet to be started and those projects which are currently ongoing; and (d) the project and year-wise details of the actual expenditure incurred on these projects?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDraft Indian Statistical Institute Bill, 2025
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4358 · Asked on 2026-03-18
Ministry: STATISTICS AND PROGRAMME IMPLEMENTATION
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware that the Draft Indian Statistical Institute Bill, 2025, circulated for public comments in 2024–25, has raised serious concerns among Members of Parliament, faculty associations alumni and statistical experts regarding the repeal of the ISI Act, 1959 and if so, the details thereof; (b) the rationale for proposing major changes in governance, composition of the Council, and administrative control of an Institution of National Importance without prior consultation with ISI’s statutory bodies, academic staff and stakeholders; (c) whether the Government has assessed the potential impact of the draft provisions on ISI’s academic autonomy, research independence and public-interest mandate in national data systems and if so, the details thereof; and (d) whether the Government proposes to review, amend or withdraw the Draft Bill and undertake wider, transparent consultations before introducing any revised legislation in Parliament and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCSIR Laboratories
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4359 · Asked on 2026-03-18
Ministry: SCIENCE AND TECHNOLOGY
Member asked
(a) the details of the places where the CSIR labs are established at present in the country; (b) whether there is still not a single CSIR laboratory in Bihar, despite being the third largest State in the country; (c) whether the Government proposes to establish a CSIR lab in Bihar to ensure the future of young students of the State and to prevent students' migration; and (d) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Reservation Facility for Lakshadweep
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4360 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware that the facility of reservation of railway tickets for residents of the Union Territory of Lakshadweep has been discontinued and if so, the details thereof and if not, the reasons therefor; (b) whether the Government has any proposal to reinstate the reservation of railway tickets for the residents of Lakshadweep and if so, the details thereof; (c) the details of the expected timeline for restoration of this facility; and (d) the details of the steps being taken to ensure that residents of Lakshadweep have fair and affordable access to railway services connecting them to the mainland?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInstallation of Mobile Towers in Tribal-dominated Don Region
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4361 · Asked on 2026-03-18
Ministry: COMMUNICATIONS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware that about 15,000 to 20,000 people reside in two panchayats of the Don region inside the Valmiki Tiger Reserve (VTR) area in the Lok Sabha Constituency of the Member; (b) whether the Government proposes to install adequate mobile towers to provide mobile network connectivity to the people of the tribal-dominated Don region residing inside the Valmiki Tiger Reserve; and (c) whether the Government proposes to provide 5G network facility to the consumers in the areas where mobile towers have already been installed, so as to facilitate online education and learning through platforms like YouTube for the children in this remote and inaccessible area?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNew Railway Line from Purulia to Jhargram
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4362 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) whether the funds were allocated for survey of the Purulia-Manbazar-Jhargram new railway line few months ago and its utilisation has begun and if so, the details thereof including status of the said survey and progress so far; (b) whether the said railway line is likely to directly benefit connectivity, education, health services, employment, trade and tourism in tribal and backward areas and if so, the details thereof; (c) whether the Government proposes to complete the processes of Detailed Project Report (DPR), land acquisition, environmental clearance and financial approval for the said project in a time bound manner after the completion of said survey; and (d) if so, the details of the time likely to be taken in the said procedures?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceVaishali Superfast Train (12553/12554)
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4363 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) whether the superfast status of some trains in the country has been withdrawn and if so, the details thereof; (b) whether Vaishali Superfast Train No.12553/12554 has been awarded the new status of therefrom superfast train and if so, the reasons therefor along with the impact of the same on passenger; (c) whether the Government proposes to accord the status of superfast train again to the said train and if not, the reasons therefor; (d) whether densely populated areas like Sikandarpur lack adequate railway facilities even after lapse of so many years of independence; and (e) the status of stoppage of Kashi Express, Godan Express, Maurya Express, Ahmedabad – Gorakhpur Express (Train No.19489/19490) and Mumbai Ltt Azamgarh Sf Express (Train No.20103/20104) at Kiriharapur, Belthara road and Bankata stations?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceJan Poshan Kendra and Jana Aushadhi Prakalp
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4364 · Asked on 2026-03-18
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether any measures are being contemplated to include Schemes like Jan Poshan Kendra, Jana Aushadhi Prakalp etc. with the Fair Price Shop Dealers so as to make their business viable and income sustainable; (b) if so, the details thereof; (c) whether the Government has taken any initiative to sell rice and wheat under the Open Market Sale Scheme (Domestic) to help the general public to buy a Government specified rates through Fair Price shops; and (d) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNew Railway Lines in Chittorgarh/Pratapgarh/Udaipur
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4365 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) whether any survey work has been completed or any proposals are currently under consideration for approval for laying of new railway lines in Chittorgarh, Pratapgarh and Udaipur districts of Rajasthan and if so, the details thereof; (b) the project-wise details of the estimated cost of the ongoing railway projects (new line, doubling) in the said districts and the amount spent so far including the progress/status thereof; (c) the status of administrative/financial approval of new railway lines and doubling projects after completion of their survey; (d) whether the Government is working on any special priority scheme to strengthen rail connectivity in the said districts and if so, the details thereof; and (e) the likely impact of the said projects on regional economic development, tourism, industrial activities and employment generation after completion?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMalegaon/Satana/Sakri/Chinchpada Railway Line
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4366 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) the present status of the proposed Malegaon-Satana-Sakri-Chinchpada railway line and whether the project remains sanctioned, under survey or pending reconsideration and if so, the details thereof; (b) the details of the reasons for delay or stagnation including land acquisition challenges, financial constraints, environmental clearances or changes in traffic projections; (c) the details of the revised cost estimates, if any, and budgetary provisions made during the last three years; (d) the details of the steps taken by the Government to review and revive long-pending railway projects in country to prevent cost escalation and public inconvenience particularly in Maharashtra; and (e) the details of the proposed timelines for decision-making, resumption of work and completion of such projects once bottlenecks are resolved?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStudies for Climate Change
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4367 · Asked on 2026-03-18
Ministry: EARTH SCIENCES
Member asked
(a) the details of the number of programmes being run at the national level to conduct studies related to climate change particularly in Uttarakhand along with the time since when the said programmes have been operational; (b) the details of the funds being spent annually on the said programmes, State-wise; and (c) whether the programmes orgainised for the study of climate change during the last three years have helped in preventing accidents/adverse effects caused by climate change and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePassenger Amenities at Etawah and Fatehpur Railway Stations
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4368 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
Naresh Uttam Patel, Jitendra Kumar Dohare
(a) the present status of the facilities provided/being provided to the passengers at railway stations in the country particularly in Uttar Pradesh; (b) the details of the passenger amenities available at the railway stations in Etawah and Fatehpur districts; (c) the steps taken/being taken by the Government for the upgradation and expansion of basic amenities like-waiting rooms, drinking water, sanitation, lighting and Information Technology-based services; (d) the details of the action taken so far in the said districts; (e) whether accident-prevention systems, maintenance of tracks security arrangements at the stations and onboard trains have been strengthened in view of the passengers' safety; and (f) if so, the details thereof particularly in Etawah and Fatehpur districts?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of PDS and Food Security Schemes
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4369 · Asked on 2026-03-18
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether the Government is aware that in several rural, tribal and economically backward areas, beneficiaries under the Public Distribution System (PDS) are facing irregular supply of essential commodities such as rice, wheat, pulses and sugar along with issues of poor quality and corruption in fair price shops; (b) whether the Government has conducted any recent assessments or audits regarding leakages, diversion of foodgrains, biometric authentication failures and exclusion errors in ration distribution and if so, the details thereof; and (c) the details of the concrete steps being taken by the Government to strengthen transparency, ensure doorstep delivery, improve grievance redressal mechanisms, modernize storage and transportation infrastructure and guarantee timely, adequate and quality food supply to all eligible beneficiaries under the National Food Security framework?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNetwork Coverage in Rural Areas
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4370 · Asked on 2026-03-18
Ministry: COMMUNICATIONS
Member asked
We have not ingested the asking members for this question.
(a) whether any survey has been conducted by the Government to identify rural areas with no network coverage; (b) if so, whether the Panchayats are included in the said survey; (c) the timeline by which mobile towers and internet facilities are likely to be provided in the said rural areas to ensure digital access to education, health, banking, emergency services and Government schemes; (d) whether any time-bound plan and budgetary provision have been made for the said purpose; and (e) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRelease of Central Share of the Centrally Sponsored Schemes
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 341 · Asked on 2026-03-17
Ministry: RURAL DEVELOPMENT
Member asked
(a) whether the Government has initiated action to strengthen the decentralized planning through Local Self Government (LSG) and Panchayat, if so, the details thereof; (b) whether the Government has ensured the timely release of central share of the Centrally Sponsored Schemes to the local self-Government, if so, the details of action taken thereon; (c) whether the Government has analysed the adverse impact of addiction of liquor/mobile phones and drugs in the development of rural areas, if so, the details thereof; (d) whether the Union Government has initiated action to resolve the limited developable land considering the high population density, if so, the details thereof; and (e) whether the Government has initiated action to prevent the human-wild animal conflicts in rural areas, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAlternative Crops and Livelihoods for Tobacco Farmers
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 342 · Asked on 2026-03-17
Ministry: AGRICULTURE AND FARMERS WELFARE
Member asked
(a) whether the Government has formulated any developmental or transition plans to promote alternative crops and livelihoods for tobacco farmers, if so, the details thereof; (b) the details of the budgetary allocations to States during the last five years for supporting crop diversification away from tobacco cultivation in the country, State-wise including Karnataka; (c) the area of land shifted from tobacco cultivation to alternative crops during the last five years in the country specifically in Karnataka, including Mysuru district where tobacco farming is traditionally prevalent; (d) the major alternative crops and value chains promoted under these programmes such as millets, oilseeds, horticulture or allied activities and the extent of farmer participation therein; and (e) whether the Government proposes region-specific support measures for tobacco-growing districts like Mysuru especially in market linkages, price assurance or processing infrastructure to ensure a sustainable income transition for affected farmers, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCrop Loss Relief under PMFBY
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 343 · Asked on 2026-03-17
Ministry: AGRICULTURE AND FARMERS WELFARE
Member asked
(a) the details of the compensation paid against the loss of crop to farmers under the Pradhan Mantri Fasal Bima Yojana (PMFBY) and State Disaster Response Fund (SDRF) during the last three years, State-wise and district-wise including Rajasthan and Dausa Lok Sabha Constituency of Rajasthan; (b) the details and number of insurance claims received, the number of claims accepted and the total compensation paid in Rajasthan, particularly in the Dausa region during the said period, year-wise; (c) whether the Government has taken cognizance of cases regarding delays in the settlement of claims under the PMFBY; (d) if so, the reasons for the said delays in the settlement and the steps taken for the resolution thereof; and (e) whether satellite imagery, drone surveys, and mobile app-based assessment systems are being used in Rajasthan to make the claim process transparent and time-bound?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source