Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 6,451–6,475 / 34,220
Underpasses at Palam and Shahbad Railway Crossings
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4324 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) whether the work for construction of underpasses has begun at Palam Railway Crossing and Shahbad Railway Crossing under the Delhi-Rewari section; (b) if so, the time by which the said construction work is likely to be completed; and (c) the average time taken by the Government to construct an underpass there?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUpgradation of Silchar–Guwahati Trains from ICF to LHB Coaches
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4325 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) whether the Government is aware that Train No. 15616 operating on the Silchar–Guwahati route in Cachar district, Assam is still running with outdated Integral Coach Factory (ICF) coaches and if so, the details thereof; (b) whether any proposal exists for conversion of this service to Linke Hofmann Busch (LHB) coaches/rakes with dedicated power cars and if so, the details thereof; and (c) the timeline fixed for such upgradation in view of passenger safety and comfort?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational Monetization Pipeline
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4326 · Asked on 2026-03-18
Ministry: PLANNING
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has monetised/sold assets of around 6 lakh crores during 2021-22 to 2024-25 under National Monetisation Pipeline (NMP)-1.0; (b) if so, the details thereof along with the details of assets monetised under NMP-1.0, year-wise; (c) whether the Government has announced NMP 2.0 for monetisation/sale of Government assets worth Rs. 16.72 lakh crores between 2025 to 2030; (d) if so, the details thereof, year-wise and asset-wise; and (e) the reasons for such massive monetisation/sale of Government assets?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDemand for Railway Connectivity in Shravasti District, Uttar Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4327 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
whether any work is being done to introduce new train services, increase stoppages, improve train frequency on the Balrampur, Tulsipur, Gasdi (Gainsari) Gonda-Shravasti railway lines and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFood Security and Pradhan Mantri Garib Kalyan Anna Yojana
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4328 · Asked on 2026-03-18
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
Rajkumar Chahar, Gopal Jee Thakur, Smita Wagh, Balabhadra Majhi, Tejasvi Surya, Bhartruhari Mahtab, Raghunandan Rao, Rajesh Mishra, Sukanta Kumar Panigrahi
(a) whether the Government has finalised the financial and expenditure roadmap for extending the Pradhan Mantri Garib Kalyan Anna Yojana (PMGKAY) till the year 2029 and if so, the details thereof, State and district-wise; (b) the details of allocation of foodgrains and estimated beneficiaries particularly for Maharashtra and Jalgaon district; (c) the concrete steps being taken by the Government to ensure universal coverage by bridging the gap between the 81.35 crore approved beneficiaries and the presently identified 80.6 core persons in the country especially in Nabarangpur and tribal regions of Odisha and districts of Bharatpur Lok Sabha Constituency; (d) the specific measures being taken to update the beneficiary list in the absence of decennial census in line with recent judicial observations and including the role of States in identification in the country, Odisha and Madhya Pradesh; (e) whether the Government has completed the process of cent per cent Aadhaar seeding and e-KYC for all active ration cards across the country by the deadline of February, 2026; (f) if so, the details thereof including status especially in Maharashtra, Nabarangpur and tribal areas of Odisha, Sidhi Lok Sabha Constituency and Dewas-Shajapur district of Madhya Pradesh; and (g) the details of corrective steps taken where targets are pending?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOptical Fibre Network with Kavach System
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4329 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
Dhairyasheel Mane, Hemant Savara, Jagdambika Pal, Anup Dhotre, Alok Sharma, Satish Kumar Gautam, Vijay Kumar Dubey
(a) the present status of implementation of Kavach 4.0 system and whether the target of covering 1300 route kilometers has been achieved; (b) the manner in which the Government is planning to utilise Rs.1.2 lakh crore security budget to expeditiously deploy Automatic Train Protection system on high-density rail corridors particularly in Kota division under West-Central Railway; (c) whether the AI-enabled intrusion detection system used in wildlife corridors is being expanded to cover all sensitive ecological zones across the network and if so, the details thereof; and (d) the reasons behind integrating the optical fiber networks with the Kavach system including the manner in which the said integration strengthens real-time communication in remote areas including Palghar district in Maharashtra?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceData Protection under Digital India Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4330 · Asked on 2026-03-18
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) whether the Government has assessed the current status of digital services, cyber security and data protection in the country; (b) if so, the key findings thereof; (c) whether the Government proposes to bring any new policy/law to ensure data protection under Digital India Programme; and (d) if so, the steps taken by the Government so far in this regard?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBG Line between Swamihalli to Rayadurga (Andhra Pradesh)
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4331 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) the details of the current status of the Final Location Survey (FLS) report of the Broad Gauge (BG) Line between Swamihalli (Ballari District, Sandur Taluk, Karnataka) and Rayadurga (Andhra Pradesh) via junction and Obalapuram Railway Station (Andhra Pradesh); (b) the details of the timeline for the completion of the Final Location Survey report/DPR of said line including commencement of effective and meaningful work on the project; and (c) the details of the estimated cost of the project including the allocation of funds during the current financial year?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUjjain-Jhalawar Railway Line
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4332 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) whether the construction for the Ujjain-Jhalawar railway Line has not yet begun despite the completion of the survey and if so, the reasons for the delay; (b) whether the Government has made any special plans or prioritised the speedy construction of the said railwayline keeping in mind the upcoming Simhastha festival and if so, the details thereof; (c) whether there are any hindrances to land acquisition, environmental clearance or budget allocation for the said project and if so, the details thereof including the steps taken by the Government to address them; and (d) whether the Government proposes a revised action plan/phased construction/special budget provisions to expedite the implementation of the said project and if so, the details and timeline thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceLonavla-Pune-Daund Railway Corridor Fencing Work
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4333 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) whether the Government has undertaken fencing works along trespassing-prone sections of the Lonavla–Pune–Daund railway corridor under jurisdiction of the Central Railway and if so, the details thereof; (b) the total length (in kilometers) identified for fencing in the said corridor, the cost per kilometer of fencing approved and total project cost sanctioned; (c) whether there has been any increase in the estimated project cost due to delay in execution and if so, the revised cost, reasons for delay and the agency responsible for same; (d) whether any safety audit has been conducted for trespassing-prone sections of the said corridor during the last three years and if so, the findings thereof; and (e) the details of the steps taken/proposed to be taken by the Government to fix accountability for delay and cost escalation, announce a time-bound completion schedule for fencing work and provide interim safety measures such as foot overbridges, subways/other protective infrastructure until the fencing work is completed?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWomen Participation in Mining
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4334 · Asked on 2026-03-18
Ministry: MINES
Member asked
(a) whether the Government maintains data on women miners employed in major and minor mineral sectors across the country and if so, the total number of registered women miners during the last five years, State/UT-wise, if not, the reasons therefor; (b) whether the Government has assessed the working conditions, wage parity, safety standards and access to social security benefits for women miners, specifically in Singareni Collieries Company Limited and if so, details thereof; and (c) the details of steps being taken by the Government to increase women’s participation in mining while ensuring dignified employment, safe workplaces and equal opportunities?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePrice Stability of Essential Commodities
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4335 · Asked on 2026-03-18
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether essential commodities continue to witness volatile price rises and what structural measures beyond ad hoc export bans are being implemented; (b) whether the Government has not expanded National Food Security Act coverage in line with updated population data, potentially excluding eligible beneficiaries; and (c) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDeployment of Kavach System in South Western Railway Zone
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4336 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) the progress made in the phased implementation of the indigenously developed Kavach (Automatic Train Protection) system across the 3,692 route kilometers of the South Western Railway (SWR) zone; (b) the route (in kilometers) covered so far under the Kavach system and the corridors identified for implementation during the current and next phases; (c) the timelines fixed for completion of Kavach deployment across the entire SWR zone including key routes in Karnataka; and (d) the steps taken/being taken by the Government to prioritise high-density passenger and freight corridors to enhance railway safety under the Kavach programme?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Accidents in the Country
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4337 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) the location-wise details of the railway accidents occurred during the last five years in the country including the details of main causes thereof along with the number of casualties; (b) whether the lack of track maintenance, signalling system failure and vacant posts are among the main causes of the said accidents and operational problems; (c) if so, the concrete steps taken/being taken by the Government to remove the said shortcomings and the budget allocated for the said purpose during last five years; and (d) whether the Government proposes to implement a time-bound action plan to improve railway safety and passenger amenities and if so, the details thereof along with the time line of the said action plan?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProcurement of Grains
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4338 · Asked on 2026-03-18
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether the Government is aware that private traders are lifting grains in Punjab at record levels during the current procurement season; (b) if so, the details thereof including the total quantity of rice purchased by private traders compared to Government agencies; (c) the reasons for the increased procurement by private traders particularly in relation to higher purchase prices and delayed Government procurement and transportation issues; (d) whether incidents of traders buying grains from outside Punjab have been selling grains to procurement agencies in Punjab; (e) if so, the details thereof including action taken by the Government in this regard; and (f) the details of steps being taken by the Government to address the challenge faced by farmers due to these developments and to ensure smooth procurement operations in the said State?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceABSS for Duvvada Railway Station, Vishakhapatnam
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4339 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
(a) whether development works at Duvvada Railway station in Vishakhapatnam taken up under Amrit Bharat Station Scheme (ABSS) have been completed, if so, the details thereof; (b) if not, the estimated time by when the above works are going to be completed; (c) whether it is true that there are demands for including Pendurthi station under the said Scheme; and (d) if so, the details thereof and the steps taken/being taken to include above station under ABSS?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePost Offices and Service Centres in Ambedkar Nagar
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4340 · Asked on 2026-03-18
Ministry: COMMUNICATIONS
Member asked
(a) the total number of post offices and service centres of the Postal Department currently operational in Ambedkar Nagar district; (b) the current status of mobile communication and internet facilities in rural development blocks of the district such as Bhiti, Jalalpur, Tanda and Akbarpur; (c) whether Ambedkar Nagar district has been included in the second phase of the BharatNet project or the fifth-generation telecommunications service expansion plan and if so, the details thereof; and (d) the the number of complaints received regarding poor quality of telecommunications services or delays in postal delivery during the last two years along with the action taken for redressal thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePolicies Formulated Relating to Science and Technology
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4341 · Asked on 2026-03-18
Ministry: SCIENCE AND TECHNOLOGY
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has any policies formulated relating to Science and Technology during the past three years; (b) if so, the details thereof; (c) whether the Government has identified any new area of development with regard to Science and Technology; and (d) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAspirational Districts in Bihar
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4342 · Asked on 2026-03-18
Ministry: PLANNING
Member asked
(a) whether the number of aspirational districts in Bihar at present is only thirteen; (b) if so, the basis on which the said thirteen districts were selected as aspirational districts and the remaining twenty five districts were left out; and (c) the details of the criteria adopted for selecting all the aspirational districts of Bihar?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRegional Imbalances
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4343 · Asked on 2026-03-18
Ministry: PLANNING
Member asked
We have not ingested the asking members for this question.
(a) whether the Government proposes to address regional imbalances through infrastructure development in the eastern and backward districts of the country; (b) if so, whether any proposal for approval of road, rail, logistics hub, industrial corridor or other Central projects is under consideration of the Government particularly in Chandauli district of Uttar Pradesh; and (c) if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRegularization of Casual Announcers and Presenters in All India Radio
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4344 · Asked on 2026-03-18
Ministry: INFORMATION AND BROADCASTING
Member asked
(a) whether it is a fact that a permanent policy has been formulated by Prasar Bharati for the regularisation of casual announcers and presenters working for years and various All India Radio (Akashvani) centers across the country as submitted before the Hon'ble Supreme Court on 30th October, 2025; (b) if so, the details of number of persons regularised under the said policy so far along with the timeline within which the remaining personnel likely to be regularised; (c) whether it is also a fact that no significant increase has been made in the honorarium of these casual announcers and presenters for a long time; (d) if so, the reasons therefor and the time by which the hike in honorarium is likely to be implemented; (e) whether the budget for programme based on local languages and dialects has been reduced in various centers of Akashvani especially the Shimla center and if so, the reasons therefor; and (f) whether the Government is likely to provide additional budget for the preservation and promotion of such programme?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of the NCMM
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4345 · Asked on 2026-03-18
Ministry: MINES
Member asked
(a) whether it is a fact that the Government of India launched the National Critical Mineral Mission (NCMM) in 2025 to establish a robust framework for self-reliance in the critical mineral sector and if so, the details of the roadmap thereof; (b) the number of exploration projects along with details conducted by the Geological Survey of India (GSI) so far under the NCMM, State and district-wise; (c) the numbers and details of the exploration and acquisition of overseas mineral assets by Public Sector Undertakings and mineral processing parks established so far; and (d) the details of steps taken by the Government to secure alternative supply chains of rare earth elements to reduce dependency on imports?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProposal for Planetarium in West Bengal
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4346 · Asked on 2026-03-18
Ministry: SPACE
Member asked
(a) whether the Government proposes to establish a modern planetarium or Space Science Centre in West Bengal; (b) if so, the current status thereof along with the budget allocations and the proposed time-frame for the same; (c) if not, whether the Government proposes to launch such a project in future to promote science and space education in backward region like West Bengal, so that school students and youth can develop scientific temper and interest in space science; and (d) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImpact of DLI Scheme in Mumbai
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4347 · Asked on 2026-03-18
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
Sanjay Dina Patil, Varsha Gaikwad
(a) whether the Government is aware that India’s semiconductor chip design ecosystem is strengthening under the Design Linked Incentive (DLI) Scheme and the role envisaged for Mumbai as a financial, innovation and startup hub in this ecosystem; (b) the number of semiconductor chip design startups from Mumbai that have been approved under the DLI Scheme since its inception along with details for the Mumbai Metropolitan Region including Navi Mumbai, sector-wise; (c) the financial assistance, access to EDA tools, IP cores and technical support extended to Mumbai-based startups under the said Scheme; (d) whether the Government has assessed the impact of the DLI Scheme in Mumbai on investor confidence, skilled employment generation and commercialisation of chip designs; and (e) the additional steps proposed to strengthen Mumbai’s semiconductor design ecosystem through linkages with universities, incubators, global firms and venture capital networks?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Recruitment and Vacancies
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4348 · Asked on 2026-03-18
Ministry: RAILWAYS
Member asked
Ajay Kumar Mandal, Giridhari Yadav, Dinesh Chandra Yadav
(a) the number of appointments made in Railways across the country during the last five years, Year and post-wise; (b) the number of vacancies in Railways, Post-wise; (c) whether the process to fill the said vacant posts in Railways is under progress, if so, the details thereof along with expected time limit; (d) the details of vacant posts in the Railways in the last three years, year and region-wise; (e) the number of posts reserved for SC/ST out of the said vacant posts and the reasons for not filling the said posts; and (f) the total number of vacancies in safety-critical categories such as loco pilots, track maintainers and signal staff as on date, Zone-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.