Budget Allocation for Bihar
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 641 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether it is a fact that Bihar has been allocated a railway budget of more than Rs.10,000 crore for the financial year 2026–27; (b) if so, the district wise details of railway projects proposed to be undertaken from the said allocation indicating the project cost and last five years projects present stage and expected date of completion; (c) the details of the amount of the allocated funds released and utilised during the last five years along with the reasons for delay, if any, in the implementation of ongoing railway projects in the State, project-wise; and (d) the details of the measures have been taken by the Government to ensure timely execution, transparency in expenditure, independent quality monitoring and employment generation for local youth through these railway infrastructure projects?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUMEED Portal for Registration of Waqf Properties
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 642 · Asked on 2026-07-22
Ministry: MINORITY AFFAIRS
Member asked
(a) whether the registration of Waqf properties on the UMEED portal has been completed across the country; (b) if so, the details of total Waqf properties registered and those left out due to technical or other reasons, State/UT-wise; (c) whether legal ownership, protection and administrative rights of Waqf properties registered on the portal have been formally recognised; (d) if so, the details of legal framework or notifications issued in this regard; and (e) the steps taken to resolve pending/left-out registrations and ensure complete digitisation and transparency of Waqf records?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConversion of Narkatiaganj Akashvani Kendra
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 643 · Asked on 2026-07-22
Ministry: INFORMATION AND BROADCASTING
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has received any proposal to convert the Narkatiaganj Akashvani Kendra in West Champaran district of Bihar which is very small and has very low broadcasting capacity at present into a modern long range Akashvani Kendra; and (b) if so, the details thereof along with the time by which it is likely to be approved?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAspirational Blocks Programme in Bihar
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 644 · Asked on 2026-07-22
Ministry: PLANNING
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has undertaken a comprehensive review of the implementation of the Aspirational Blocks Programme in Bihar and if so, the details of such assessment; (b) the details of Key Performance Indicators achieved in health, education, agriculture and infrastructure in Bihar from the date of its commencement, Block-wise; (c) the details of the number of blocks that have failed to meet annual targets and the reasons therefor; and (d) the details of corrective measures proposed to correct regional development gaps?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCoach Display and Train Indicator System in Bihar Sharif Railway Station
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 645 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Government is aware that there is no arrangement for coach display/train indicator system at Bihar Sharif railway station, Rajgir railway station and other railway stations in Nalanda district under the Danapur Division and if so, the details thereof; (b) whether in the absence of coach display and train indicator systems, passengers particularly senior citizens, women and patients, face difficulties and sometimes they even miss their trains; (c) if so, the details thereof; and (d) the time by which the coach display and train indicator systems are likely to be provided at these stations?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWave Energy Policy
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 646 · Asked on 2026-07-22
Ministry: NEW AND RENEWABLE ENERGY
Member asked
We have not ingested the asking members for this question.
(a) whether the country has a Wave energy policy to take advantage of the nation’s coast stretching for more than 11,000 km and if so, the details thereof; (b) the details of quantum of energy generated from ocean waves in the country during the last five years, State-wise; (c) the details of the agency handling Wave energy for the nation along with the quantum of investment made in generating wave power; (d) whether the Government has any plans to conduct a survey and invest in wave power project in the Mayiladuthurai Lok Sabha Constituency, Tamil Nadu and if so, the details thereof; and (e) the details of modus operandi to request and establish a wave power agency and wave power infrastructure in Mayiladuthurai Lok Sabha Constituency?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePM Gati Shakti National Master Plan
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 647 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Government has accelerated railway modernisation under Kavach 4.0, PM Gati Shakti National Master Plan and the Union Budget 2026–27 to enhance rail safety, logistics efficiency and regional economic development and if so, the details thereof; (b) the budget estimates, funds allocated, expenditure incurred and major railway projects sanctioned in Odisha during the last three years including new lines, electrification, line doubling, station redevelopment and Gati Shakti Cargo Terminals, year-wise; (c) the status of the proposed Gopalpur–Phulbani–Rairakhol railway line including survey, DPR, cost estimates, sanction and implementation timeline; (d) whether AI-enabled signalling, Kavach 4.0, predictive maintenance and digital monitoring systems have been introduced in Odisha and if so, the details thereof; and (e) whether additional railway infrastructure and logistics projects are proposed for Odisha during 2026–27 and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWelfare of Mining affected Communities
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 648 · Asked on 2026-07-22
Ministry: MINES
Member asked
(a) the manner in which the Government is monitoring compliance with District Mineral Foundation (DMF) obligations to ensure that mining-affected communities receive the intended benefits in healthcare, education and local infrastructure; and (b) the details of the action taken by the Government to curb illegal mining and improve real-time monitoring of mineral extraction, transportation and royalty collection across the country?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUse of Domestic Coal in Thermal Power Plants
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 649 · Asked on 2026-07-22
Ministry: COAL
Member asked
(a) the strategy formulated to increase the use of domestic coal in thermal power plants based on imported coal with a view to strengthen energy security, reduce import dependence and better utilisation of indigenous coal resources; (b) the policy measures adopted in coordination with the Ministry of Power, Ministry of Railways, Coal India Limited and other agencies to ensure timely supply of quality domestic coal, strengthen coal evacuation infrastructure and facilitate necessary technical modifications for increased use of domestic coal; (c) the progress made in increasing the share of domestic coal in thermal power plants based on imported coal and reducing thermal coal imports; (d) the measures taken by the Government to improve coal washing, quality management and logistics efficiency; and (e) the long term action plan prepared to achieve self-sufficiency in thermal coal while ensuring reliable, economical and sustainable power generation?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCentral Government Schemes for Minority Communities
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 650 · Asked on 2026-07-22
Ministry: MINORITY AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) the details of Central Government schemes for the welfare, education, skill development and economic empowerment of minority communities implemented in the Union Territory of Lakshadweep; (b) the details of funds allocated, released and utilised under these minority welfare schemes in Lakshadweep during the last three years and the current year, year-wise; (c) whether the Government has reviewed the effectiveness and coverage of these schemes in Lakshadweep considering its geographical isolation, limited institutional infrastructure and off- island education and employment requirements and if so, the details thereof; and (d) whether any representations have been received from the Lakshadweep Administration, elected representatives or community organisations regarding gaps, delays or the need for enhanced support under minority welfare schemes and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNew Railway Line for Arakalagudu in Hassan District
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 651 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Government has received any proposal or representation for construction of a new railway line connecting Arakalagudu in Hassan district with the existing railway network and if so, the details thereof; (b) whether any survey, reconnaissance, feasibility study or Detailed Project Report (DPR) has been conducted or is proposed for a new railway line to Arakalagudu and if so, the details and present status thereof; (c) whether the Government proposes to consider a new railway line on the Shravanabelagola-Holenarasipura-Arakalagudu-Somwarpet-Madikeri-Mangaluru corridor to improve connectivity in the region; (d) if so, the details of the proposal, including the estimated cost, funding pattern and expected timeline for approval and implementation; and (e) if not, the reasons therefor and the criteria adopted by the Ministry for sanctioning new railway line projects in the region?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCoal Allocation under SHAKTI Policy
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 652 · Asked on 2026-07-22
Ministry: COAL
Member asked
(a) the details of total quantity of coal offered and actually allocated under various components of the Scheme for Harnessing and Allocating Koyala Transparently in India (SHAKTI) Policy during the last year 2025, category-wise; (b) the extent to which coal linkages granted under SHAKTI Policy have translated into actual power generation capacity being operationalised; (c) the criteria and timelines prescribed for allocation of coal linkages under the revised SHAKTI Policy; and (d) the measures taken by the Government to improve uptake of coal offered under linkage auctions to ensure optimal utilisation of domestic coal resources?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImprovement of Railway Services in Kasaragod
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 653 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Government has received proposals for additional train stoppages, extension of train services and improvement of passenger amenities in Kasaragod district; (b) if so, the present status of such proposals; (c) whether any station redevelopment, platform extension or accessibility works have been sanctioned for Kasaragod and nearby stations during the last three years and if so, the details thereof; and (d) the steps taken/being taken by the Government to improve train connectivity between North Kerala, Karnataka and major metropolitan cities?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDetails of Vacancies in Railways
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 654 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) the details of vacancies in Group A, B, C and D in Railways as on date, Group-wise; (b) the details of number of vacancies filled up with permanent appointments during 2025-26 and 2026-27 till date, year, zone and group-wise; (c) the details of number of vacancies filled up with contractual appointments during 2025-26 and 2026-27 till date, year, zone and group-wise; (d) the details of posts of SC, ST, OBC and EWS categories lying vacant in Railways as on date, category-wise; and (e) the timeline for filling up the vacancies in Railways which has reached upto alarming level of compromising railway safety?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCriteria for Selection of Aspirational Districts
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 655 · Asked on 2026-07-22
Ministry: PLANNING
Member asked
(a) the details of specific criteria and selection process prescribed for including a district under the Aspirational Districts Programme (ADP) and the details of its Key Performance Indicators (KPIs) and data sources; (b) whether Shahjahanpur district of Uttar Pradesh is eligible under the Aspirational Districts Programme (ADP); (c) whether the inclusion of Shahjahanpur district in the Aspirational Districts Programme (ADP) is presently under consideration; (d) if so, the status of the process and the timeline thereof; and (e) if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRedevelopment of Railway Station at Tiruvallur and Gummidipoondi under ABSS
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 656 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) the steps taken/being taken by the Government to augment frequency and capacity on the Chennai–Tiruvallur–Arakkonam suburban section; (b) the status of station redevelopment at Tiruvallur and Gummidipoondi under the Amrit Bharat Station Scheme (ABSS); (c) whether new sub-urban lines, halt stations or foot-over-bridges in Tiruvallur district are under consideration and if so, the details thereof; and (d) whether the level crossings in Tiruvallur district approved for conversion to Road Over-Bridges and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMisuse of Mobile Applications to Remotely Disable e-Rickshaws
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 657 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) whether the Government has taken cognizance of the instances of misuse of mobile applications associated with battery management systems to remotely disable e-rickshaws and other electric vehicles and extort money from drivers particularly economically weaker e-rickshaw drivers, on the pretext of restoring the vehicles to operational condition; (b) if so, whether the Government, in coordination with the State Governments, proposes to identify the individuals and entities responsible for such incidents, initiate penal action against them and provide appropriate relief to the affected drivers; (c) if so, whether the Government proposes to implement mandatory cyber security and authentication standards for mobile applications and battery management systems associated with electric vehicles; and (d) the details of other measures being taken by the Government to prevent the recurrence of such incidents and to ensure consumer protection in view of the increasing use of electric vehicles in the country?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCorruption in Issue of Despatch Orders for Coal
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 658 · Asked on 2026-07-22
Ministry: COAL
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware of corruption being committed by issuing Despatch Orders (DOs) for inferior quality coal and then providing them with better quality coal; (b) if so, the number of traders prosecuted so far and the number of people imprisoned; (c) whether the Government is likely to stop the smuggling of quality coal through fake DOs in the Shahupuri area of Chandauli district in Uttar Pradesh; (d) if so, the time by which the smuggling through fake DOs would be prevented; and (e) if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRajpura-Mohali Railway Project
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 659 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) the details of the current status, financial outlay and completion timeline of the approved Rajpura-Mohali railway line project; (b) the details of the section-wise maximum permissible speed limit from Bathinda to Chandigarh via new track and plans to upgrade the tracks to increase train speeds on this route; (c) whether trains coming from the Malwa region require an engine reversal at Rajpura Junction to reach Mohali and if so, the details thereof; (d) whether the feasibility of a crossing with the Ambala-Sirhind via grade-separated crossing track was studied and if so, the details thereof; (e) whether new trains are planned from Delhi to Chandigarh via this new route with a stop at Mohali and if so, the details thereof; and (f) whether any new stations, logistics hubs or dry ports are planned along this new track to boost local trade and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRenewable Energy Potential in North Eastern Region
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 660 · Asked on 2026-07-22
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) the details of the current renewable energy generation and the estimated renewable energy potential of the North-Eastern Region of India, Source and State-wise; (b) whether only about 4-5 GW of renewable energy capacity has been installed in the North Eastern Region (NER) against a potential of nearly 129 GW and if so, the details thereof along with the reasons for under-utilisation of the capacity; (c) whether policy uncertainty and withdrawal of State-level clean energy policies have affected investor confidence in Assam and if so, the details thereof; and (d) the details of the targeted measures proposed and the action taken by the Government for storage solutions, small hydro promotion or special incentives to bridge the gap between potential and installed capacity?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of MSP
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 661 · Asked on 2026-07-22
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) the number and locations of approved procurement centres for Millet and Maize in Tonk and Sawai Madhopur districts during the Kharif Marketing Season (KMS) 2026–27; (b) whether the procurement agencies have ensured that the farmers of Tonk district are able to sell their produce at the Minimum Support Price (MSP) without any compulsion of distress sale; (c) if so, the details of the measures taken by the Government to ensure timely payment of MSP to small and marginal farmers in Tonk and Sawai Madhopur districts; (d) whether an independent audit is being conducted to confirm the compliance of MSP in the State of Rajasthan; and (e) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSmart Grain ATMs
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 662 · Asked on 2026-07-22
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether the Government is making any special budgetary provision for installation of smart Grain ATMs at fair price Shops under One Nation One Ration Card Scheme for migrant workers in the Muzzaffarnagar Lok Sabha Constituency; (b) whether there is any time-bound plan to achieve zero storage losses of foodgrains by adopting modern silo technology in the warehouse of the Food Corporation of India (FCI) and the State Warehousing Corporation in Muzaffarnagar; (c) whether the Government proposes to provide pulses and edible oils at subsidised rates, in addition to fortified rice to Below Poverty Line (BPL) ration card holder in Muzaffarnagar through the Public Distribution system; (d) whether any new guidelines have been issued to further strengthen the Mobile Ration Van Service in remote villages of Muzaffarnagar for the effective implementation of the Pradhan-Mantri Garib Kalyan Anna Yojana (PM-GKAY); and (e) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFunds for Railway Development and Safety Enhancement
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 663 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Government has undertaken any new initiatives for modernisation of railway infrastructure across the country during the last three years; (b) if so, the details thereof, State/UT-wise; (c) the steps taken/being taken by the Government to improve passenger safety and reduce railway accidents during the said period; and (d) the funds allocated and utilised for railway development and safety enhancement during the last three years, year-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceLandslide Early Warning System
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 664 · Asked on 2026-07-22
Ministry: MINES
Member asked
We have not ingested the asking members for this question.
(a) whether the Government proposes to implement a pan-India Landslide Early Warning System (LEWS) in land-slide vulnerable regions and if so, the details thereof; (b) whether prototype of the regional LEWS for the country being developed by Geological Survey of India (GSI) has proven effective in timely prediction of landslides and if so, the details thereof; (c) the details of experimental landslide forecast bulletins issued by GSI during the last two years and its accuracy, district-wise; (d) whether the Government has evaluated the gaps in existing Landslide Early Warning Systems and if so, the details thereof along with the action taken to address the same; (e) whether the Government proposes to establish a Landslide Early Warning System in Wayanad Lok Sabha Constituency and if so, the details thereof; and (f) whether the Government has taken initiatives to involve local communities & NGOs in data collection for landslide/landslip prediction and evaluated the increased efficacy of such systems wherever in use and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceModernisation of Food Storage Infrastructure
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 665 · Asked on 2026-07-22
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether the Government has sanctioned any modern warehouses, silos or food storage facilities in Karbi Anglong and Dima Hasao districts of Assam during the last five years and if so, the details thereof; (b) the details of storage capacity created under various Central Government schemes in Assam, district-wise during the said period; (c) whether any proposals for establishment of scientific warehouses, silos and cold chain infrastructure in Karbi Anglong and Dima Hasao districts are under consideration of the Government; and (d) if so, the details and present status thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.