Pending Railway Infrastructure Projects in Fatehgarh Sahib District
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 616 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Government has undertaken a comprehensive review of pending railway infrastructure projects in Fatehgarh Sahib district of Punjab particularly construction of Road Over Bridges, station redevelopment, elimination of level crossings, strengthening of passenger amenities and measures to ease traffic congestion and improve railway safety and if so, the details thereof; (b) the status of sanctioned railway works, indicating physical and financial progress, revised implementation schedules and the principal reasons for delay, wherever applicable, project-wise; (c) whether proposals have been received from the Government of Punjab, public representatives/railway authorities for improving rail connectivity, freight handling facilities and passenger infrastructure in the region and if so, the details thereof; (d) the mechanism adopted for monitoring implementation of sanctioned railway projects and ensuring adherence to prescribed quality and safety standards; and (e) the measures proposed/to be proposed to accelerate railway infrastructure development, strengthen multimodal connectivity and enhance passenger convenience in the country?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInequality in MPLADs Works
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 617 · Asked on 2026-07-22
Ministry: STATISTICS AND PROGRAMME IMPLEMENTATION
Member asked
(a) whether the Government is aware of such cases in which Member of Parliament Local Area Development (MPLAD) works of the MPs belonging to the opposition party are delayed and their works are not approved on time; (b) whether the Government proposes to take punitive action against such officers; (c) if so, the reaction of the Government thereto; (d) the number of such works in Gurdaspur district of Punjab which could not be started or completed even after months of recommendations or are being repeatedly recommended; (e) whether the Government is likely to take cognizance in the matter in which the BDPO Dera Baba Nanak herself said in the DISHA committee in front of the entire administration that she would not get the work done from the MPLAD fund even if you go to court and she is under pressure of the local MLA; and (f) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceThird Railway Line Project in Kerala
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 618 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Railways has completed the feasibility study and Detailed Project Report (DPR) for the third railway line projects in Kerala and if so, the details thereof; (b) whether the Government has set timeline for completion of the third railway line projects in Kerala particularly in North Kerala and if so, the expected date of completion; and (c) whether the Railways has planned to implement automatic signalling system in the Shoranur–Mangalore section of Southern Railway and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDigital Connectivity in Remote and Hilly Areas, Kolhapur
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 619 · Asked on 2026-07-22
Ministry: COMMUNICATIONS
Member asked
We have not ingested the asking members for this question.
(a) whether dedicated funding will be provided for 4G/5G Saturation Project and BharatNet implementation in backward blocks of Radhanagari and Gaganbawda in Kolhapur, facing unstable mobile connectivity in remote rural and hilly areas; (b) the current BSNL 4G tower installation status, PM-WANI Wi-Fi hotspots operational and optical fibre connectivity coverage block-wise; (c) whether Kolhapur proposes to included in the next phase of Digital India Land Records Modernization Programme (DILRMP) for farmers' benefit; and (d) the details of the funding allocation, implementation timeline and digital literacy centres planned by 2027?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceReview of Statistical Frameworks
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 620 · Asked on 2026-07-22
Ministry: STATISTICS AND PROGRAMME IMPLEMENTATION
Member asked
(a) whether any methodological review has been undertaken to assess adequacy of existing statistical frameworks and if so, the details thereof; (b) whether any expert groups or technical consultations have been constituted and if so, the details thereof; and (c) whether the Government proposes to update statistical standards or survey instruments and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEconomic Viability of FPS Dealers
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 621 · Asked on 2026-07-22
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether the Government has any proposal to include schemes such as Jan Poshan Kendra, Pradhan Mantri Jan Aushadhi Pariyojana (PMBJP) through Fair Price Shops (FPSs) to enhance the economic viability of FPS dealers; (b) if so, the details thereof including the timeline for implementation; (c) whether the Government has received any representations from Fair Price Shop Dealers’ Associations in this regard and if so, the details thereof; (d) whether the Government has any proposal to sell rice and wheat under the Open Market Sale Scheme through Fair Price Shops to enable consumers to purchase grains at Government-specified rates; and (e) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNFSA and PMGKAY
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 622 · Asked on 2026-07-22
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
K. Radhakrishnan, Benny Behanan
(a) the number of beneficiaries covered under National Food Security Act (NFSA) and PM Garib Kalyan Anna Yojana (PMGKAY) as on 30.06.2026, State/UT-wise; (b) whether free foodgrains under PMGKAY have been extended beyond the year 2024 and if so, the financial implication thereof; (c) whether any States have reported exclusion of eligible beneficiaries due to Aadhaar seeding issues and if so, the details thereof; and (d) the details of the steps taken by the Government to ensure portability under One Nation One Ration Card (ONORC)?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCall Drop and Poor Mobile Network Connectivity
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 623 · Asked on 2026-07-22
Ministry: COMMUNICATIONS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware of the persistent call drop and poor mobile network connectivity issues reported from several rural and semi-urban areas of Dharmapuri district in Tamil Nadu, affecting students, farmers, small businesses and emergency communication, if so, the details thereof; (b) whether any district-wise assessment has been undertaken to identify the reasons for frequent call drops, including network congestion, inadequate telecom tower infrastructure, handover failures between cell towers and restrictions on installation of new telecom sites in Dharmapuri, if so, the details thereof; (c) whether the Government proposes to direct telecom service providers to strengthen mobile infrastructure by installing additional towers and upgrading network capacity in the district, if so, the details thereof; and (d) the timeline and other measures proposed to ensure uninterrupted and reliable mobile connectivity for residents of Dharmapuri district?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFOBs for Railway Stations under Pt. Deen Dayal Upadhyay Division
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 624 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Government is aware of the fact that due to lack of proper arrangement of Foot Over Bridge (FOB) at Dumraon railway station under Danapur division, Karamanasha and Mohammad Ganj railway station under Pandit Deen Dayal Upadhyay Division of East Central Railway zones, passengers faces serious difficulties and the risk of accidents in crossing the platform and if so, the details thereof; (b) whether a large number of rural passengers, women, senior citizens and students commute daily at these stations for whom safe and secure pedestrian movement is essential and if so, the details thereof; (c) whether any survey, proposal or sanction has been accorded for construction of FOBs at the above three stations; and (d) the present status thereof and if not, the reasons for not including these stations in the priority list?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceState and District Consumer Disputes Redressal Commissions in Ladakh
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 625 · Asked on 2026-07-22
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether the State Consumer Disputes Redressal Commission and District Consumer Disputes Redressal Commissions have been established and are functional in the Union Territory of Ladakh as mandated under the Consumer Protection Act, 2019; (b) if not, the reasons for the non-establishment or non-functioning of these forums in Union Territory of Ladakh; (c) whether the Government has formulated a timeline for setting up these commissions and making them fully operational in Ladkah; (d) if so, the details thereof and the steps taken by the Government to expedite their establishment including recruitment and infrastructure development; and (e) the details of measures being taken by the Government to ensure effective consumer grievance redressal until these forums are functional?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational Standards for Civil Service Training Institutions
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 626 · Asked on 2026-07-22
Ministry: PERSONNEL, PUBLIC GRIEVANCES AND PENSIONS
Member asked
Vishweshwar Hegde Kageri, Suresh Kumar Kashyap
(a) whether the Government has introduced major changes under National Standards for Civil Service Training Institutions (NSCSTI)- 2.0 which has replaced NSCSTI-2.0 and if so, the details thereof; (b) the progress made in implementation of the NSCSTI-2.0; (c) the details of the number of training institutions assessed and accredited under NSCSTI-2.0 along with their performance grading; and (d) the measures taken to strengthen the quality and standardisation of civil service training across Central Government institutions?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePM-VIKAS Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 627 · Asked on 2026-07-22
Ministry: MINORITY AFFAIRS
Member asked
(a) whether the Government has undertaken a review of the implementation of the PM-VIKAS (Pradhan Mantri Virasat Ka Samvardhan) scheme for skill development and entrepreneurship among minority communities and if so, the details thereof; (b) the details of number of beneficiaries covered under the scheme during the last three years, State/UT-wise; (c) whether the Government has identified any gaps in training, placement and access to credit for minority youth and if so, the details thereof; and (d) the corrective measures proposed to improve employment outcomes and self-employment opportunities under the scheme?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExpansion of Mobile Tower Connections in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 628 · Asked on 2026-07-22
Ministry: COMMUNICATIONS
Member asked
(a) the details of the total number of mobile towers proposed, under construction and presently functional in Andhra Pradesh, district-wise and in Eluru District; (b) the details of the State and year-wise funds allocated, sanctioned, released, and utilised for the expansion and construction of mobile tower infrastructure during the last five years, district-wise for Andhra Pradesh especially in Eluru District; (c) the details of the employment and skill development opportunities generated for youth in Andhra Pradesh as a result of mobile tower construction and related infrastructure activities, with district-wise particulars; and (d) whether any mobile tower construction projects in Andhra Pradesh have been delayed, if so, the details thereof including the causes of such delays and the corrective measures undertaken by the Government to address the same?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCSCs in Thanjavur
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 629 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) the number of Common Service Centres (CSCs) functional in Thanjavur district; (b) the status of digital literacy programmes implemented in the said district under central schemes during the last three years; and (c) the details of cybercrime and/or data fraud complaints originating from Thanjavur district which have been reported to CERT-In and the number, nature and details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFund Allocation for Railway Project in Karnataka
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 630 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) the details of new railway lines, doubling, gauge conversion, electrification, station redevelopment and other railway infrastructure projects and under implementation in the country particularly in Karnataka during each of the last five years, project-wise and district-wise; (b) the details of funds allocated, released and utilised for these projects during the said period, year and project-wise; (c) the present status of each project including the physical and financial progress expected date of completion and reasons for delay, if any; (d) the details of projects completed and dedicated to the public during the last five years, district-wise; and (e) the steps taken by the Government to expedite pending railway projects and enhance rail connectivity, passenger amenities and freight infrastructure in Karnataka?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDemand of General Class Coaches in Railways
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 631 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Government is aware of the increasing demand for General Class coaches, particularly among short-distance passengers and economically weaker sections who depend on affordable rail travel, if so, the details thereof and if not, the reasons therefor; (b) whether the Government has conducted any assessment of passenger demand, occupancy levels and overcrowding in General Class coaches across the railway network, if so, the details thereof; (c) whether the Government proposes to increase the number of General Class coaches in existing trains/introduce additional General Class services to meet the growing public demand, if so, the details thereof; and (d) the steps taken/proposed to be taken to reduce overcrowding and enhance the availability of General Class accommodation across the Railways?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDifficulties faced by Passengers travelling in General/Unreserved/Sleeper Class Coaches
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 632 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Railway Board has taken direct cognizance of the extreme overcrowding, lack of ventilation and safety hazards faced by passengers travelling in general, unreserved and sleeper class coaches across long-distance trains; (b) if so, the total number of new regular Amrit Bharat and special non-AC general category trains introduced during the last two financial years to manage peak festive rushes particularly in Bihar and Madhya Pradesh; (c) whether the Government is systematically increasing the total number of general and sleeper coaches in existing popular trains and if so, the details thereof; (d) the concrete measures taken/being taken by the Government to ensure functional lights, clean mobile charging points, and hygienic running water in all non-AC public compartments; and (e) the steps taken/being taken by the Government to expand automated ticket vending machines at small rural stations?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExpansion of Renewable Energy Projects in Uttar Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 633 · Asked on 2026-07-22
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) whether the Government is aware of the fact that the expected expansion of new and renewable energy schemes has not taken place in the Etawah Lok Sabha Constituency of Uttar Pradesh; (b) if so, the details of projects sanctioned and installed and amount spent under the Pradhan Mantri Surya Ghar Muft Bijli Yojana (PM-SGMBY), Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyaan (PM-KUSUM), solar rooftop installation, solar pumps and other renewable energy schemes in the Etawah Lok Sabha Constituency during the last three years, scheme-wise; (c) whether the Government proposes to sanction additional solar high mast lights, solar street light and other community solar energy projects to increase energy availability in the rural and remote areas of the Etawah Lok Sabha Constituency; and (d) if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAcknowledgement Letter to Members of Parliament
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 634 · Asked on 2026-07-22
Ministry: PERSONNEL, PUBLIC GRIEVANCES AND PENSIONS
Member asked
We have not ingested the asking members for this question.
(a) whether most Central Ministries do not even send an acknowledgement of receipt of letters received from Members of Parliament relating to their Parliamentary Constituencies and matters of public interest and even in most cases no meaningful reply is received; (b) if so, whether the Government considers this to be against the dignity of Parliament and constitutional role of elected representatives; (c) the number of Ministries/Departments presently complying with the provisions of the guidelines issued by the Ministry of Personnel, Public Grievances and Pensions on 12 January, 2026 providing for sending an acknowledgement within 15 days and a reply within the next 15 days and the mechanism put in place to monitor such compliance; and (d) the details of concrete steps proposed to be taken by the Government to ensure accountability of the Ministries/Departments for violating the prescribed timelines for responding to the letters of Members of Parliament?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment of Kollam Railway Station
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 635 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Government proposes to complete the railway development works in a time- bound manner and if so, the details thereof; (b) the present status of development work of Kollam Railway Station and the percentage of works completed, physical progress, financial progress and proposed date of completion; (c) whether the Government initiated action to complete the development of Railway Over Bridge (ROB) works in Kollam Lok Sabha Constituency and if so, the details thereof; (d) whether the Government initiated action to construct the ROB at Kundara Pallimukku in a time-bound manner and if so, the details thereof; and (e) whether the Government initiated timely action to give permission to construct a ROB at Valacode considering the black spot if so, the details of action taken thereon?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMinority concentrated Area Development in Raichur :
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 636 · Asked on 2026-07-22
Ministry: MINORITY AFFAIRS
Member asked
(a) the details of minority-concentrated blocks, towns and wards identified in Raichur district under PMJVK and the socio-economic and basic amenity indicators on the basis of which they were selected; (b) the status of access to secondary schools, PHCs, piped drinking water, household toilets, pucca roads and street lighting in such minority-concentrated areas of Raichur ward/taluk-wise; (c) the details of the number of PMJVK projects sanctioned for Raichur since 2018 and those remaining incomplete, non-operational or abandoned along with the reasons therefor; (d) the comparative position of minority-concentrated areas in Raichur vis-à-vis district averages on literacy, female literacy, school dropout rates, unemployment and housing deprivation; and (e) the details of specific interventions proposed during the next three years to bridge these deficits in minority-concentrated areas of Raichur along with the timelines and budgetary allocations?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceTrain Service from Ambedkar Nagar District to New Delhi
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 637 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether at present there is no direct train service from Ambedkar Nagar district of Uttar Pradesh to New Delhi Railway Station causing inconvenience to students, working persons, traders, patients and senior citizens; (b) whether the Government is contemplating to start a direct express or superfast train service between Ambedkar Nagar and New Delhi; (c) if so, the likely time-frame for starting the said train service; and (d) whether the Government has made any assessment of the likely benefit to the passengers of Purvanchal region including Sultanpur, Amethi and Ayodhya divisions from this proposal?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceResumption of pending Railway Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 638 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Government earlier reply confirming financial sanction of hundred crore under hundred percent Railway funding for the Railway Overbridge (ROB) at Khalitpur in lieu of LC Gate No. 49/SPL at Kaliachak to Mothabari block road, Malda, construction has not yet commenced and if so, the details thereof including the timeline; and (b) whether the “Special Class” ROB (TVU more than 4 Lakhs) at Samsi, Ratua 1 Block Level Crossing No. 101, sanctioned in the Railway Budget 2011-12 and the foundation stone was laid in 2013 is still pending and if so, the details thereof including the reasons therefor and the timeline fixed for commencement and completion of Railway Overbridge?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePM-KUSUM in Bihar
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 639 · Asked on 2026-07-22
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) the current status of implementation of Pradhan Mantri-Kisan Urja Suraksha evam Utthaan Mahabhiyaan (PM-KUSUM) under the three distinct operational components to achieve comprehensive agricultural de-dieselisation across the country; (b) the total number of decentralized solar plants set up, off-grid solar pumps deployed and grid-connected pumps solarised accross the country, State/UT-wise; (c) the specific progress achieved, number of solar pumps commissioned and aggregate clean energy generated under these frameworks in the State of Bihar particularly in Saran; (d) the structural specifications of the digital tools deployed including the centralized integration portal and Remote Monitoring Systems (RMS) to track real-time generation parameters; and (e) the measures taken by the Government to streamline central financial assistance releases and fast-track power purchase agreement executions between farmers and local power distribution companies?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePromotion Schemes for Independent and Regional Film Makers
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 640 · Asked on 2026-07-22
Ministry: INFORMATION AND BROADCASTING
Member asked
(a) whether the Government has taken note that many film makers producing quality and content-driven films face difficulties relating to financing, high production costs, limited access to modern studios, post-production facilities and inadequate international marketing support; (b) if so, whether these challenges have affected India’s ability to secure greater recognition and awards at major international film festivals; (c) if so, the details of film production, post-production and film city infrastructure available in Maharashtra particularly in Mumbai, Nashik and Pune; (d) whether the Government proposes to provide financial assistance, incentives, co-production facilities and dedicated promotion schemes for independent and regional film makers in Maharashtra; and (e) the steps taken by the Government to strengthen Maharashtra’s film ecosystem and enhance the global competitiveness of Indian films at international film festivals and markets?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.