Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 3,276–3,300 / 34,220
Projects approved under DLI Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 479 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) the number of projects approved under the Design Linked Incentive (DLI) Scheme that have progressed to tape-out, successful fabrication and deployment in electronic products, respectively along with the sector-wise details thereof; (b) whether the Government has undertaken any assessment of the challenges faced by DLI-supported companies in progressing from tape-out to fabrication and from fabrication to deployment and if so, the findings thereof along with the details of steps taken or proposed to be taken; (c) the number of applicants that have become eligible for incentives and the number that have received disbursements under the Product Design Linked Incentive and Deployment Linked Incentive components along with the amount sanctioned and disbursed under each component; and (d) whether the Government proposes to strengthen post-design support under the DLI Scheme including testing, certification, manufacturing partnerships and market access to facilitate deployment of indigenous semiconductor designs and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConsumer Disputes Redressal Commissions
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 48 · Asked on 2026-07-22
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) the total sanctioned strength of Consumer Disputes Redressal Commissions (State Commission and District Commissions) in the State of Bihar and the numbers of commissions currently functional; (b) the details of the number of sanctioned posts for Chairpersons, Members and other staff in the said Commissions and number of posts which are currently vacant; (c) whether the disposal of cases is being delayed due to a shortage of manpower in various District Consumer Commissions across Bihar; (d) if so, the steps taken by the Government so far to fill the vacant posts and the tentative timeline to fill them; and (e) the current status report of the District Consumer Disputes Redressal Commission operating under the Bhagalpur Lok Sabha Constituency including the number of pending cases, the number of cases disposed of during the last three years and the details of vacant posts?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceResearch Scheme of NITI Aayog
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 480 · Asked on 2026-07-22
Ministry: PLANNING
Member asked
(a) the details of funds allocated and utilised under the Research Scheme of NITI Aayog (RSNA) 2021 during the last five years, year-wise; (b) the details of organisations that have received financial support for research under the scheme during the last five years, State-wise particularly to Andhra Pradesh along with the nature and subject of research supported; (c) whether a monitoring and evaluation mechanism exists to track the quality, timeliness and utilisation of research outputs under the scheme and if so, the details thereof including steps taken in cases of delay or non-delivery of research outcomes; and (d) the details of the number of research projects approved, commenced, completed and pending under the Research Scheme of NITI Aayog (RSNA) 2021 during the last five years, along with the average time taken for completion, year-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceShare of Renewable Energy in Energy Mix
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 481 · Asked on 2026-07-22
Ministry: NEW AND RENEWABLE ENERGY
Member asked
We have not ingested the asking members for this question.
(a) the percentage increase in renewable energy generation excluding large hydro during the first half of the year 2025 and the current share of non-hydro renewables in the national electricity mix; (b) the details of roadmap of Government for scaling up Battery Energy Storage Systems (BESS) to support grid stability and enable integration of variable renewables; (c) the projected contribution of energy storage infrastructure in achieving the national target of 500 GW of non-fossil fuel-based capacity by the year 2030 especially in high potential States like Tamil Nadu; and (d) whether the Government is upgrading grid infrastructure and streamlining Power Purchase Agreements (PPAs) to address risks and delays in renewable procurement and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExpansion of Public Broadcasting in Punjab
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 482 · Asked on 2026-07-22
Ministry: INFORMATION AND BROADCASTING
Member asked
(a) whether the Government proposes to expand public broadcasting, regional news outreach or community media services in Punjab; (b) if so, the details thereof; (c) whether any steps have been taken by the Government to improve Punjabi-language content and coverage of border, rural and cultural issues; and (d) the details of funds allocated for such programmes during the current year?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProgress under India Semiconductor Mission 2.0
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 483 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
Krishna Prasad Tenneti, Vishweshwar Hegde Kageri, Dilip Saikia, Nishikant Dubey, P. P. Chaudhary, Manna Lal Rawat, Naba Charan Majhi, Kamlesh Jangde, Praveen Patel, Vijay Kumar Dubey
(a) the progress made under the India Semiconductor Mission 2.0 including the semiconductor projects approved till May, 2026; (b) the status of the establishment of semiconductor fabrication, ATMP/OSAT and component manufacturing facilities under the Mission; (c) the steps taken to strengthen the domestic semiconductor supply chain, research and skilled workforce; (d) the employment likely to be generated by the growth of domestic electronics manufacturing; (e) the expected contribution of the Mission towards enhancing domestic electronics manufacturing and reducing import dependence; and (f) whether there are any approved semiconductor projects located in the State of Rajasthan?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRevision of MPLADS Funds
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 484 · Asked on 2026-07-22
Ministry: STATISTICS AND PROGRAMME IMPLEMENTATION
Member asked
(a) the reasons for continuing the annual allocation under the Members of Parliament Local Area Development Scheme (MPLADS) at Rs. 5 crore per Member since 2011–12, despite inflation and increased cost of public works; (b) whether the Government has undertaken any review or assessment of the adequacy of the present MPLADS limit in view of current development needs; (c) whether the Government proposes to revise or enhance the MPLADS annual allocation and if so, the details thereof; and (d) whether the Government has prepared any time-bound roadmap or framework for increasing the MPLADS limit and if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUpgraded National Youth Parliament Scheme (NYPS 2.0) Portal
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 485 · Asked on 2026-07-22
Ministry: PARLIAMENTARY AFFAIRS
Member asked
Hemang Joshi, Ashish Dubey, Nishikant Dubey, Bhojraj Nag, Suresh Kumar Kashyap, Rahul Lodhi, Khagen Murmu, Alok Sharma, Brijesh Chowta, Amar Kale, Arun Govil
(a) whether the Government has launched an upgraded version (NYPS 2.0) of the National Youth Parliament Scheme portal, if so, the reasons for the upgrade along with the specific new features it offers over the earlier version; (b) whether the NYPS 2.0 now permits participation of unregistered institutions, informal groups and individual citizens, in addition to recognised educational institutions, if so, the details thereof including that of any unorganised institute from Jabalpur apart from educational institute, State/UT-wise cumulatively since inception of the portal; (c) the cumulative number of institutional, group and individual registrations recorded on the portal since its launch, State/UT-wise including Karnataka and Himachal Pradesh particularly in Dakshina Kannada and Shimla Lok Sabha Constituency; and (d) whether any targets have been set for onboarding institutions, groups and individuals during the year 2026-27 and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOperational Solar Parks in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 486 · Asked on 2026-07-22
Ministry: NEW AND RENEWABLE ENERGY
Member asked
Balwant Wankhade, Amol Kolhe, Supriya Sule, Varsha Gaikwad, Sanjay Dina Patil, Dhairyasheel Mohite Patil
(a) whether the Government has assessed the contribution of operational solar parks in Maharashtra towards achieving the State's renewable energy targets under the National Solar Mission and the country's clean energy goals; (b) if so, the details of operational, under-construction and approved solar parks in Maharashtra indicating their district-wise installed capacity, power generation and present operational status; (c) the total solar power capacity generated through these solar parks during the last three years and the current year along with the quantum of power supplied to the State grid; (d) whether any constraints relating to land acquisition, transmission infrastructure, financing or grid integration have affected the timely implementation of solar parks in Maharashtra; and (e) if so, the measures being taken by the Government to expand solar park capacity, strengthen transmission infrastructure and accelerate renewable energy generation in Maharashtra?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMobile Tower Connectivity in Maharajganj
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 487 · Asked on 2026-07-22
Ministry: COMMUNICATIONS
Member asked
(a) whether the Government has assessed the availability and coverage of mobile tower connectivity in the Maharajganj Lok Sabha Constituency in Bihar; (b) if so, the details thereof including the total number of mobile towers installed, operational and non-operational towers, telecom operator-wise and location-wise; (c) whether there are identified villages/areas in the said constituency which are still unserved or underserved in terms of mobile network connectivity; (d) if so, the details thereof along with the steps taken under various schemes such as BharatNet and other telecom infrastructure initiatives to improve coverage in the said constituency; and (e) whether the Government proposes to install additional mobile towers or upgrade existing infrastructure in the said constituency to improve 4G/5G connectivity and if so, the details thereof including timelines and funding support?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceLack of Basic Amenities at Railway Station of Sindhudurg District
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 488 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether any scheme has been proposed for beautification of platforms and construction of sheds, toilets, provision of drinking water, waiting hall and development of other basic amenities at railway stations of Sindhudurg district and if so, the details thereof; (b) whether there is any proposal for starting ticket booking service at Oros and Vaibhavbadi railway stations and if so, the details thereof; (c) whether the Government is providing additional stoppages for important express trains at prominent railway stations of Sindhudurg district and if so, the details thereof; and (d) the details of funds sanctioned for completion of the said works?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceModernisation of Haj Infrastructure
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 489 · Asked on 2026-07-22
Ministry: MINORITY AFFAIRS
Member asked
(a) the details of projects undertaken by the Government for modernising and expanding Haj infrastructure; (b) the measures being taken to improve coordination between Government, Haj Committee of India and State authorities for Haj 2026 preparations in the country especially in Tamil Nadu; (c) whether Haj quota for the State of Tamil Nadu would be increased in view of large number of Muslim pilgrims aspiring to perform Haj and increase in the population of Muslims in the State and if so, the details thereof; and (d) the details of initiatives adopted to ensure safety, comfort and logistical convenience of pilgrims especially senior citizens and first-time Haj travelers?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceReweighting of ISM 2.0
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 49 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware that no India Semiconductor Mission (ISM) approved fab or display project has been sited in Tamil Nadu as of mid-2026 despite its 2024 semiconductor policy offering upto 50 per cent additional capital subsidy and its established Sriperumbudur base while Gujarat has secured the Tata-ASML anchor fab and Dholera SEZ notification (9 April 2026); (b) if so, whether ISM 2.0’s reweighting toward equipment, materials and IP announced in Budget 2026-27 structurally disadvantages Tamil Nadu’s ATMP/OSAT and design-led pitch; (c) if so, the status of pending Central clearances—port capacity, SEZ notification, power allocation—for the proposed Rs.80,000 crore Taiwanese investment evaluating Tirunelveli and Thoothukudi; (d) the details of steps taken by the Government to build a sovereign frontier Artificial Intelligence (AI)/Large Language Model (LLM) capacity following the confirmed suspension (12 June) and restoration (1 July 2026) of access to frontier US-AI models under export controls and whether the India-US Bilateral Trade Agreement addresses AI hardware access; (e) the details of Tamil Nadu’s share of the IndiaAI Mission GPU/compute allocation and Centre of Excellence funding relative to other States; and (f) the details of Common Service Centre saturation in Tamil Nadu’s rural and hill blocks versus the national average?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSanitation and Drinking Water Facilities in Trains
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 490 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Government is aware of the fact that the sanitation system in various trains of the country, especially cleanliness of toilets and availability of water is still not at a satisfactory level and if so, the details thereof; (b) the details of complaints received regarding cleanliness in trains and railway stations and their disposal during the last three years, year and zone-wise; (c) the details of steps, technology/monitoring system implemented by the Government to ensure regular availability of clean drinking water and clean toilet facilities to the passengers; and (d) the corrective measures taken/being taken by the Government to make the grievance redressal system of Railways more effective, transparent and time bound?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceHolding of Elective Office by Government Servants
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 491 · Asked on 2026-07-22
Ministry: PERSONNEL, PUBLIC GRIEVANCES AND PENSIONS
Member asked
(a) whether OM Nos. 11013/1/2016-Estt.A-III dated 27th February, 2020 and 5th August, 2019 of DoPT limit a Government servant to a maximum of two terms or five years, whichever is earlier, when holding an elective office and is prior sanction required for such positions; (b) whether this restriction solely applicable to Government-affiliated sports associations/federations or it extend to other types of organisations such as Durga Puja Samities, Ram Leela Committees and Jagran Committees formed by the Government servants/retired Government servants and if so, the details thereof; (c) whether this rule also apply to private associations/federations where a Government servant is a member and if so, the details thereof; (d) whether this rule also applicable to religious organisations such as Puja Samities, Ram Leela Committees and Jagran Committees regardless of whether they are registered under the Trust/Societies Act or are unregistered; (e) if so, whether it similarly restrict Government servants from holding elective office in that organisation (Puja Samities, etc.) for more than two terms or five years, whichever is earlier and if so, the details thereof; and (f) whether any prior permission is being mandatory and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEstablishment of a New FM Radio Station at Pathanapuram in Kollam
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 492 · Asked on 2026-07-22
Ministry: INFORMATION AND BROADCASTING
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has received any proposal for establishing a new FM radio station at Pathanapuram in Kollam district, Kerala and if so, the details thereof; (b) whether the Government has assessed the feasibility and requirement of setting up an FM radio station at Pathanapuram to improve radio coverage in the eastern and hilly regions of Kollam district and adjoining areas; (c) if so, whether any survey or technical study has been conducted regarding frequency availability, transmission infrastructure and coverage for such a station and if so, the details thereof; (d) whether the Government proposes to establish a new FM radio station at Pathanapuram under Prasar Bharati or through the private FM broadcasting policy and if so, the details and timeline thereof; and (e) the steps taken or proposed by the Government to improve FM radio coverage and public broadcasting services in the eastern parts of Kollam district including Pathanapuram?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceActive Ration Cards
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 493 · Asked on 2026-07-22
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) the total number of active ration cards in the country till July 2026, State-wise; (b) the total number of ration cards cancelled during 2024 to 2026, State and year-wise; (c) the major reasons cited for cancellation of ration cards along with the number of ration cards, year-wise; (d) the number of ration cards cancelled due to non-completion of e-KYC or Aadhaar authentication, year-wise; (e) whether the Government has received reports or complaints of ration cards being wrongly cancelled; (f) if so, the details thereof along with the steps taken by the Government to verify the eligible beneficiaries and restore them; and (g) the details thereof in respect of Union Territory of Dadra and Nagar Haveli?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Modernisation across Country
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 494 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) the details of the progress registered under modernisation programmes covering high-speed and semi-high-speed train systems including sleeper variants of advanced trainsets designed to improve long-distance rail travel and strengthen passenger mobility across the country; (b) the current status of implementation relating to manufacturing, testing, deployment and expansion of such train services along with the railway corridors identified for their introduction; (c) the details of the impact anticipated from these initiatives on travel time, network capacity, operational efficiency, regional connectivity and the overall passenger travel experience; (d) the details of the infrastructure and technological upgrades undertaken by the Government for supporting the operation of advanced train systems, including track improvements, signalling modernisation and safety enhancement measures; and (e) the initiatives proposed by the Government for accelerating railway modernisation while improving efficiency, safety, passenger comfort and the quality of long-distance rail services across the country?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCommercial Coal Mining in Jharkhand
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 495 · Asked on 2026-07-22
Ministry: COAL
Member asked
(a) the number of coal blocks auctioned under commercial mining in the country including Jharkhand particularly in the Chatra Lok Sabha Constituency and the number of blocks where production has commenced along with the status of the remaining blocks; (b) the quantity of coal produced from commercial coal mines in the country including Jharkhand particularly in the Chatra Lok Sabha Constituency during the financial year 2025–26 and their contribution to the State's and country's total domestic coal production; (c) the steps taken by the Government to facilitate the timely development of commercial coal mines in the country including Jharkhand particularly in the Chatra Lok Sabha Constituency through faster statutory clearances, land acquisition, environmental and forest approvals and supporting rail and road infrastructure; and (d) whether the Government has any special plan to expedite operationalisation of commercial coal projects and promote local employment and infrastructure development in the country particularly in the Chatra Lok Sabha Constituency and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation and Progress of Kavach 4.0 in Railway Network
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 496 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
Ashish Dubey, Jashubhai Rathva, Hemant Savara, Dileshwar Kamait, Avimanyu Sethi, Kamlesh Jangde, Radheshyam Rathiya, Praveen Patel, Dilip Saikia, P. P. Chaudhary, Manna Lal Rawat, Shashank Mani, Vijay Kumar Dubey
(a) the progress made in deployment of Kavach 4.0 including the kilometers of routes covered and the number of locomotives equipped therewith as on date in the country particularly in Rajasthan; (b) the railway zones and high-density corridors identified for implementation during the year 2025-2026 and 2026-2027, year and zone-wise; (c) whether any timeline has been fixed for the network-wide deployment of Kavach and if so, the details thereof; and (d) the measures taken to expedite the installation and commissioning of Kavach across Railway network?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAI Data Labs
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 497 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
We have not ingested the asking members for this question.
(a) the number of IndiaAI Data and AI Labs approved, established and operational in the country, State/UT-wise especially in Andhra Pradesh; (b) the number of persons enrolled, trained and certified through such Labs since inception, year and State/UT-wise especially in Andhra Pradesh; (c) the details of courses, training programmes and capacity-building initiatives offered through such Labs and the institutions engaged in their implementation; (d) the details of funds sanctioned, released and utilised for establishment and operation of such Labs, year and State/UT-wise especially in Andhra Pradesh; (e) whether the Government has assessed training, placement, employment and entrepreneurship outcomes of persons trained through such Labs and if so, the details thereof; and (f) the details of steps taken or proposed by the Government to establish additional IndiaAI Data and AI Labs and strengthen their utilisation in Andhra Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRevenue Generation due to Commercial Coal Mining
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 498 · Asked on 2026-07-22
Ministry: COAL
Member asked
We have not ingested the asking members for this question.
(a) the number of coal blocks auctioned under the commercial coal mining regime and the revenue generated for the Central and State exchequers during the last three years; (b) the details of safeguards built into the auction process to ensure transparency and environmental compliance; and (c) the details of employment generated in coal-bearing States as a result thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceLimited Digital Infrastructure in Western Uttar Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 499 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware of limited digital infrastructure, cyber awareness and IT-based employment opportunities in Western Uttar Pradesh; (b) if so, the details of steps taken by the Government to promote digital inclusion and IT skill development in the region; (c) whether similar challenges exist across the country; and (d) if so, the details of national measures undertaken to strengthen digital governance and the IT ecosystem?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceIndia AI Mission
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 50 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
Avimanyu Sethi, Chandra Prakash Joshi
(a) the details of progress made under the India AI Mission till May 2026 including the initiatives launched pursuant to the India AI Governance Guidelines; (b) the present status of development of indigenous AI foundation models, common compute infrastructure and AI datasets under the Mission; (c) the details of measures taken by the Government to promote adoption of Artificial Intelligence by startups, Micro, Small and Medium Enterprises (MSMEs) and academic and technical institutions particularly in Meerut and Hapur in Uttar Pradesh, Himachal Pradesh particularly in Shimla Lok Sabha Constituency, Nabarangpur Lok Sabha Constituency of Odisha, Dakshin Kannada, Maharashtra particularly Jalgaon Lok Sabha Constituency to generate employment opportunities for the youth thereunder; (d) whether any proposal for data centre in Dakshina Kannada is pending with the Government and if so, the details thereof; (e) whether the Government proposes to establish AI innovation, skilling and research facilities in Maharashtra particularly in Jalgaon Lok Sabha Constituency and if so, the details thereof; (f) the details of safeguards put in place to ensure responsible, transparent, secure and ethical deployment of artificial intelligence technologies along with the roadmap for implementation of the Mission; and (g) the steps taken to strengthen India’s global leadership in Artificial Intelligence and extend the benefits of India AI Mission to remote and aspirational regions including Nabarangpur Lok Sabha Constituency?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProjects Sanction under MPLADS
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 500 · Asked on 2026-07-22
Ministry: STATISTICS AND PROGRAMME IMPLEMENTATION
Member asked
(a) the details of the projects sanctioned under Member of Parliament Local Area Development Scheme (MPLADS) and achievement of Member of Parliaments in spending and utilisation of MPLADS funds, State-wise; and (b) the details of reports on the Periodic Labour Force Survey (PLFS) and Employment, Household Consumption Expenditure Survey (HCES) in both urban and rural areas, the Comprehensive Modular Survey (CMS), the Annual Survey of Industries (ASI) on manufacturing and infrastructure projects monitoring with Support for Statistical Strengthening (SSS) to enhance their capacity and infrastructure development therein during the last five financial years, State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.