Implementation of India Semiconductor Mission
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 41 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) whether the Government is implementing the India Semiconductor Mission (ISM) to promote the establishment of semiconductor fabrication plants and allied manufacturing facilities in the country and if so, the details thereof; (b) the details of semiconductor fabrication plants and related projects approved so far including their locations and State-wise distribution; (c) whether it is a fact that despite Tamil Nadu being one of the leading hubs for electronics manufacturing and exports in the country, no major semiconductor fabrication plant has been allotted to the State; (d) if so, the reasons therefor including the details of proposals if any, received from Tamil Nadu and rejected; and (e) whether the Government proposes to extend additional support or incentives to encourage the setting up of semiconductor fabrication facilities in Tamil Nadu and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRevival of MTNL
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 42 · Asked on 2026-07-22
Ministry: COMMUNICATIONS
Member asked
(a) the details of financial and administrative measures taken by the Government for the revival of Mahanagar Telephone Nigam Limited (MTNL); (b) the details of the amount sanctioned, released and spent so far under the revival package; (c) the extent of improvement in the company's financial position as a result of these measures; (d) the details of MTNL's revenue, profit/loss, total liabilities and total assets during the last five years, year-wise; and (e) whether the Government is considering implementing any new restructuring plan for MTNL in the near future and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUnauthorised Booking of Tatkal Tickets
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 43 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware that the Tatkal ticket booking system remains highly ineffective for ordinary passengers as tickets get exhausted within minutes due to the use of software and nexus of brokers; (b) if so, the number of unauthorized agents apprehended across railway zones during the last five years and current year along with the details of punitive actions taken against them; and (c) the details of the concrete and detailed structural, technical and cybersecurity measures being implemented by the Government to permanently block automated booking bots and ensure a fair, transparent ticketing process for common citizens?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDelays in the Implementation of MPLADS Works
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 44 · Asked on 2026-07-22
Ministry: STATISTICS AND PROGRAMME IMPLEMENTATION
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has prescribed timelines for the execution of works under the Members of Parliament Local Area Development Scheme (MPLADS) and if so, the details thereof; (b) whether the Government monitors delays in the implementation of MPLADS works and utilisation of MPLADS funds by District Authorities and if so, the details thereof; (c) the details of the action taken by the Government against District Authorities that fail to implement MPLADS works within the prescribed time, delay the utilisation of funds or fail to release payments without valid reasons; (d) whether any District Collectors/Deputy Commissioners or implementing agencies have been issued warnings, show-cause notices, directions or any other administrative action during the last five years for poor implementation of MPLADS works and if so, the details thereof; and (e) whether the Government proposes to introduce a time-bound accountability mechanism including periodic performance evaluation of District Authorities to ensure timely execution of MPLADS works and effective utilisation of public funds and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Projects in Andhra Pradesh
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 45 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
Y. S. Avinash Reddy, P. V. Midhun Reddy
(a) the details of the status of thirty three (33) legacy railway projects in Andhra Pradesh including the details of the total expenditure incurred and the number of projects completed till May 2026; (b) the details of the projects covered under Rs.9,470 crore railway allocation for Andhra Pradesh during the Financial Year 2024-25(announced by the Ministry in December 2025) along with respective allocations under the classification of new lines or doubling projects or station redevelopment works; and (c) the details of the current execution status of the Nadikudi-Srikalahasti new railway line including the total sanctioned cost, actual expenditure incurred to date, completed track length and the revised target date for 100 percent completion?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMandated Standard Pack Sizes for Major Edible Oils under the Legal Metrology Framework
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 46 · Asked on 2026-07-22
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
Dhairyasheel Mohite Patil, Supriya Sule
(a) whether the Government has mandated standard pack sizes for major edible oils under the Legal Metrology framework and provided manufacturers, packers and importers a three-month period for compliance and if so, the details thereof; (b) whether the Government is aware that the proliferation of irregular pack sizes had caused difficulties for consumers in Maharashtra especially in Amravati in comparing prices and led to confusion among buyers and if so, the details thereof; (c) the details of the standard pack sizes prescribed for major edible oils and the mechanism put in place to ensure compliance by manufacturers, packers and importers operating in Maharashtra; (d) the measures taken to monitor violations, prevent misleading packaging practices and protect consumers in the State; and (e) whether the Government proposes to conduct awareness campaigns and strengthen enforcement through Legal Metrology authorities in Maharashtra and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImpact of El Nino Conditions on the Southwest Monsoon
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 461 · Asked on 2026-07-22
Ministry: EARTH SCIENCES
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has assessed the impact of El Niño conditions on the southwest monsoon during the current year and if so, the details thereof; (b) whether several States have experienced deficient rainfall on account of El Niño and if so, the details thereof; (c) the details of likely impact of the rainfall deficit on agriculture, drinking water availability and hydroelectric power generation; and (d) the details of measures taken by the Government to mitigate the adverse effects of deficient rainfall?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRainfall Deficit
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 462 · Asked on 2026-07-22
Ministry: EARTH SCIENCES
Member asked
(a) whether as per the India Meteorological Department rain deficit have been registered in many parts of the country during the monsoon season of 2026 as compared to last year and if so, the details thereof, State-wise; (b) whether the rain deficit has affected agricultural production, water resources, drinking water availability and ground water levels and if so, the details of the Government’s assessment in this regard; (c) whether uneven rainfall has led to drought and flood like conditions in some States and if so, the details thereof, State and district-wise; and (d) whether the Government proposes to implement any new scheme to strengthen the weather forecasting system, enhance water conservation and provide special relief and long-term solutions for drought affected areas and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInformation Security Auditing Organisations
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 463 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
We have not ingested the asking members for this question.
(a) the details of Information Security Auditing Organisations empanelled by CERT-In (Indian - Computer Emergency Response Team) for conducting vulnerability assessment, penetration testing and other security audits, State-wise; (b) the number of cybersecurity risks, vulnerabilities or non-compliances identified through the audits conducted for the banking sector between 2021 to 2025, year-wise; (c) the details of the efficacy of such audits including whether CERT-In has conducted any assessment of improvements in cybersecurity posture, reduction in incidents or compliance levels following these audits; (d) whether the Government proposes to expand the empanelled auditor network or revise audit guidelines to strengthen cybersecurity in the banking sector; and (e) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAllocation for ISM 2.0
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 464 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) whether the Government worked out a proposal entailing an allocation of Rs 1.25 lakh crore for the India Semiconductor Mission 2.0 as the country looks to advance global chip-making ambitions and cement its position as a semiconductor destination for the world; (b) if so, the details thereof along with the progress made, goals set and achieved in Telangana; (c) whether India’s semiconductor push is likely to create countless jobs and Government opened semiconductor facilities recently such clusters is likely to bring about economic transformation urges youth to tap new opportunities in the emerging Artificial Intelligence era; (d) if so, the details thereof, State-wise particularly for Telangana and Andhra Pradesh; (e) the details of jobs given and action plan worked for Viksit Bharat-2047 along with the funds sanctioned and spent therefor; and (f) the details of DPRs and other proposals submitted by State Government of Telangana to Central Government and the action taken on semiconductor issues and its development in the said States?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Digital India-GENESIS Programme in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 465 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
Varsha Gaikwad, Sanjay Dina Patil, Dhairyasheel Mohite Patil, Bhaskar Bhagare, Balwant Wankhade, Amol Kolhe, Supriya Sule
(a) whether the Government has reviewed the implementation of Digital India-GENESIS programme in Maharashtra and if so, the details thereof; (b) the details of start-ups, incubators and innovation hubs in Tier-II and Tier-III cities of Maharashtra that have been supported under the programme during the last three years and the current year; (c) whether objectives of promoting collaborative engagement among start-ups, Government and corporates for digitisation and employment generation have been achieved in the said State and if so, the details thereof; (d) whether the Government is aware that start-ups in non-metro regions of Maharashtra continue to face inadequate infrastructure, limited access to mentors and funding constraints and if so, the details thereof; and (e) the details of the steps taken or proposed to expand the coverage of Digital India-GENESIS and strengthen start-up ecosystem in Tier-II and Tier-III cities of Maharashtra and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Mission Mausam
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 466 · Asked on 2026-07-22
Ministry: EARTH SCIENCES
Member asked
Mala Rajya Laxmi Shah, Arun Govil, Alok Sharma, Bhojraj Nag, Vishweshwar Hegde Kageri, Ashish Dubey, Rahul Lodhi, Sanjay Jaiswal
(a) the details of progress made under Mission Mausam since its launch including the major infrastructure and technological upgrades undertaken; (b) the status of deployment of Doppler Weather Radars, upper-air observation systems and other weather monitoring infrastructure under the Mission; (c) the details of measures taken to improve forecasting and early warning of cyclones, heavy rainfall and other extreme weather events; (d) the details of roadmap for achieving Panchayat-level weather forecasting and strengthening climate services under the Mission; (e) the time by which the early warning of sudden storms, hail storms and heavy rains in major agricultural areas like Meerut and Hapur in Uttar Pradesh is likely to be established; and (f) whether there is any plan to set up State level weather centre in the country and if so, the details thereof, State/UT-wise particularly Bhopal of Madhya Pradesh and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOperationalisation of Auctioned Coal Blocks
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 467 · Asked on 2026-07-22
Ministry: COAL
Member asked
Ashok Kumar Rawat, Bhartruhari Mahtab, Bidyut Baran Mahato, K. Sudhakar, Rajpalsinh Jadav, Godam Nagesh, Sanjay Jaiswal, Shankar Lalwani, Pradeep Kumar Singh, Radheshyam Rathiya, Kripanath Mallah, Ananta Nayak, Ravi Kishan, Khagen Murmu, Aparajita Sarangi, Dineshbhai Makwana
(a) the progress made in the operationalisation of coal blocks auctioned for commercial mining along with the number of blocks that have commenced production and their present status in the country including Chhattisgarh and Odisha; (b) the production achieved from commercial coal mines during Financial Year 2025–26 and their contribution to the country’s overall domestic coal output in the country including Chhattisgarh and Odisha; (c) whether any coal blocks located in Keonjhar Lok Sabha Constituency of Odisha have been auctioned for commercial mining and if so, the details thereof including the status of production, employment generation and revenue accrued to the said State; (d) the steps taken by the Government to facilitate timely development of commercial coal mines through faster statutory clearances, land acquisition, rail connectivity and other infrastructure support; and (e) the measures taken by the Government to ensure sustainable mining and socio-economic development of local communities in mining-affected areas including Keonjhar Lok Sabha Constituency?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePrioritising States for Solar and Wind Energy Development
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 468 · Asked on 2026-07-22
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) whether any renewable energy capacity addition targets have been identified for Andhra Pradesh under the country's renewable energy expansion plans; (b) if so, the details thereof; (c) whether Andhra Pradesh has been identified as a priority State for solar and wind energy development; and (d) if so, the measures being taken by the Government to promote renewable energy deployment in the said State?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMobile Towers installed under 4G Saturation Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 469 · Asked on 2026-07-22
Ministry: COMMUNICATIONS
Member asked
(a) the total number of mobile towers installed under the 4G Saturation Scheme as of December 2025; (b) the State-wise details where rural and remote villages have been newly connected through these towers; and (c) the details of the progress made in expanding telecom services in Aspirational Districts under the Digital India initiative?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStudy on Potential of Agrivoltaics
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 47 · Asked on 2026-07-22
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) the total installed capacity of solar power plants in the country during the last five years, category-wise (ground-mounted, rooftop, agrivoltaics), State and district-wise for Andhra Pradesh; (b) whether the Government has studied the potential of innovative models like agrivoltaics to improve land-use efficiency and if so, the details of findings thereof; (c) whether the Government has developed or intends to develop official definitions and standards for agrivoltaics and integrated solar systems and if so, the details thereof; and (d) whether the Government proposes to launch a national-level research or deployment programme for agrivoltaics and if so, the details of funding, implementation timelines and expected outcomes particularly for high-potential States like Andhra Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source6G Alliance and Spectrum Roadmap for 6G
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 470 · Asked on 2026-07-22
Ministry: COMMUNICATIONS
Member asked
Balabhadra Majhi, Praveen Patel, Dineshbhai Makwana, Lumbaram Choudhary, Chandra Prakash Joshi, Naba Charan Majhi, Bidyut Baran Mahato
(a) the progress made since the constitution of the Bharat 6G Alliance, including its current membership, the Working Groups constituted and their key achievements; (b) the major recommendations of the "Spectrum Roadmap for 6G in India" and the extent to which these recommendations have been incorporated into the Department of Telecommunications' (DoT) roadmap for 6G spectrum; (c) the present status and timeline for the establishment of the 6G Terahertz Testbed at SAMEER, Kolkata and the plans to utilise the same for promoting 6G research, testing and future deployment, including in Nabarangpur Parliamentary Constituency, Odisha and SAMEER; and (d) the steps taken by the Government to translate India's accepted proposals in 3GPP and ITU into global 6G leadership and the measures proposed to ensure that the benefits of 6G technologies reach remote and aspirational regions, including Nabarangpur Parliamentary Constituency, Odisha?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDraft Floating Solar PV Potential Assessment Report
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 471 · Asked on 2026-07-22
Ministry: NEW AND RENEWABLE ENERGY
Member asked
Lumbaram Choudhary, Anurag Thakur, Avimanyu Sethi, Rodmal Nagar, Vijay Baghel, Bhartruhari Mahtab, Vishweshwar Hegde Kageri, Godam Nagesh, Hemant Savara, Suresh Kumar Kashyap
(a) the status and timeline for finalisation and notification of the draft Floating Solar PV (FSPV) Potential Assessment Report and the draft Floating Solar Policy prepared by the National Institute of Solar Energy (NISE) and Indian Institute of Technology (IIT) Roorkee; (b) the total floating solar potential identified across water bodies in the country under this assessment, State/UT-wise including Himachal Pradesh particularly for Shimla Lok Sabha Constituency and Madhya Pradesh; (c) whether the draft policy proposes a single-window clearance mechanism for floating solar projects involving multiple State departments and if so, the details thereof; and (d) whether any targets fixed for FSPV capacity addition by the year 2030 and if so, the details thereof including Himachal Pradesh particularly in Shimla Lok Sabha Constituency?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePM-SGMBY in Haryana
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 472 · Asked on 2026-07-22
Ministry: NEW AND RENEWABLE ENERGY
Member asked
Satpal Brahamchari, Jai Parkash
(a) whether the Government is providing financial assistance to domestic consumers for setting up of rooftop solar plants under the Pradhan Mantri-Surya Ghar Muft Bijli Yojana (PM-SGMBY) in the Sonipat and Hisar Lok Sabha Constituencies of Haryana; (b) if so, the details of applications received, approved, rooftop solar plants installed along with subsidy disbursed since the launch of the yojana in the Sonipat and Hisar Lok Sabha Constituencies; (c) whether the Government has encountered any problem in the implementation of yojana like lack of awareness, technical hurdles, delay in DISCOMs approval or other issues; and (d) if so, the steps taken by the Government to overcome these shortcomings and extend the benefits of the scheme to the maximum eligible families along with the details of the future action plan?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceReducing Import Dependency on Critical Minerals
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 473 · Asked on 2026-07-22
Ministry: MINES
Member asked
(a) the details of the current percentage of India's import dependence on critical minerals, including Lithium, Cobalt and Rare Earth Elements required for Electric Vehicles (EVs), electronics and other strategic sectors; (b) the present status of the implementation of the Critical Minerals Mission along with its key objectives, implementation timeline, budgetary allocation and targets for achieving self-reliance in the exploration, mining, processing and recycling of critical minerals; and (c) the details of bilateral agreements, strategic partnerships, overseas exploration projects and acquisition of mineral assets undertaken by the Government to secure a reliable supply chain of critical minerals for Indian manufacturers including the progress made and the expected outcomes of such initiatives?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSemiconductor Supply Chain
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 474 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
We have not ingested the asking members for this question.
(a) whether it is a fact that the Government is stepping up its bid to build a semiconductor supply chain with new project targets spanning chip fabrication, manufacturing and design under the Modified Programme for Development of Semiconductor and Display Manufacturing Ecosystem in the country; (b) if so, the details thereof; (c) the details of the target fixed/expected to get new employment generated and fresh investments; and (d) the time by which the commercial operation be expected to commence?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSatellite Communication Network (SCN)
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 475 · Asked on 2026-07-22
Ministry: COMMUNICATIONS
Member asked
(a) the progress made in finalising the Satellite Communication Network (SCN) Authorisation and spectrum assignment framework for satellite communication providers; (b) the number of Non-Geostationary Satellite Orbit (NGSO) operators, including Starlink, Jio Satellite, OneWeb and Amazon Kuiper, awaiting licences or spectrum pending this framework; (c) the status and timeline in finalising spectrum pricing and security clearance norms; and (d) the steps taken to align satellite broadband rollout with National Broadband Mission 2.0 targets?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceHowrah-Bally-Dankuni-Hooghly Corridor
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 476 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has undertaken or proposes to undertake capacity augmentation works on the Howrah-Bally-Dankuni-Hooghly corridor, including additional lines, yard remodelling and terminal infrastructure development and if so, the details thereof; (b) the present status of the Dankuni coaching terminal and freight handling expansion project including the expected date of commencement and completion of the works; (c) whether the Government has assessed the likely increase in suburban train frequency and freight handling capacity after completion of the ongoing and proposed projects on the corridor and if so, the details thereof; and (d) the details of funds allocated for railway infrastructure projects in the Howrah-Hooghly section of Eastern Railway during the financial years 2025-26 and 2026-27?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOfficial Complimentary Travel in Luxury Trains
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 477 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Government received any representation from Members of Parliament regarding unsatisfactory reply given by Railway Ministry to unstarred question number 4156 answered on 18.03.2026 and if so, the details thereof; and (b) the details of railway officials along with name, designation and class of travel who availed complimentary travel in luxury trains like Palace on Wheels, Maharajas' Express and Deccan Odyssey from 2014 to till date, year-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEmployment and Entrepreneurship in Renewable Energy Sector
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 478 · Asked on 2026-07-22
Ministry: NEW AND RENEWABLE ENERGY
Member asked
Magunta Sreenivasulu Reddy, Putta Mahesh Kumar
(a) the details of the initiatives taken by the Government to skill/re-skill youth for employment and entrepreneurship in the renewable energy sector including solar, wind, green hydrogen, energy storage and allied emerging technologies during the last five years; (b) the details of the total amount of funds allocated, released and utilised for such schemes/ initiatives for skilling youth in the renewable energy sector during the last five years, State and year-wise, especially in Andhra Pradesh; (c) the details of the total number of beneficiaries (male, female and others) trained and certified under such initiatives during the last five years across the country, State-wise especially in Andhra Pradesh; (d) whether the Government has undertaken any steps to raise awareness among youth, educational institutions, MSMEs and industry stakeholders regarding skilling in renewable energy sector in the country especially in Andhra Pradesh; and (e) if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source