Showing 1,951–1,975 / 34,220
Upgradation Work on NH-148
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2021 · Asked on 2026-07-30
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the current status of construction/upgradation of National Highway (NH)-148 and the total number of packages sanctioned under the project along with project-wise and section-wise details thereof; (b) the details of the number of packages for which tenders have been issued, awarded, packages where construction work has commenced, packages completed and those currently pending under the project, stage-wise; (c) the details of sanctioned cost, executing agency, stipulated completion period, physical and financial progress achieved so far and reasons for delay, if any, in respect of each package; (d) whether the Government proposes to implement a special action plan for time-bound completion of the remaining works on NH-148; and (e) if so, the details thereof and the estimated timeline for completion of the construction/upgradation work of the highway?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of PMAY-U
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2022 · Asked on 2026-07-30
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the number of houses completed under Pradhan Mantri Awas Yojana - Urban (PMAY-U) during each of the last five years along with the details of funds allocated, sanctioned, released and utilised, city-wise; (b) the number of such houses that have remained unoccupied or locked for more than one year after completion, city-wise; (c) the reasons cited by beneficiaries or Urban Local Bodies for non-occupation of such houses where surveyed and if so, the details thereof; and (d) the steps taken by the Government to ensure that completed houses are actually occupied by the intended beneficiaries?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceTender for Transportation by IOL for Kolkata-Haldia Port
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2023 · Asked on 2026-07-30
Ministry: PETROLEUM AND NATURAL GAS
Member asked
We have not ingested the asking members for this question.
(a) whether a tender was floated for transportation by Indian Oil Limited (IOL) through tanker trucks at Kolkata-Haldia Port under the Government, if so, the details thereof; (b) whether any complaint regarding irregularity in the registration of trucks in the tender was received, if so, the details thereof; (c) whether the registration of the tanker trucks was checked after the complaint was made, if so, the details thereof; and (d) whether the Letter of Engagement (LoE) was issued without checking the registration of the tanker trucks even though the tanker trucks were brought after the prescribed time-limit, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCapacity Enhancement in the Food Processing Sector
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2024 · Asked on 2026-07-30
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) whether the Government has reviewed the progress made in expansion of food processing capacity and promotion of value addition under various schemes of the Ministry and if so, the details thereof; (b) whether the Government maintains data on investments facilitated for establishment, expansion and modernisation of food processing units and if so, the details thereof, State-wise and district-wise particularly in Maharashtra including Jalgaon district; (c) whether the Government has undertaken measures to promote value-added food products, including millet-based products, fruit and vegetable processing and agro-processing industries in Maharashtra including Jalgaon district and if so, the details thereof; (d) whether the Government has assessed the employment generated and support extended to Micro, Small and Medium Enterprises (MSMEs), Farmer Producer Organisations (FPOs) and food processing enterprises under these initiatives and if so, the details thereof; and (e) whether the Government proposes to establish additional food processing infrastructure and value-addition facilities in Jalgaon Lok Sabha Constituency and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUjjwal DISCOM Assurance Yojana
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2025 · Asked on 2026-07-30
Ministry: POWER
Member asked
We have not ingested the asking members for this question.
(a) the details of the objectives of the Ujjwal DISCOM Assurance Yojana (UDAY); (b) whether the said yojana is mandatory for State Distribution Companies (DISCOMs) and if so, the details thereof; (c) whether annual hikes in domestic electricity consumption charges are mandatory and if so, the details thereof; (d) the details of the financial revival of DISCOMs since the implementation of UDAY, State-wise and year-wise; (e) whether any State Government or DISCOM has opted not to comply with the requirements of UDAY and if so, the details thereof including the financial consequences arising therefrom; and (f) whether all the States have adopted UDAY and if so, the details thereof and if not, the list of States that have not implemented the scheme?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFood Processing Projects sanctioned for Sultanpur
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2026 · Asked on 2026-07-30
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) the details of food processing projects sanctioned for Sultanpur district during the last five years; (b) the details of financial assistance released under Central Government schemes; and (c) the details of employment generated through such projects, project-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBenefits for STs in Union Territories
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2027 · Asked on 2026-07-30
Ministry: TRIBAL AFFAIRS
Member asked
(a) the Scheduled Tribes (ST) population as per Census 2011 in the Union Territories in the country and the latest estimated population therein along with the details of benefits being provided to ST communities in each UT, UT-wise; (b) whether the Government has identified members of tribal communities residing in the UT of Delhi for more than fifty years and whether the Government proposes to grant them Scheduled Tribes status and include them in the enumeration of Scheduled Tribes in the forthcoming Census and if so, the timeline thereof; (c) the existing provisions relating to reservation for Scheduled Tribes residing in the Union Territories in political institutions and administrative services; and (d) whether the Government proposes to provide reservation in political institutions and administrative services in the Union Territories on the basis of Scheduled Tribes population and if so, the details and the timeline thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConstruction of Highways under Bharatmala Pariyojana
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2028 · Asked on 2026-07-30
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
Rajesh Verma, Arun Bharti, Atul Garg
(a) whether the pace of highway construction under the Bharatmala Pariyojana has successfully transformed the nation's connectivity, drastically reducing travel times for common citizens; (b) if so, the access-controlled expressways and national highways successfully completed and opened to the public during the last two financial years particularly in Ghaziabad & Jamui, Samastipur, Rajahmundry and Khagaria Lok Sabha Constituencies; (c) whether this visionary infrastructure push has seamlessly connected isolated rural agricultural hubs to major urban markets, directly multiplying the daily incomes of ordinary small-scale farmers, if so, the details thereof; (d) the details of the massive direct and indirect employment opportunities successfully generated for millions of rural youth through these mega road construction projects; and (e) the future steps planned to build State-of-the-art wayside amenities, featuring affordable food courts and clean public washrooms, every fifty kilometers for the comfort of common travellers?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceIncreasing Demand for Affordable Housing
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2029 · Asked on 2026-07-30
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether the Government is aware that rapid urbanisation has resulted in increasing demand for affordable housing, basic civic amenities and sustainable urban infrastructure across the country; (b) if so, the details of the various schemes and programmes being implemented by the Government for providing affordable housing, improving urban infrastructure and ensuring better living conditions for urban citizens during the last five years; (c) the details of the funds allocated, sanctioned and utilised under such schemes, State-wise including Maharashtra; (d) whether the Government has assessed the shortage of affordable housing and gaps in urban infrastructure in smaller towns, aspirational districts and tribal-dominated areas and if so, the details thereof; and (e) the corrective measures being taken to address these challenges?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSetting up of Pumped Storage Projects in Madhya Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2030 · Asked on 2026-07-30
Ministry: POWER
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has made any assessment of the possibilities of setting up of Pumped Storage Projects (PSPs) in the Chhindwara district of Madhya Pradesh for the integration of renewable energy and management of peak electricity demand keeping in view its geographical suitability and if so, the details thereof; (b) whether any special positive steps are taken in collaboration with the private and public sectors to encourage the establishment of such projects to promote green energy through proper utilization of water resources in the district and if so, the details thereof; and (c) the budgetary or technical assistance being provided by the Government for the speedy implementation of proposed PSPs in the State including Chhindwara?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of PM-JANMAN
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2031 · Asked on 2026-07-30
Ministry: TRIBAL AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has implemented the Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM-JANMAN) for the socio-economic development of Particularly Vulnerable Tribal Groups (PVTGs) and if so, the objectives, eligibility criteria and major components thereof; (b) the details of PVTG habitations in the State of Odisha, along with the number of eligible and covered beneficiaries under PM-JANMAN, district-wise and block-wise; (c) the details of funds allocated, released and utilised under PM-JANMAN in Odisha since the launch of the Scheme along with the details of Central assistance provided to the State, district-wise; (d) the details of physical achievements under the Scheme in Odisha, including houses, roads, drinking water facilities, mobile connectivity, hostels and other infrastructure created for PVTGs, district-wise; and (e) whether the Government proposes to expand coverage to all eligible PVTG habitations in the State and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProgress Made under RDSS
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2032 · Asked on 2026-07-30
Ministry: POWER
Member asked
(a) the progress made under the Revamped Distribution Sector Scheme (RDSS) in reducing Aggregate Technical and Commercial (AT&C) losses across the country; (b) the targets fixed under the said scheme for reduction of AT&C losses and the current achievement levels, State-wise including Karnataka; (c) the funds sanctioned and released under RDSS to Karnataka for feeder separation, smart metering and infrastructure strengthening; and (d) the measurable impact of RDSS interventions on improving operational efficiency and financial sustainability of DISCOMs?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDomestic LPG Prices
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2033 · Asked on 2026-07-30
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) whether the Government has recently reduced the price of commercial LPG cylinders by about one hundred and eighty-three rupees per cylinder and has left domestic LPG refill prices unchanged, if so, the details thereof; (b) whether the international crude oil prices have declined to levels prevailing prior to the recent geopolitical conflict in West Asia; (c) if so, the quarter-wise details of crude oil prices at which India purchased crude oil from the international market during the last two years; and (d) whether the Government proposes to review domestic LPG prices in view of the easing of international crude oil prices, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceHousing Targets and Funds under PMAY-U
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2034 · Asked on 2026-07-30
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
Bharti Pardhi, Ravindra Waikar, Shrirang Barne
(a) the details of housing targets set and funds sanctioned for Maharashtra and Madhya Pradesh during the current financial year under Pradhan Mantri Awas Yojana - Urban (PMAY-U) keeping in view the acute housing shortage; (b) whether the Union Government proposes to grant any special concessions or land transfer approvals to the State Governments for redevelopment of slums situated on Railway, Port Trust or other Central Government lands in Maharashtra and Madhya Pradesh and if so, the details thereof; (c) the number of proposals pending with the Union Government for providing permanent housing to slum dwellers on Central lands in Maharashtra and Madhya Pradesh through the In-Situ Slum Redevelopment (ISSR) component under PMAY-U; (d) the details of any new Credit Linked Subsidy Scheme (CLSS) being implemented to provide interest subvention on home loans for Middle and Low-Income Group (MIG/LIG) families in Maharashtra and Madhya Pradesh; and (e) the specific policy guidelines issued by the Ministry to facilitate utilisation of Union Government lands for mega redevelopment projects?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAssessment of National Power Grid
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2035 · Asked on 2026-07-30
Ministry: POWER
Member asked
(a) whether the Government has undertaken any comprehensive assessment of the preparedness of the National Power Grid to meet the rapidly growing electricity demand arising from renewable energy integration, electric mobility, data centres and industrial expansion across the country and if so, the details thereof; (b) the details of transmission capacity augmentation, grid modernization, deployment of smart grid technologies, battery energy storage systems and cyber security measures initiated during the last three years, State-wise and project-wise; and (c) whether the Government proposes to formulate a long term National Grid Resilience Strategy to ensure uninterrupted, secure and affordable power supply while addressing climate-related risks, cyber threats and peak demand fluctuations and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePNG and CGD Network in Ratlam-Jhabua-Alirajpur
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2036 · Asked on 2026-07-30
Ministry: PETROLEUM AND NATURAL GAS
Member asked
We have not ingested the asking members for this question.
(a) whether any scheme has been formulated by the Government to provide Piped Natural Gas (PNG) to domestic and commercial consumers and to expand the City Gas Distribution (CGD) network in Jhabua and Alirajpur districts under Parliamentary Constituency No. 24 (Ratlam-Jhabua-Alirajpur), Madhya Pradesh; (b) if so, the names of the towns, cities and rural areas of the said Parliamentary Constituency included under the scheme along with the current progress of the project, district-wise; (c) the tentative timeline for laying gas pipelines, developing the necessary infrastructure and providing PNG connections to eligible consumers; and (d) whether any part of the said Parliamentary Constituency has not been included under the scheme so far, if so, the reasons therefor and the action being taken by the Government to include it under the said scheme at the earliest?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePili Dam Reservoir in Bijnor District
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2037 · Asked on 2026-07-30
Ministry: JAL SHAKTI
Member asked
(a) whether the Government is aware that thousands of farmers and around forty-six thousand bighas of agricultural land have been affected by irrigation crisis due to the drying up of the Pili Dam reservoir in Bijnor district of Uttar Pradesh and if so, the details thereof; (b) whether the Government has conducted any technical study on the causes of this situation such as lack of rainfall, climate change, siltation, water management or any other reasons and if so, the major findings thereof; (c) the permanent measures proposed by the Government with regard to reservoir recharge, de-silting, rainwater harvesting, alternative irrigation sources and water conservation to prevent recurrence of such a situation in future; and (d) the immediate and long-term steps being taken by the Government to provide time-bound irrigation facilities to the affected farmers?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRevival of Village and Cottage Industries
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2038 · Asked on 2026-07-30
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the total financial assistance provided to small businesses under the Prime Minister’s Employment Generation Programme (PMEGP) and other Credit schemes in Darjeeling and Kalimpong districts during the last five years; (b) the steps taken to upgrade the processing, packaging and marketing of local products, including orthodox tea, ginger, cardamom and traditional handicrafts; and (c) the steps being taken by the Ministry to revive and modernize traditional village and cottage industries in rural areas to prevent youth migration and generate sustainable local employment?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWork Orders for JJM in Sikar and Jhunjhunu Districts
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2039 · Asked on 2026-07-30
Ministry: JAL SHAKTI
Member asked
(a) the time by which the work orders under the Jal Jeevan Mission (JJM) for Sikar and Jhunjhunu districts are likely to be issued and the time by which the said works are likely to be completed; and (b) the details of the approvals accorded so far under JJM in Sikar district, the expected date of completion of the works, the number of works completed and the number of works remaining incomplete as on date along with the time by which the incomplete works are likely to be completed?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFinancial Assistance for Construction of Roads
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2040 · Asked on 2026-07-30
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether the Government has provided financial assistance to the State Governments particularly Maharashtra for the construction of inter-State bridges and roads of economic importance during the last three years; (b) if so, the details thereof, State-wise and year-wise; and (c) the names of the States to which financial assistance is proposed to be provided for this purpose during the current financial year?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEthanol Blending and its Production Cost
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2041 · Asked on 2026-07-30
Ministry: PETROLEUM AND NATURAL GAS
Member asked
We have not ingested the asking members for this question.
(a) whether the Union Government has taken serious note of the adverse effects of ethanol blending and the escalation in its cost, if so, the details thereof; and (b) whether it is true that the cost of production of one litre of petrol is lower than the cost of production of one litre of ethanol, if so, the details thereof along with the valid reasons for the Government to promote ethanol-blended petrol for vehicles and to adhere to the Ethanol Blended Petrol Programme?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFlights from Hisar Airport
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2042 · Asked on 2026-07-30
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government proposes to operate new flights under the UDAN Scheme to expand air connectivity from Hisar Airport/Aerodrome in Haryana to major cities in the country and if so, the details thereof; (b) the details of the flights currently operating and proposed from Hisar Airport along with their destinations and operational status; (c) the amount of the funds sanctioned and utilised so far under the UDAN Scheme for the development of Hisar Airport including expansion of passenger facilities, runway, terminal building and other essential infrastructure; and (d) whether the Government has prepared any special action plan to develop Hisar as a regional aviation hub and attract new airlines and if so, the details thereof and the likely timeline fixed in this regard?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFinancial Assistance for Maharashtra under SBM-U 2.0
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2043 · Asked on 2026-07-30
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether any financial assistance has been released to Municipal Corporations in Maharashtra including Malegaon Municipal Corporation under Swachh Bharat Mission - Urban 2.0 (SBM-U 2.0) and Fifteenth Finance Commission grants for solid waste management during the last three years, Corporation-wise; (b) whether the Government maintains data on per-tonne rates paid by Urban Local Bodies (ULBs) for waste collection, transportation and disposal in Maharashtra and if so, the details thereof; (c) whether the Government has received representations on irregularities in the solid waste contract awarded by Malegaon Municipal Corporation including inflated rates, non-procurement of vehicles, claiming of municipal vehicle repair costs, absence of weighbridge verification and non-payment of workers' wages and if so, the details thereof along with the action taken thereon; (d) whether guidelines exist for transparency and competitive rates in outsourced, Centrally-funded waste contracts and if so, the details thereof; and (e) whether the Government proposes to review Central fund utilisation for waste management by the Corporation, if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDeclining Groundwater Levels
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2044 · Asked on 2026-07-30
Ministry: JAL SHAKTI
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has conducted any assessment of the declining groundwater levels in various districts of the country and if so, the details thereof; and (b) whether any district-specific groundwater recharge plans have been prepared and if so, the details thereof, State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceChallenges faced by MSMEs
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2045 · Asked on 2026-07-30
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) whether the Government is aware that the powerloom and other Micro, Small and Medium Enterprises (MSMEs) are facing difficulties related to the availability of working capital and credit, outdated machinery and technology, high industrial electricity costs and GST compliance in Bhiwandi at Thane district of Maharashtra; (b) if so, the details of the aforesaid difficulties and the assessment of their impact on production, competitiveness and employment; (c) whether the Government has implemented any special scheme, provided financial assistance, technological upgradation, credit facility, skill development or other support measures to resolve these problems and if so, the details thereof; and (d) whether the Government is formulating any special action plan to enhance the competitiveness and address the grievances of powerloom and other MSME units in Bhiwandi and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.