Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 16,326–16,350 / 34,220
Technical Snags in Airlines
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3072 · Asked on 2025-08-07
Ministry: CIVIL AVIATION
Member asked
(a) the details of technical snags and failure of safe, efficient and reliable air services reported in the country during the last one year; (b) the steps being taken by the Government to ensure safe air journey in the country; (c) whether the Government has any mechanism to check the safety and security measures related to air journey and if so, the details thereof; and (d) the details of notices issued to various airline companies in this regard and the action taken to check recurrence of such types of air safety violations?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProgress of Projects under AMRUT 2.0 in Assam
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3073 · Asked on 2025-08-07
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the details of the physical progress of water supply and water body rejuvenation projects under the Atal Mission for Rejuvenation and Urban Transformation 2.0 (AMRUT 2.0) in Assam; (b) the details regarding the number of households in cities where sewerage and tap water connections are still pending under AMRUT 2.0 in Assam; (c) the details regarding the number of projects sanctioned and completed for stormwater drainage in Guwahati under AMRUT 2.0 along with the funds sanctioned and utilised for the same; and (d) the details of the number of projects in Assam under AMRUT Mitra along the number of women engaged for the same?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConstruction of NH-548C
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3074 · Asked on 2025-08-07
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the time limit stipulated for the completion of construction of NH-548C; (b) whether construction of the above highway including the stretch from Beed-Patna-Majalgaon 51-101 Km. was started in 2017 in Maharashtra and was targeted to be completed by 31st July, 2019 and if so, the reasons for the delay of six years in this regard; (c) the reasons for blocking the 600 metre road connecting the village on the above highway; (d) whether construction work between (i) Majalgaon to Kaij, (ii) Kaij and Kushlamb (160-220 Kms) particularly on Yermala and Kushlamb section as well as on Manjari bridge and (iii) two bridges near Sadola in Beed district is still lying incomplete, if so, the reasons therefor; (e) the amount incurred thereon so far along with the extra funds needed for the said works; (f) whether the Government has conducted any inquiry in this regard and if so, the details thereof and the punitive actions taken against the concerned contractor and responsible officers in this connection along with the details thereof; (g) whether the said incomplete work led to increase in road accidents and if so, the compensation provided to the next of kin of the person who died in such accidents; and (h) the steps taken by the Government to ensure completion of the said work as per declared quality standards and within stipulated time frame?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRising Prices of Domestic LPG Cylinders, Petrol and Diesel
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3075 · Asked on 2025-08-07
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) whether the Government is aware of the financial burden on common households due to the continuous rise in prices of domestic LPG cylinders, petrol and diesel and if so, the details thereof; (b) whether the Government is likely to consider placing in the public domain a detailed cost structure and pricing formula used to determine the retail prices of cooking gas, petrol and diesel, if so, the details thereof; (c) whether the increase in prices of petrol and diesel is directly linked to global crude oil rates, if so, the details thereof and if not, the other contributing factors; (d) whether the Government has a breakup of taxes levied by the Union and State Governments, dealer commission, transportation and profit margins included in the retail price of petrol, diesel and LPG and if so, the details thereof; and (e) whether the Government has reduced subsidies on domestic LPG cylinders during each of the last five years and the amount of subsidies disbursed and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAffordable and Accessible Air Travel
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3076 · Asked on 2025-08-07
Ministry: CIVIL AVIATION
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware of the challenges being faced in the civil aviation sector, particularly with regard to high airfares, lack of adequate air connectivity in tier-2 and tier-3 cities, delays in airport infrastructure development, financial stress being faced by airlines and issues related to passenger safety and convenience; (b) if so, the details thereof along with the steps being taken by the Government to promote affordable and accessible air travel, improve regional connectivity, expedite infrastructure development, ensure the financial health of airlines, enhance safety standards and improve passenger services across the country through various schemes and policy initiatives; and (c) if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of PMKSY
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3077 · Asked on 2025-08-07
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
We have not ingested the asking members for this question.
(a) the current status of the Pradhan Mantri Kisan Sampada Yojana (PMKSY) in terms of implementation and outcomes, State/UT-wise; and (b) the measures being taken by the Government to enhance the effectiveness of PMKSY in reducing post-harvest losses and improving food processing infrastructure across the country?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePublic Procurement from MSMEs
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3078 · Asked on 2025-08-07
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the norms prescribed for Public Procurement by Ministries/Departments/PSUs from MSMEs particularly from SC, ST and women entrepreneurs; (b) the details of Public Procurement made by Ministries/Departments/PSUs from MSMEs particularly SC, ST and women entrepreneurs during the last two financial years 2023-24 and 2024-25; (c) whether the action has been initiated against Officials responsible for non-adherence in fulfilling the norms applicable to Public Procurement from MSMEs including those led by SC, ST and women entrepreneurs, if so, the details thereof; (d) the details of Ministries/Departments/PSUs not fulfilling the norms for Public Procurement from MSMEs particularly SC, ST and women entrepreneurs; and (e) the mechanism to ensure adherence to norms for the Government procurement?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Rural Electrification
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3079 · Asked on 2025-08-07
Ministry: POWER
Member asked
(a) whether the Government has achieved 100% electrification of villages and households in the country and if so, the details thereof; (b) if not, the current status of rural electrification and the measures being taken to address the gaps; (c) the initiatives undertaken to promote renewable energy sources like solar and wind under various Central schemes; and (d) the progress made under the Revamped Distribution Sector Scheme (RDSS) for improving power distribution infrastructure and reducing losses?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSmall-Scale Manufacturers
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3080 · Asked on 2025-08-07
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) whether the Government has plans to provide subsidized machinery to Telangana’s small-scale manufacturers; (b) the details of export promotion schemes for Telangana’s MSMEs in the handicraft sector; and (c) the steps taken to facilitate digital marketing training for Telangana’s MSME entrepreneurs?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceReservation in Central Government Housing for Persons with Disabilities
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3081 · Asked on 2025-08-07
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the estimated number of beneficiaries expected to avail reservation annually in the allotment of Central Government Housing for Persons with Disabilities (Divyangjans) along with the percentage of this reservation, State/UT-wise; (b) whether any data has been compiled before the roll out of the policy and if so, the details thereof; (c) whether a State-wise implementation framework is being prepared by the Government and if so, the details thereof; (d) the estimated financial expenditure involved for upgrading/modifying infrastructure according to the guidelines of the Sugamya Bharat Abhiyan; and (e) the steps taken or being taken by the Government during the last few years to address the potentially pending cases under the Divyangjan quota in the country including Bihar?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNomination of Members of Delhi Golf Club
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3082 · Asked on 2025-08-07
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether it is a fact that the Government nominates persons to become permanent members of the Delhi Golf Club as per the Memorandum of Association/Articles of Association under the “Out of Turn” category; (b) the names of the persons and nominated since 2007 till date along with their status, year-wise; (c) the criteria and process as per Confirmation and Amendment Deed to nominate permanent members “Out of Turn” category along with the details of the relevant clause and classifications; and (d) whether any advertisement was issued as per the Confirmation and Amendment Deed for the nomination of “Out of Turn” members of Delhi Golf Club and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWater Crisis
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3083 · Asked on 2025-08-07
Ministry: JAL SHAKTI
Member asked
(a) whether the Government is aware about the water crisis emerging in several States of the country due to depleting groundwater level and inequality in water distribution; (b) if so, the details thereof along with the major schemes being run by the Government to deal with this crisis; and (c) whether the Government proposes to introduce an integrated national water policy in the future to resolve water distribution disputes among States and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Road Projects in Delhi
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3084 · Asked on 2025-08-07
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the key objectives behind the construction of the proposed five kilometer tunnel connecting Shiv Murti–Mahipalpur to Nelson Mandela Road in Vasant Kunj, South Delhi; (b) whether this tunnel aims to establish a fully signal-free corridor between South Delhi, Dwarka and Gurugram and if so, the anticipated benefits in terms of travel time and reduction in pollution; (c) whether this corridor is being integrated with major expressways such as the Dwarka Expressway and Urban Extension Road-II to enhance multi-directional urban connectivity, if so, the details thereof; (d) the measures being taken to ensure timely completion of the project while minimizing traffic disruption and air pollution during construction; and (e) the present status and estimated completion timeline of the Delhi–Dehradun Expressway (National Highway 709B)?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceArsenic-Free Piped Drinking Water in Nadia District
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3085 · Asked on 2025-08-07
Ministry: JAL SHAKTI
Member asked
(a) whether the Government is aware that several areas under Ranaghat Lok Sabha Constituency in West Bengal, particularly Hanskhali and Krishnaganj in Nadia district are severely affected by arsenic contamination in groundwater; (b) if so, the details thereof along with the steps taken by the Government under the Jal Jeevan Mission and the National Water Quality Sub-Mission (NWQSM) to ensure piped supply of arsenic-free potable water to all households in these affected areas; (c) the number of villages in Hanskhali and Krishnaganj currently connected to piped drinking water supply with arsenic-free sources and the number of villages yet to be covered; (d) the timeline set for achieving hundred percent coverage of safe, piped drinking water supply in these arsenic-affected regions; and (e) whether any special financial allocation or technical intervention has been planned for this region considering its acute water quality crisis and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImpact of MSME Schemes
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3086 · Asked on 2025-08-07
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
Omprakash Rajenimbalkar, Sanjay Deshmukh, Arvind Sawant, Bharti Pardhi, Shrirang Barne
(a) the latest assessment of the MSME sector’s contribution to GDP, employment generation and total exports; (b) the comparative analysis of these contributions with the targets set for the sector and the specific steps being taken to increase it further, particularly towards the goal of a five trillion dollar economy; (c) the specific impact of MSME schemes such as the Prime Minister's Employment Generation Programme and the Scheme of Fund for Regeneration of Traditional Industries on job creation and entrepreneurship in rural, semi-urban, industrially backward regions and aspirational districts of the country particularly in Maharashtra and Madhya Pradesh; (d) whether there are disaggregated figures available for employment generated for youth, women, Scheduled Castes, Scheduled Tribes and other marginalised groups; and (e) if so, the details thereof, State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEstablishment of New EMRS
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3087 · Asked on 2025-08-07
Ministry: TRIBAL AFFAIRS
Member asked
(a) the total number of Eklavya Model Residential Schools (EMRS) functioning in the country before 2014; and (b) the number of new EMRSs sanctioned by the Government since 2014 till date and the number of schools out of them under construction and functioning at present?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCashless Treatment for Road Accident Victims
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3088 · Asked on 2025-08-07
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
Pratap Chandra Sarangi, Rajesh Chudasama, Aparajita Sarangi, Vishnu Dayal Ram, Amar Kale, Suresh Kumar Kashyap, Shivmangal Singh Tomar, Vijay Kumar Dubey
(a) the current status of implementation of the cashless treatment scheme for road accident victims across all the States and Union Territories; (b) the manner in which this scheme aligns with the broader objectives of the Ayushman Bharat Pradhan Mantri-Jan Arogya Yojana (AB PM-JAY) in providing trauma care; and (c) the budget allocation and funding mechanism for cashless treatment of road accident victims for the current and next fiscal year?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCentre Median Plantations on NHs
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3089 · Asked on 2025-08-07
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware that Centre Median Plantations on National Highways (NHs) are a critical component of road safety design as they reduce headlight glare and visibility of oncoming traffic especially during night driving and if so, the details thereof; (b) whether the median plantations are absent or poorly maintained on many NH stretches across the country including in Tamil Nadu defeating the purpose of median safety and if so, the reasons therefor; (c) whether the Government has issued any guidelines or instructions to the National Highways Authority of India and concessionaires to ensure proper design, planting and maintenance of centre median greenery and if so, the details thereof; and (d) whether there is a proposal to revive or implement uniform median greening in all 6-lane/4-lane NHs across the country to enhance visual comfort and reduce accident risk and if so, the beautification efforts undertaken in this regard?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceElectrification under DDUGJY and RDSS in Karbi Anglong
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3090 · Asked on 2025-08-07
Ministry: POWER
Member asked
(a) the number of villages in Karbi Anglong and Dima Hasao that have been electrified under Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY) and the Revamped Distribution Sector Scheme (RDSS); (b) whether 100% household electrification has been achieved in these districts and if so, the details thereof; (c) the status of smart/prepaid metering in these rural and tribal areas; and (d) the steps being taken by the Government to ensure metered, reliable electricity supply in hilly terrain?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCentral Schemes to Strengthen MSMEs
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3091 · Asked on 2025-08-07
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) whether the Union Government has any targeted central schemes or incentives being offered to further strengthen the large MSME ecosystem in Tamil Nadu and if so, the details thereof; (b) whether considering that 70% of Tamil Nadu’s MSMEs are in the services sector and nearly 55% of the urban workforce in the State is engaged in services, significantly higher than the national average, any specific policy interventions are being planned by the Government to support service-oriented MSMEs in areas such as trade, motor vehicle repair, education, ICT and financial services and if so, the details thereof; (c) whether there are any centrally sponsored credit facilitation, digitalisation, market linkage, skilling or technology upgradation initiatives specifically tailored for MSMEs in Tamil Nadu's tier-2 and tier-3 cities, where a large proportion of informal MSMEs are concentrated and if so, the details thereof; and (d) whether the Government has conducted any studies or consultations with Tamil Nadu-based MSME associations to understand barriers to growth and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEmployment Generation through MSME Units
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3092 · Asked on 2025-08-07
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the number of employment opportunities created through MSME units in Telangana during the last five years; (b) the estimated jobs generated by MSMEs in Nalgonda Lok Sabha Constituency during the same period; (c) whether the Government maintains district-wise employment records and if not, whether such tracking mechanisms are likely to be introduced; and (d) the steps being taken to increase MSME-led job creation in backward districts like Nalgonda through targeted policies and incentives?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNHs in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3093 · Asked on 2025-08-07
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the details of existing and under construction National Highways(NHs) in Maharashtra, district-wise especially in Mumbai; (b) whether several NH projects in Maharashtra have not been completed within the stipulated time and if so, the details thereof; (c) whether timelines were fixed for the completion of the NHs that were announced during the last five years, if so, the details thereof; (d) the number of such highways on which construction work of flyovers and underpasses is currently underway; (e) the number of such highways where bridge works are incomplete; (f) the reasons for delay in the construction of NHs/flyovers/underpasses; and (g) the punitive action taken against the concerned contractors or responsible officials in this regard?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceVillages Deprived of Drinking Water
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3094 · Asked on 2025-08-07
Ministry: JAL SHAKTI
Member asked
(a) whether it is a fact that many villages in the country are still deprived of drinking water and are dependent on water tankers which transport water from far-off places; (b) if so, the details thereof; (c) whether the Government has formulated any scheme and provided funds to provide drinking water to every citizen in the country; and (d) if so, the details thereof and the time-frame by which this scheme is likely to be fully implemented across the country?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDamages to New Roads, Bridges and Expressways
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3095 · Asked on 2025-08-07
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
Adoor Prakash, Benny Behanan, K. C. Venugopal, Namdeo Kirsan
(a) whether the Government is aware of recent incidents of damage to newly constructed roads, bridges and expressways due to rains, if so, the details thereof; (b) the number of such infrastructure failures reported during the last three years, project-wise and State-wise and the reasons identified for these failure; (c) whether any action has been taken against the contractors or agencies responsible including blacklisting or penalties, if so, the details thereof; (d) the steps taken by the Government to ensure better construction quality, drainage design and climate resilience in future highway projects; (e) whether the Government has conducted any inquiry into the collapse of several stretches on the National Highway-66 being constructed in Kerala, if so, the details thereof and the action taken against the defaulters; and (f) the details of measures taken by the Government to avoid such issues in construction of National Highways?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSupport to Bat Manufacturers
unstarredLOK SABHA · 18th Lok Sabha · Session 5 · Question no. 3096 · Asked on 2025-08-07
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) whether any financial or technical support has been extended to MSMEs involved in bat manufacturing to establish their own willow plantations and if so, the details thereof; and (b) whether the Government is considering incentivising local farmers to grow willow trees by offering subsidies or assured procurement and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.