Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 11,276–11,300 / 34,220
Improvement in Functioning of Akashvani and Doordarshan
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2791 · Asked on 2025-12-17
Ministry: INFORMATION AND BROADCASTING
Member asked
We have not ingested the asking members for this question.
(a) the details of action taken by the Government to improve the functioning and competitiveness of Akashvani and Doordarshan in view of the strong competition posed by private broadcasters; (b) the details of measures implemented by the Government to enhance the popularity of Doordarshan’s programmes, boost the Television Rating Points (TRP) ratings of its channels and increase advertising revenue; (c) the steps taken by the Government to adopt and upgrade new technologies and equipment at Akashvani and Doordarshan stations across the country; and (d) the total revenue generated by the Gonverment by Akashvani and Doordarshan from the Private Advertisement segment during the last three years along with the details of initiatives undertaken to further increase income from such Advertisements?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePM-SGMBY in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2792 · Asked on 2025-12-17
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) the progress of Pradhan Mantri- Surya Ghar Muft Bijlee Yojana (PM-SGMBY) particularly in the State of Andhra Pradesh; (b) whether it is true that out of the target of one crore households so far only sixteen lakh households have been benefited under the said Yojana; (c) if so, the details thereof, State-wise with a particular reference to Andhra Pradesh; (d) the measures taken by the Government to speed up the rooftop solar installations under the said Yojana; and (e) the steps taken by the Government to create awareness about the Yojana in the country including Andhra Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceJiyo Parsi Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2793 · Asked on 2025-12-17
Ministry: MINORITY AFFAIRS
Member asked
(a) the current population trend of the Parsi community in the country and whether any recent demographic assessment has been undertaken in connection with the Jiyo Parsi Scheme and if so, the details thereof; (b) whether the Government has conducted any evaluation or impact study of the Jiyo Parsi Scheme since its launch; (c) if so, the key findings regarding its effectiveness in reversing or stabilising population decline; (d) the details of major components and eligibility criteria under the scheme including the income limit prescribed for availing benefits under the medical assistance component; (e) the details of financial and physical achievements under the Jiyo Parsi Scheme during the last five years, including the number of beneficiaries supported and the total expenditure incurred; and (f) whether the Government proposes to expand or revise the scheme in view of demographic trends and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceReduction in PMGKAY
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2794 · Asked on 2025-12-17
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether the allocation under the Pradhan Mantri Garib Kalyan Anna Yojana (PM-GKAY) has been reduced; (b) if so, the total number of beneficiaries covered under the said scheme across the country, State-wise; (c) if not, the respective date up to which the said scheme has been extended; and (d) the details of the funds being spent under the said scheme, year-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceResponse to Official Communications by Member of Parliament
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2795 · Asked on 2025-12-17
Ministry: PERSONNEL, PUBLIC GRIEVANCES AND PENSIONS
Member asked
(a) the details of the expected timeline or mandated period within which Government authorities are required to reply to an official communication from a Member of Parliament (such as, response is expected within 30, 60, or 90 days) for Zila Parishad, Municipalities, departments under the State Government and Ministries under the Union Government ; and (b) the norms, rules or procedures governing coordination and communication between Government departments and Lok Sabha Members of Parliament?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSolar Plants in Rajasthan
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2796 · Asked on 2025-12-17
Ministry: NEW AND RENEWABLE ENERGY
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware of the status of use of new and renewable energy including solar power plants and biogas units in rural areas in Bharatpur district of Rajasthan; (b) if so, the details of steps taken to promote sustainable energy; (c) the details of increasing renewable energy capacity addition in the said district; and (d) if not, the reasons for lacking of renewable energy development in the said district?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMobile & Internet Infrastructure - Darjeeling & Kalimpong Districts
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2797 · Asked on 2025-12-17
Ministry: COMMUNICATIONS
Member asked
(a) the details of telecom infrastructure works completed or sanctioned since 2019 (towers, fibre kms, BharatNet, PM-WANI) in Darjeeling and Kalimpong districts; (b) the number of USOF-funded towers sanctioned/installed in each district since 2019; and (c) the timeline and plan for achieving full 5G coverage in these districts?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceROBs/RUBs/Railway Infrastructure Projects in Punjab
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2798 · Asked on 2025-12-17
Ministry: RAILWAYS
Member asked
(a) the details of all proposed Road Over Bridges (ROBs), Road Under Bridges (RUBs) and other related railway infrastructure development projects planned/approved in the State of Punjab; (b) the current status of each project proposed, sanctioned, under construction, completed along with expected timelines for commencement and completion; (c) whether any new ROB/RUB proposals have been received from the Government of Punjab/local authorities during the last three years and if so, the action taken thereon; (d) the total estimated expenditure for these projects and the share of funding between the Railways and the State Government; and (e) the steps taken/being taken by the Government to expedite critical infrastructure works in Punjab to enhance public safety and improve road/rail connectivity?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCoEs under Critical Mineral Mission
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2799 · Asked on 2025-12-17
Ministry: MINES
Member asked
Putta Mahesh Kumar, Magunta Sreenivasulu Reddy
(a) the details of the list of Centres of Excellence (CoEs) proposed, under construction and presently functional across the country, State-wise; (b) the details of the total number of individuals part of such CoE’s over the last five years across the country, CoE-wise; (c) the details of the total number of research initiatives proposed, under consideration and presently implemented in each CoE; (d) the details of the total amount of funding allocated, released and utilised during the last five years, CoE-wise; and (e) whether the Government has any plans of expanding the number of CoE’s in the country and if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAkashwani Kendras in the Country
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2800 · Asked on 2025-12-17
Ministry: INFORMATION AND BROADCASTING
Member asked
(a) the details of Akashwani Kendras established acorss the country at present, State-wise; (b) the details of Akashwani Kendras currently established across the country producing and broadcasting original programme, State-wise; (c) whether the Government is aware that at present several Akashwani Kendras are relaying programmes of other Akashwani Kendras instead of broadcasting original programme; (d) if so, the details thereof along with the reasons therefor; (e) the reasons for relaying of progammes of other Akashwani Kendras from Akashwani Kendras established five years ago in Bhilwara and Udaipur districts of Rajasthan; and (f) whether the Government has any plan to produce and broadcast original programmes of Bhilwara and Udaipur Akashwani Kendras and if so, the time limit fixed in this regard?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcee-Auction Norms of Selling Coal
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2801 · Asked on 2025-12-17
Ministry: COAL
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has changed the e-auction norms of selling coal during the last five years; (b) if so, the reasons for such changes; (c) whether the changes have facilitated participation of more buyers and more income to the Government; and (d) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePrice Reporting Centres
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2802 · Asked on 2025-12-17
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
We have not ingested the asking members for this question.
(a) the objectives of the Price Reporting Centres (PRCs) under the Price Monitoring Division; (b) whether these objectives have been achieved as per the targets; (c) if so, the details thereof and if not, the reasons therefor; (d) the details of the number of price reporting centres in the Country; (e) whether it is a fact that some States do not even have one price reporting centre, if so, the details thereof and the steps taken by the Government to address this; and (f) the time when the PRCs were last surveyed and expanded by the Government?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBaggage Regulations for Train Passengers
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2803 · Asked on 2025-12-17
Ministry: RAILWAYS
Member asked
(a) whether it is true that Railways is going to implement strict baggage regulations for train passengers on the lines of practice being followed at airport; (b) if so, the details thereof; (c) the details of the action will be taken by Railways if there are no scanning machines at railways stations; (d) whether there is any proposal to increase/decrease the permissible luggage in the new arrangement; and (e) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceIndia's Incentive Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2804 · Asked on 2025-12-17
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
We have not ingested the asking members for this question.
(a) whether India’s incentive programme is one of the most generous initiatives in the world in addition to the 50 per cent incentive from the Centre and some States have provided a top-up incentive through their respective policies and therefore, 75 per cent of the cost of setting up a unit is subsidised and remaining would be committed under the India Semiconductor Mission programme and States are seeking more funds from the Union Government to take forward projects; and (b) if so, the details along with its present status thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExpansion of Green Hydrogen Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2805 · Asked on 2025-12-17
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) whether the Government proposes to expand green hydrogen, offshore wind and storage linked renewable energy projects at large scale across the country and if so, the details thereof; (b) whether Tamil Nadu being one of the leading States in renewable energy production has been identified for the establishment of green hydrogen hubs, offshore wind farms or energy storage facilities and if so, the details thereof; (c) whether any proposals or feasibility studies have been undertaken in Tiruvannamalai and Kanchipuram districts for such green hydrogen or renewable energy storage projects and if so, the current status of these initiatives thereof; and (d) whether the Government has set any timelines or performance milestones for the completion and scaling up of such projects and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEstablishment of Quantum Fabrication and Central Facilities
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2806 · Asked on 2025-12-17
Ministry: SCIENCE AND TECHNOLOGY
Member asked
(a) whether the Government has announced the establishment of state-of-the-art Quantum Fabrication and Central Facilities at IIT Bombay, IISc Bengaluru, IIT Kanpur and IIT Delhi under the National Quantum Mission (NQM); (b) if so, the details thereof along with the aims and objectives of establishing the said facilities at these centres; (c) the total expenditure likely to be incurred on the establishment of these facilities; (d) the time by which these projects are likely to be completed and become operational in the country; (e) the manner in which this initiative is expected to boost India’s quantum research ecosystem and support startups, industry partners and academic institutions; and (f) whether the Government proposes to collaborate with international research bodies, private sector entities or other IITs/central institutions under this project and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment Work under MPLAD Funds
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2807 · Asked on 2025-12-17
Ministry: STATISTICS AND PROGRAMME IMPLEMENTATION
Member asked
(a) the details with regard to the time frame for issuing of various sanctions to the works by the local administration in the wake of the developmental works recommended by the Members of Parliament under the Members of Parliament Local Area Development Scheme (MPLAD) funds; (b) whether the Government is aware of the inordinate delay in issuing of sanctions to these development works by the local administration; (c) if so, the details thereof along with the action taken against the guilty officers in order to check the inordinate delays; (d) whether the Government has any plan to assess the loss of Government revenue due to inordinate delays in development works to be undertaken under the MPLAD funds; and (e) if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceLinking of Railway Line from Devgarh Madariya to Bilara
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2808 · Asked on 2025-12-17
Ministry: RAILWAYS
Member asked
(a) whether any proposal is under consideration with the Government for linking Devgarh Madariya via Baar (Haripur) to Bilara so that without land acquisition in the wildlife sanctuary area and the complexities of the mountainous ghat section, direct railway connectivity between Udaipur and Jodhpur may be re-established after 28 years and Rajsamand, Nathdwara and Jaitaran may also be directly connected with major metropolitan cities of the country and if so, the details thereof; and (b) whether any proposal regarding this link railway line has been sent to the Government by the North Western Railway and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFinancial Assistance for Bio-Energy Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2809 · Asked on 2025-12-17
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) whether the Government is granting financial assistance under Bio-Energy Programme and if so, the details thereof; (b) whether the guidelines have been notified for the development of bio-energy projects in the country; (c) if so, the details of steps taken by the Government for the development of bio-energy in the country during the last ten years; and (d) the details of new bio-energy projects installed during the last ten years in the country, State-wise particularly in the State of Karnataka and the steps proposed to promote the new projects?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOperational Status of e-Sankhyiki Portal
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2810 · Asked on 2025-12-17
Ministry: STATISTICS AND PROGRAMME IMPLEMENTATION
Member asked
(a) the current volume and categories of statistical datasets hosted on the e-Sankhyiki portal as on date, including the number of Ministries and Departments that have integrated their data with the platform; (b) whether any assessment has been undertaken regarding the usage of the portal including the number of registered users, Application Programming Interface ( API) calls made and dataset downloads or views and if so, the details thereof; (c) the extent to which the portal has been integrated with external platforms such as the National Data and Analytics Platform (NDAP); and (d) whether any gaps have been identified in standardisation or compliance and if so, the corrective measures taken thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConversion of ITIs and Polytechnics into Data Labs
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2811 · Asked on 2025-12-17
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
Kesineni Sivanath, Lavu Sri Krishna Devarayalu
(a) whether the Union Government has approved converting the nominated ITIs and Polytechnics in Andhra Pradesh into Data Labs and if so, the details thereof; (b) the steps being taken by the Government to expedite the approval and operationalisation of these Data Labs in the State; (c) the number of startups from Andhra Pradesh that have received financial assistance under the IndiaAI Innovation and Startups pillar during the last five years, district and year-wise; and (d) the number of startups, researchers, academic institutions and State agencies in Andhra Pradesh that have accessed AI compute services through the IndiaAI Cloud Portal since its inception, district and year-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProduction Linked Incentive (PLI) Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2812 · Asked on 2025-12-17
Ministry: COMMUNICATIONS
Member asked
Omprakash Rajenimbalkar, Sanjay Jadhav
(a) the details of the Production Linked Incentive (PLI) Scheme for telecom and networking products in the country: (b) whether the PLI Scheme for telecom and networking products has generated employment opportunities in the State of Maharashtra and if so, the details of direct and indirect employment generated in the State; (c) the details of employment generated particularly in the rural areas under the said Scheme; and (d) whether the Government proposes to extend PLI support for fibre optic cable and 5G component manufacturing in the State of Maharashtra and if so, the role of the State Government in providing industrial land and infrastructure for these projects?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDigital India Service Centre
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2813 · Asked on 2025-12-17
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) whether GPS-enabled Digital India Service Center (DISC) mobile vans have been deployed to deliver digital, financial and e-Governance services in remote and difficult-terrain States such as Himachal Pradesh and if so, the details thereof including the details of number of centres running across the country; (b) the details of services offered through these vans including Aadhaar enrolment, banking, tele-law, telemedicine, digital literacy, education support and e-commerce facilitation; (c) whether these vans are equipped with virtual reality (VR) and interactive digital tools for awareness campaigns on Digital India initiatives and if so, the details thereof; (d) whether procurement of such vans is mandatorily through the Government e-Marketplace (GeM) portal and the process for State departments and private individuals to apply and if so, the details thereof; and (e) whether the Government provides Capital Expenditure (CapEx) or Operational Expenditure (OpEx) financial assistance to CSC e-Governance Services India Limited, State agencies and private individuals for implementing these vans and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConsumer Price Index
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2814 · Asked on 2025-12-17
Ministry: STATISTICS AND PROGRAMME IMPLEMENTATION
Member asked
We have not ingested the asking members for this question.
(a) whether it is true that the Government has floated a discussion paper and invited views from experts, academicians, Government bodies, State Governments, financial institutions and other stakeholders on treatment of items distributed free of cost through Public Distribution System (PDS) in the Consumer Price Index (CPI) compilation framework and if so, the details thereof; (b) the details of response/views received from experts, academicians, Government bodies, States Governments, financial institutions and other stakeholders as on date; (c) whether it is also true that the Government is currently undertaking a revision of the CPI and also kicked off the exercise to revise the CPI base year from 2012 to 2024; and (d) if so, the details thereof along with the timeline to revise the CPI likely to be completed?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConsumer Awareness and “Manak Mahotsav”
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2815 · Asked on 2025-12-17
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) the details of campaigns on consumer awareness and standardization conducted by Bureau of Indian Standards (BIS) during the last two years in the Country, State-wise including Jharkhand; (b) whether “Manak Mahotsav” and “Manak Manthan” programmes were organised in various states including Jharkhand; (c) if so, the objectives and results achieved under the said programmes; (d) whether the Government proposes to institutionalise these programmes on an annual basis to ensure wider reach; and (e) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.