Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 11,226–11,250 / 34,220
Amrit Bharat Station Scheme
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 241 · Asked on 2025-12-17
Ministry: RAILWAYS
Member asked
Godam Nagesh, Naba Charan Majhi
(a) the details of the stations approved under the Amrit Bharat Station Scheme (ABSS) till date, State-wise particularly in the States of Jammu & Kashmir and Jharkhand and in the Shahdol and Sidhi Lok Sabha Constituencies; (b) the total expenditure incurred so far under ABSS and the estimated budgetary requirement for completion of the projects related to all the approved stations; (c) the details of the master plans formulated for the said stations and the major updates/changes incorporated to the said plan during the year 2024-25; (d) the details of the number of the stations where physical work has been started, completed and are in pre-construction stage, status-wise; (e) whether the redevelopment under ABSS is likely to increase passenger handling capacity, commercial revenue and local employment and if so, the expected quantitative outcomes thereof; (f) the number of stations selected/covered under the said scheme in Sidhi Lok Sabha Constituency; and (g) the time by which the said work is likely to be completed in the said Constituencies along with the status of work?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Stoppages for Improving Accessibility
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 242 · Asked on 2025-12-17
Ministry: RAILWAYS
Member asked
(a) whether the Government is providing additional stoppages on public demand and operational feasibility with a view to improve accessibility and make journeys easier for travellers; (b) if so, the details thereof; (c) whether the Government has received proposals to provide train halts at Boisar and other stations of Palghar Lok Sabha Constituency for express and superfast trains; (d) if so, the current status of these proposals; and (e) the timeline for approval and implementation of said proposals?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCoal Gasification and Coal-to-Chemical Projects
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 243 · Asked on 2025-12-17
Ministry: COAL
Member asked
Konda Vishweshwar Reddy, Anil Firojiya
(a) the details of the current status of ongoing and proposed coal gasification and coal-to-chemical projects in the country along with the expected timeline for commissioning of the same; (b) the total coal quantity allocated so far under the Coal Gasification Allocation Policy in the country particularly in Chhattisgarh along with the extent to which the same has translated into actual project progress; (c) whether the Government has finalised incentives or feasibility support mechanisms to accelerate the adoption of gasification technologies and if so, the details thereof; (d) the estimated contribution of the coal gasification programme in reducing import dependence on petrochemicals, methanol, ammonia and other industrial feedstocks; and (e) whether there is any proposal for coal gasification in Singrauli and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBharat Telecom 2025
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 244 · Asked on 2025-12-17
Ministry: COMMUNICATIONS
Member asked
(a) the core objectives and expected outcomes of Bharat Telecom 2025; (b) the achievements made in the field of digital infrastructure in rural areas and at national level since May 2014; and (c) the nature and scope of international participation under Bharat Telecom 2025?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProgress of First Mile Connectivity Projects
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 245 · Asked on 2025-12-17
Ministry: COAL
Member asked
Khagen Murmu, Kamaljeet Sehrawat
(a) the current progress of the First Mile Connectivity (FMC) projects being implemented by Coal India Limited (CIL), Singareni Collieries Company Limited (SCCL) and Neyveli Lignite Corporation India Limited (NLCIL), project-wise along with the details of completion status; (b) the quantum of coal presently transported through mechanised, eco-friendly FMC systems as compared to the Ministry’s target; (c) the number of FMC projects that have faced delays along with the reasons and the revised timelines for completion; (d) whether the Government has undertaken any third-party assessments to evaluate the impact of FMC systems on logistics efficiency, dust reduction and cost competitiveness; and (e) if so, the details of key findings thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceTrain Accidents in Southern Railway Zone
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 246 · Asked on 2025-12-17
Ministry: RAILWAYS
Member asked
(a) whether there has been increase in the number of train accidents in the Southern Railway zone particularly in Tamil Nadu during the last three years; (b) if so, the details of such accidents including the number of casualties, causes and affected routes; (c) the reasons identified for these accidents (e.g. human error, infrastructure failure, signal malfunction etc.); (d) whether the Government has taken cognizance of the delay in the implementation of the Kavach train protection system in Tamil Nadu and nearby railway zones and if so, the details thereof; and (e) the reasons for the delay and the timeline by which Kavach is expected to be fully implemented in the said zone?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProjects under Pradhan Mantri Jan Vikas Karyakram
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 247 · Asked on 2025-12-17
Ministry: MINORITY AFFAIRS
Member asked
(a) the details of expenditure and budget allocation under the Pradhan Mantri Jan Vikas Karyakram (PMJVK) during the last five years, year and State/UT-wise, particularly for Uttar Pradesh; (b) the details of projects approved, completed and under implementation under PMJVK during the last five years, State/UT-wise and category/sector-wise; (c) the number of minority concentration areas covered under PMJVK, district-wise; (d) whether any proposal has been received to expand the coverage of PMJVK and if so, the details thererof; (e) the criteria used for selection of projects and districts along with any recent changes made by the Government in the guidelines of PMJVK; and (f) the number of proposals pending with State Government of Uttar Pradesh particularly in Saharanpur Commissionrate along with the reasons therefor and the details of steps taken to expediate the proposal clearance from State level committee?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceElectronic Manufacturing Clusters in Pune
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 248 · Asked on 2025-12-17
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) whether the Government has formulated a specific plan under the Modified Electronics Manufacturing Cluster (EMC 2.0) Scheme or any other initiative to establish dedicated Electronics Manufacturing Clusters in Pune district; (b) if so, the details thereof including proposed locations, the total land identified, estimated investment and expected timelines for approval and development; (c) the role of the State Government of Maharashtra in providing land, infrastructure, common facility centres and plug-and-play support for units in the proposed clusters; (d) whether any applications from Maharashtra have been approved or are under consideration under EMC 2.0; (e) the details of anticipated employment generation, number of units likely to be attracted and potential contribution of the Pune cluster to domestic manufacturing and exports; and (f) whether additional electronics clusters are planned in other regions of Maharashtra under ongoing schemes and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceElectrification of Broad Gauge Railway Network
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 249 · Asked on 2025-12-17
Ministry: RAILWAYS
Member asked
(a) the total length of electrification of the broad-gauge network as on date, division, zone and State-wise particularly in Bihar, Jharkhand, Rajasthan, Chhattisgarh and Tamil Nadu; (b) the names of States/UTs and Railway Zones that have achieved 100 percent electrification and those yet to achieve the same, division, zone and State/UT-wise; (c) the pace of electrification achieved during the Financial Years 2023-24 and 2024-25 in terms of route-kilometer electrified per year and the targets for Financial Year 2025-26, division, zone and State/UT-wise particularly for Pali Lok Sabha Constituency in Rajasthan; (d) whether electrification works in the North-Eastern States have been completed or are still ongoing; (e) if so, the updated progress and expected completion timelines; (f) the details of the latest official source/official report on electrification e.g. Railway Board/Central Organization for Railway Electrification, zone-wise; (g) whether the Government has evaluated the potential reduction in carbon emissions and diesel consumption upon full electrification of Tamil Nadu's railway network and if so, the details thereof including the estimated annual savings in fuel and emissions; and (h) whether any steps have been taken to enhance train speed and haulage capacity in Tamil Nadu's fully electrified sections to optimise the benefits of electrification and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRail Kaushal Vikas Yojana
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 250 · Asked on 2025-12-17
Ministry: RAILWAYS
Member asked
(a) the details of the number of training centers in Uttar Pradesh under the Rail Kaushal Vikas Yojana launched by the Union Government; (b) the number of youth in Saharanpur made self-reliant by providing them technical training under the above yojana; and (c) the details of the locations wherein All India level short term training programmes for youth in Uttar Pradesh have been organised under the Rail Kaushal Vikas Yojana?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNuclear Power Plants and Projects in the Country
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 251 · Asked on 2025-12-17
Ministry: ATOMIC ENERGY
Member asked
(a) the current number and details of nuclear power plants in the country along with gross capacity and the maximum dependable power generation or maximum continuous capacity; (b) the number and details of the nuclear power plants under construction and initiatives taken to promote research and development of Nuclear Small Modular Reactors (SMRs); (c) the details of private partnerships, if any, under the Nuclear Energy Mission; (d) the details of partnerships with foreign countries, if any, under the Nuclear Energy Mission along with the role of National Thermal Power Corporation (NTPC) in expanding nuclear power capacity in the country; and (e) the details of collaboration between NTPC and Nuclear Power Corporation of India Limited (NPCIL)?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExploration of Coal Bed Methane
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 252 · Asked on 2025-12-17
Ministry: COAL
Member asked
(a) whether it is true that with the fifth-largest reserves of coal globally India holds significant prospects for exploration and production of Coal Bed Methane (CBM) in over twelve States; (b) if so, the steps being taken by the Government to harness coal bed methane in the country; and (c) the future of the industry after the introduction of exploration and development of unconventional hydrocarbons under the 2018 framework of the Coal Bed Methane Policy, 1997?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceKey Minerals Identified by GSI in Meghalaya
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 253 · Asked on 2025-12-17
Ministry: MINES
Member asked
We have not ingested the asking members for this question.
(a) whether the Geological Survey of India (GSI) has completed mineral mapping of Meghalaya State and if so, the details thereof along with the key mineral resources identified; and (b) the details of the measures taken by the Government to promote sustainable and scientific mining practices in the State?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of PM-SGMBY in Karnataka
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 254 · Asked on 2025-12-17
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) the progress made in the implementation of the Pradhan Mantri Surya Ghar Muft Bijli Yojana (PM-SGMBY) in Karnataka with particular focus on urban centers like Mysuru and rural outreach in Kodagu district; (b) the financial and technical support provided to households, MSMEs and public institutions under the programme during the current year; and (c) the details of impact of these efforts on reducing electricity bills, promoting clean energy adoption and achieving energy security goals at the State level?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWater Logging due to RUBs in Tirupati Lok Sabha Constituency
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 255 · Asked on 2025-12-17
Ministry: RAILWAYS
Member asked
(a) whether the Government is aware that the existing Road Under Bridges (RUBs), especially in Tirupati Lok Sabha Constituency are leading to frequent water logging even during light to moderate rainfall, making them hazardous for pedestrians, vehicles and animals; (b) if so, the details of the specific locations where such engineering failures have been reported; (c) the immediate measures taken/proposed to be taken by the Government to mitigate water stagnation in these existing RUBs, including drainage redesign/pump installation; (d) whether the Government has conducted a technical audit/review of the design flaws causing this issue and if so, the details thereof; (e) the steps incorporated/being incorporated in the planning and execution of new RUBs to avoid such water logging issues in the future and whether any accountability has been fixed for flawed designs and if so, the details thereof; and (f) whether coordination with local municipal bodies is ensured for integrated drainage planning in and around RUB projects and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceROBs /FOBs in Hassan District in Karnataka
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 256 · Asked on 2025-12-17
Ministry: RAILWAYS
Member asked
(a) the number of Road Over Bridges (ROBs) and Foot Over Bridges (FOBs) currently existing in Hassan district, Karnataka, station-wise; (b) the details of ROBs and FOBs sanctioned for the district during the last five years including sanctioned cost, present status and timelines for their completion; (c) whether any new proposals for construction/upgradation of ROBs/FOBs in Hassan district have been received by the Government and if so, the details thereof; (d) the details of funds allocated, released and utilised for ROB/FOB works in the district during the last five years; and (e) the steps taken/being taken by the Government to improve passenger and road safety through additional ROB/FOB infrastructure in the region?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSatellite-based Weather & Disaster Forecasting Systems
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 257 · Asked on 2025-12-17
Ministry: EARTH SCIENCES
Member asked
(a) whether the Government plans to expand satellite-linked early warning systems and flood-forecasting networks for coastal districts and if so, the details thereof, district-wise particularly Kasaragod district of Kerala; (b) the initiatives taken by the Government to upgrade India Meteorological Department (IMD) forecasting stations and Doppler radar coverage in North Kerala; and (c) the timeline for commissioning new systems and the projected benefits for disaster-prone coastal communities?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment of Superconducting Qubit Chips
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 258 · Asked on 2025-12-17
Ministry: SCIENCE AND TECHNOLOGY
Member asked
(a) whether the Government has initiated collaborative programmes with semiconductor R&D labs and quantum startups to develop superconducting qubit chips, silicon spin qubits and photonic quantum circuits in the country and if so, the details thereof; (b) whether any projects or outreach have been extended to institutions in Bihar and if so, the details thereof; (c) whether semi-cryogenic or dilution refrigeration labs have been commissioned with Indian Institute of Science (IISc), Tata Institute of Fundamental Research (TIFR) or Indian Institute of Technology (IITs) to test sub-50 mK operational environments and if so, the details thereof; (d) the number of Indian patents or preprints filed in quantum error correction, Quantum Key Distribution (QKD) and post-quantum cryptography; and (e) whether a national quantum cloud infrastructure is being built and if any access is being provided to startups and MSMEs including those in Bihar for algorithm prototyping and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Halt at Village Kharakram Ji in Haryana
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 259 · Asked on 2025-12-17
Ministry: RAILWAYS
Member asked
(a) whether any proposal to provide railway halt at village Kharakram ji on the Sonipat-Jind railway line is under consideration with the Government and if so, the details thereof; (b) whether the local public representatives and villagers have submitted written demands and survey reports in this regard and if so, the details thereof; (c) whether the Government has conducted any survey regarding passengers footfall, geotechnical conditions and feasibility at the said location and if so, the details thereof; and (d) whether the Government proposes to grant early approval to the said proposal and to start the construction work to provide better transport facilities to the local residents of the said area and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOffshore Wind Energy Potential in Karnataka
starredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 260 · Asked on 2025-12-17
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) whether any feasibility surveys or wind resource assessments have been conducted along the Karnataka coast, particularly in Dakshina Kannada district since 2020 to evaluate offshore wind potential and if so, the details thereof and if not, the reasons therefor; (b) whether any projects have been sanctioned or private developers shortlisted for setting up offshore wind farms off Dakshina Kannada district and if so, the details thereof; (c) whether any funds have been allocated for environment and geophysical impact studies, seabed bathymetry mapping and associated transmission infrastructure in the district and if so, the details of quantum of funds and utilization status thereof; and (d) whether there is a strategic plan for designating Dakshina Kannada district as a regional hub for offshore wind energy generation aligned with national targets towards the year 2032 and if so, the details of roadmap thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSmart Hill Towns
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2761 · Asked on 2025-12-17
Ministry: PLANNING
Member asked
(a) whether the Government is aware of the fact that there is continuous migration from the hilly districts of Uttarakhand due to lack of development, employment opportunities and basic amenities and if so, the details thereof; (b) whether the Government has approved any plan recently to develop new cities or "Smart Hill Towns'' with modern facilities in hilly areas and if so, the details thereof along with the major components and proposed locations; (c) whether special provisions are being made in these new cities for health, education, roads, transport, digital connectivity, tourism and local employment generation so as to check migration effectively; and (d) the details of provisions made regarding financial allocation, implementation timeline and monitoring mechanism for the development of these new cities with the cooperation of the State Government?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceChallenges in Signing PPAs for Renewable Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2762 · Asked on 2025-12-17
Ministry: NEW AND RENEWABLE ENERGY
Member asked
Shrirang Barne, Bharti Pardhi, Ravindra Waikar, Naresh Mhaske, Shrikant Shinde
(a) the details of the challenges faced in signing Power Purchase Agreements (PPAs) for renewable projects along with the steps taken by the Government to address them; (b) the manner in which direct Power Purchase Agreements between renewable developers and agencies like National Hydroelectric Power Corporation (NHPC), National Thermal Power Corporation (NTPC) and Solar Energy Corporation of India (SECI) would help accelerate capacity addition; (c) the target set for country’s non-fossil fuel installed power capacity by the year 2030 and the manner in which these Power Purchase Agreement strategy would contribute to it; (d) the details of Government and private stakeholders involved in implementing this procurement framework; and (e) the manner in which this approach ensures grid reliability and promotes cleaner energy sources?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInclusion of Nuclear Energy
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2763 · Asked on 2025-12-17
Ministry: ATOMIC ENERGY
Member asked
We have not ingested the asking members for this question.
(a) the manner in which the inclusion of nuclear energy in country’s energy mix is expected to strengthen long-term energy security; and (b) the manner in which nuclear energy is likely to contribute to achieving India’s Net Zero target by 2070?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUnemployment Allowance in Rajasthan
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2764 · Asked on 2025-12-17
Ministry: PLANNING
Member asked
(a) the total number of beneficiaries under the Unemployment Allowance and Mukhyamantri Rojgar Srijan Yojana in Rajasthan; (b) the number of youth benefited under this scheme in Karauli and Dholpur districts; (c) the main reasons for rejection of applications in these districts; (d) whether the Central and State Governments are likely to jointly implement a simplified registration and verification process for youth in these districts and if so, the details thereof; (e) the details of the process for restarting unemployment allowance for beneficiaries whose unemployment allowance has been discontinued due to lack of information and the timeline thereof; and (f) the details of such people whose allowances has been reinstated, district-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMoisture Content in Paddy
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 2765 · Asked on 2025-12-17
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
We have not ingested the asking members for this question.
(a) the details of the policy relating to the moisture content at the time of procurement of paddy from farmers; (b) the details of the policy decision on the percentage of moisture content from the year 2014 till the current year along with details of the moisture content in paddy during procurement since 2014, State-wise; (c) whether the Government has issued any temporary relaxation of paddy procurement moisture norms for example permitting procurement above the standard 14 percent moisture in response to this season's extreme rains and cyclones; (d) if so, the exact revised moisture threshold(s), the period of validity and the States/districts where the relaxation applies; (e) the measures being taken by the Government to safeguard grain quality, provide storage/transport assistance and prevent distress sales by affected farmers; (f) whether the Government proposes any compensation, incentive or market-support package for farmers whose produce is adversely affected by excess moisture and the timelines for implementation; (g) whether the Government had constituted and dispatched three teams and visited the rain-affected districts inspecting the harvested crops and collecting paddy samples from DPCs and farmlands in Tamil Nadu, if so, the details thereof and the action taken by the Union Government in this regard; and (h) whether it is true that the Union Government has deputed a team of senior officials to Cuddalore district, Tamil Nadu to physically measure moisture levels and assess damage and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.