Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 11,076–11,100 / 34,220
Development of Hydropower Potential
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3071 · Asked on 2025-12-18
Ministry: POWER
Member asked
(a) whether the Government has launched any scheme to support the development of hydropower potential in Chhattisgarh, Bihar and North-Eastern States; (b) if so, the details thereof; and (c) whether the said scheme is likely to facilitate investment and create significant direct employment opportunities for local people and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Safety Standards in Long Distance Bus Travel
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3072 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether the Government has taken note of increasing safety concerns in long distance and inter-State bus travel particularly arising from unauthorised structural modifications, installation of unapproved sleeper berths and non-compliance with certified vehicle designs; (b) whether any steps are being taken by the Government to strengthen enforcement mechanisms including Central Motor Vehicle Rules to prevent such re-modification of buses after registration; (c) whether the Government proposes to mandate real-time tracking and monitoring of safety critical features such as speed governors, emergency exits, GPS location and driving behaviour through integrated systems for buses; (d) whether the Government proposes to establish a national framework for AI-based surveillance to detect and curb unauthorized structural modifications such as converting seating coaches into sleeper coaches by private operators and if so, the details thereof; (e) if not, the reasons therefor and the steps being taken to ensure passenger safety, accountability and regulatory compliance across all highway transport operations; (f) whether the Government proposes to ask manufacturers to install standardised safety features in all long distance buses at the production stage such as certified sleeper layouts, factory fitted speed caps, fire suppression systems and rollover protection; and (g) if so, the details thereof and if not, whether the Government plans to examine such measures in light of recent bus accident trends?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDrinking Water to Slum Clusters under 'Nal Se Jal' Initiative of JJM
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3073 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
Kriti Devi Debbarman, Rahul Lodhi, Tejasvi Surya
(a) whether the Government maintains data regarding slum clusters across the country and if so, the details thereof, State-wise; (b) whether the Government has any plans to ensure the availability of drinking water in slum clusters under the ‘Nal Se Jal’ initiative of Jal Jeevan Mission (JJM); (c) if so, the details thereof; (d) the steps taken/proposed to be taken by the Government to achieve this objective; and (e) the measures taken/being taken by the Government to ensure the supply of safe drinking water?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProgress made under PMAY-U
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3074 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the details of the progress made in achieving the housing construction targets under the Pradhan Mantri Awas Yojana – Urban (PMAY-U) in the country; (b) the number of housing units completed and handed over to beneficiaries till date, State-wise/UT-wise including the Union Territory of Dadra & Nagar Haveli; (c) the status of fund utilisation under the Scheme during the last five years and the current year till date, year and State/UT-wise; and (d) the steps taken by the Government to make urban housing projects affordable and sustainable?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOutstanding Debt and Payables of DISCOMs
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3075 · Asked on 2025-12-18
Ministry: POWER
Member asked
(a) the details of the total outstanding debt and payables of Distribution Companies (DISCOMs) as of 30.10.25; (b) the details of the Ujwal DISCOM Assurance Yojana (UDAY) goals along with the status of viability, DISCOM-wise; (c) the number of DISCOMs met UDAY targets for loss reduction; and (d) the measures being taken by the Government to reduce DISCOMs losses and gaps between revenues and costs?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWaste Collection and Source Segregation under SBM-U 2.0
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3076 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
Rajesh Verma, Lata Wankhede, Atul Garg
(a) the details of the progress on achieving hundred per cent door-to-door waste collection and source segregation under Swachh Bharat Mission-Urban (SBM-U) 2.0, State-wise; (b) the total quantum of legacy waste (in million tonnes) remediated and the amount still present at dumpsites, State-wise; (c) the number of Waste-to-Energy and bio-methanation plants currently operational and under construction; (d) the steps being taken to formalise the informal waste-picker (Safai Mitra) ecosystem and integrate them into the formal waste management chain; and (e) the measures in place to enforce Extended Producer Responsibility for plastic waste and e-waste in urban areas?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInstalled Power Capacity
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3077 · Asked on 2025-12-18
Ministry: POWER
Member asked
Dileshwar Kamait, Babu Singh Kushwaha, Rao Rajendra Singh, Sanjay Jaiswal, Chandra Prakash Joshi
(a) the composition of the present installed power capacity in the country including the share of renewable and non-fossil energy sources; (b) the factors that have contributed to achieve installed power capacity exceeding 500 GW along with the impact thereof on the goals under COP-26, Panchamrit Goals and India's commitments under the long-term energy transition roadmap; (c) the steps being taken to diversify India's energy portfolio through clean and safe sources such as nuclear energy; and (d) the manner in which the expansion and addition of nuclear energy is likely to strengthen long-term energy security of the country and contribute to achieve the Net-Zero 2070 target?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSecond Airport for Bengaluru
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3078 · Asked on 2025-12-18
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government has received any proposal for a second airport for Bengaluru city or for reopening Hindustan Aeronautics Limited (HAL) Airport for commercial passenger operations and if so, the details thereof; (b) whether any feasibility study, safety assessment or traffic study has been conducted in this regard by the Airports Authority of India (AAI), the Directorate General of Civil Aviation (DGCA) or any other agency and if so, the details and findings thereof; (c) the procedure and criteria followed by the Government for approving a second airport in a city including distance norms, traffic thresholds and contractual conditions; and (d) whether the reopening of HAL Airport or developing a second airport would require any modification of the existing concession agreement with Kempegowda International Airport and if so, the details thereof along with the compensation proposed to its operator?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceIntegration of Logistic Infrastructure at Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3079 · Asked on 2025-12-18
Ministry: CIVIL AVIATION
Member asked
Praniti Shinde, Gowaal Kagada Padavi
(a) whether the Government has assessed the impact of inadequate aviation connectivity and logistics infrastructure on industrial job migration from Maharashtra, particularly in districts like Nandurbar, Solapur and Sangli and if so, the details thereof; (b) the steps being taken to ensure that the Navi Mumbai International Airport (NMIA) is integrated with Maharashtra’s major industrial and export clusters including Solapur, Sangli and Nandurbar; (c) whether any time-bound plan has been formulated for developing regional air cargo terminals, last-mile logistics corridors and feeder routes connecting Maharashtra’s tier-2 cities to NMIA and if so, the details thereof; and (d) the measures being adopted to align central aviation investments with State-level industrial growth and employment generation targets?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSolar Based Water Schemes
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3080 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
Bhojraj Nag, Ravi Kishan, Aparajita Sarangi, Dulu Mahato, Kamaljeet Sehrawat, Naba Charan Majhi, Manish Jaiswal, Shankar Lalwani, Rajkumar Chahar
(a) the measures taken/being taken by the Government for the successful implementation of solar-based water schemes; (b) whether the Government has a list of villages facing acute shortage of drinking water despite having approved households and if so, the details thereof; and (c) the initiatives taken/likely to be taken by the Government to provide a reserve system or immediate service for solar energy pumps in a situation where construction of houses is at halt due to non-availability of drinking water?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Operational Verticals of PMAY-U
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3081 · Asked on 2025-12-18
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether all verticals of the Pradhan Mantri Awas Yojana - Urban (PMAY-U) including Beneficiary-Led Construction (BLC), Affordable Housing in Partnership (AHP) and Credit-Linked Subsidy Scheme (CLSS) are currently operational and accepting new applications and if so, the details thereof; (b) the present status of pending and ongoing housing projects sanctioned under PMAY during each of the last five years including the number of houses completed and those yet to be completed, State-wise; (c) whether the Government proposes to reopen or expand the acceptance of new applications under any vertical of PMAY-U in the future and if so, the details thereof; and (d) whether applications made during the periods when the submissions were temporarily closed would be considered at the time of reopening the scheme and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Schemes in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3082 · Asked on 2025-12-18
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the details regarding the list of central sector schemes, programmes and initiatives undertaken by the Government for supporting growth, development and innovation in the country during the last ten years; (b) the details regarding the total number of applicants, registrations and beneficiaries of above specified schemes across Andhra Pradesh, district-wise and especially from Prakasam District; (c) the details regarding the total amount of funding allocated, released and utilised for above specified schemes during the last five years in Andhra Pradesh, district-wise and especially in Prakasam District; (d) whether the Government has undertaken any study to identify potential bottlenecks being faced in the implementation of the schemes in Andhra Pradesh, if so, the details thereof and the steps undertaken to address the same, district-wise including in Prakasam District; and (e) the details regarding the list of Micro, Small and Medium Enterprises (MSMEs) infrastructure projects proposed, under construction and presently functional in Andhra Pradesh, district-wise including in Prakasam District?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceScientists in Central Ground Water Board
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3083 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
(a) the number of scientists currently employed at the Central Ground Water Board (CGWB) office in Jaipur, the sanctioned strength and the reasons for existing vacancies; (b) the current status of groundwater resources in Barmer and Rajasthan including levels of depletion, areas identified as critical and measures being implemented to address these challenges; (c) the infrastructure deficiencies faced by CGWB scientists in Jaipur including the availability of vehicles for fieldwork and necessary equipment and the steps being taken to resolve these issues; and (d) whether the Government has undertaken any recent studies or assessments on groundwater contamination in Rajasthan and if so, the key findings thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDam Rehabilitation, Safety Audits and Implementation of DRIP
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3084 · Asked on 2025-12-18
Ministry: JAL SHAKTI
Member asked
Jugal Kishore, Vishweshwar Hegde Kageri, Mala Rajya Laxmi Shah, Sunil Tatkare
(a) the present status of projects under the Dam Rehabilitation and Improvement Project (DRIP) Phases I, II and III including the number of dams covered and the progress made so far, State-wise including UT of Jammu and Kashmir; (b) whether the Government has identified any dams that are structurally weak, ageing or high-risk, if so, the details thereof; (c) whether the remedial measures proposed for such dams have been finalised, if so, the details thereof and; (d) the present status of the State Dam Safety Organisations (SDSOs) and State Committees for Dam Safety constituted under the Dam Safety Act and the States and Union Territories where these bodies are yet to be fully operationalised; and (e) whether the Government proposes any additional support mechanism for rehabilitation of old or distressed dams, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment of Kishanganj Airport
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3085 · Asked on 2025-12-18
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government has proposed or approved an airport in Kishanganj district of Bihar under the Regional Connectivity Scheme-UDAN; (b) if so, the details thereof including the stage of approval, land identification and timelines for project initiation; (c) whether any feasibility study, site inspection or technical assessment has been carried out for establishing an airport in Kishanganj and if so, the findings thereof; (d) the total funds sanctioned, released and utilised so far for the development of airports and heliports in Bihar under the UDAN scheme, district-wise; and (e) whether the Government proposes to expedite the development of an airport at Kishanganj in view of its strategic location near the Bengal border and increasing passenger demand and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAdherence to Electrical Safety Standards
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3086 · Asked on 2025-12-18
Ministry: POWER
Member asked
(a) whether the Government is aware that inadequate adherence to electrical safety standards at many locations in the Sonipat Lok Sabha Constituencies poses a risk of accidents and electrical hazards and if so, the details thereof; (b) whether the Government has formulated any plan to identify, replace or upgrade overloaded transformers, worn-out wires, exposed electric poles and low-tension lines in the said area and if so, the details thereof; (c) whether the Electrical Inspectorate has recently conducted any safety audits, inspections or awareness campaigns in the Sonipat; and (d) if so, the details of the steps taken to strengthen electrical safety, prevent accidents, install modern safety equipment and educate consumers about safe use of electricity?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWomen Participation in Transport and Logistics Sector
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3087 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether the Government is taking steps to enhance women’s participation and employment opportunities in the transport and logistics sector, in view of the sector’s rapid expansion and potential for inclusive growth; (b) if so, the major initiatives undertaken by the Government to encourage women’s training, skilling and entrepreneurship in areas such as electric mobility, logistics parks and transport management; (c) whether the Government proposes to strengthen gender-responsive policies, workplace safety measures and awareness programmes to promote greater inclusion of women in this sector, if so, the details thereof; and (d) the manner in which the Government is collaborating with State Governments, industry bodies and civil society organisations to ensure sustained progress in women’s participation across various branches of transport and logistics?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBeneficiaries Enrolled under PMUY
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3088 · Asked on 2025-12-18
Ministry: PETROLEUM AND NATURAL GAS
Member asked
Shafi Parambil, K. Radhakrishnan
(a) the total number of beneficiaries enrolled under the Pradhan Mantri Ujjwala Yojana (PMUY) during the last five years and as on 31st August 2025, year-wise and State/UT-wise; (b) the total number of people who actually received benefits under the Pradhan Mantri Ujjwala Yojana during the last five years including the number of free LPG connections distributed, year-wise and State/UT-wise; (c) the average number of LPG cylinder refills per beneficiary under PMUY during the last five years and as on 31st August 2025, year-wise and State/UT-wise; (d) whether the Government has assessed the number of PMUY beneficiaries who regularly refill LPG cylinders including those who did not refill cylinders or refilled only one cylinder during the last three years, if so, the details thereof, year-wise and State/UT-wise; (e) the total number of domestic LPG consumers who have opted out of the LPG subsidy during the last five years, year-wise and State/UT-wise; and (f) whether the Government proposes to take measures to improve sustained LPG usage among PMUY beneficiaries and review the subsidy framework in view of increasing LPG prices, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePM-Vishwakarma Yojana in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3089 · Asked on 2025-12-18
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
We have not ingested the asking members for this question.
(a) the current status of implementation of PM-Vishwakarma Yojana in Konaseema district of Andhra Pradesh; (b) the number of beneficiaries registered and enrolled under the Scheme in Konaseema district till date, trade-wise; (c) the number and details of training centres sanctioned under the Scheme in Konaseema district, including their locations, implementing agencies and trades for which training is being provided; (d) whether any of these training centres are currently operational, if so, the details thereof and the number of artisans undergoing training at each centre; (e) whether the Government has received/approved any proposals for establishing additional training centres under the Scheme in Konaseema district, if so, the details thereof; (f) the number of beneficiaries who have received skill training, certification, toolkit distribution and financial assistance under the Scheme in Konaseema district; and (g) the funds sanctioned, released, utilised under the Scheme during the last three years in Konaseema district of Andhra Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAppointment of a Permanent Chairman to the Coir Board
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3090 · Asked on 2025-12-18
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) whether the Government is aware that the Coir Board has been functioning without a Board & permanent Chairman, Secretary and other senior officials for a considerable period, if so, the details thereof; (b) whether the Government has examined the impact of this leadership vacuum on the functioning of the Coir Board and the overall performance of the Coir industry, if so, the details thereof; (c) whether the absence of a permanent Chairman has affected timely decision-making, implementation of schemes and the Board’s ability to support and promote the Coir sector, if so, the details thereof; (d) whether the Government has taken note of the steady decline in the Coir industry, which has historically been an important source of rural employment and export earnings, if so, the details thereof; and (e) the steps being taken by the Government to urgently appoint a permanent Chairman to the Coir Board and restore strong and stable leadership to revive the industry?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBreach of Airline Safety Procedures
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3091 · Asked on 2025-12-18
Ministry: CIVIL AVIATION
Member asked
(a) the number of cases of breach of safety procedures by airline operators reported during the last year; (b) the details of the cases of flight engine failures reported during the last year along with the action taken by the Government in this regard; (c) the details of the initiatives taken by the Government to ensure that procedures for safety of passengers are followed at all times; and (d) the details of pending and paid compensation to passengers or their families on account of breach of safety procedures by operators during the last year?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceElectricity Generated from Fossil Fuels and other Sources
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3092 · Asked on 2025-12-18
Ministry: POWER
Member asked
(a) the present energy mix of the country in terms of installed power capacity, with a detailed breakup of electricity generated from fossil fuels, renewable energy sources and other non-fossil fuel-based sources in the country including Maharashtra; (b) the major power projects, across all sectors that are currently sanctioned or under implementation and the manner in which the national energy mix is projected to evolve during the next five years; (c) the steps taken by the Government to expand hydropower and nuclear power generation and the role envisaged for these sectors in strengthening grid stability and ensuring long-term energy security; and (d) whether the Government is examining the feasibility of developing new hydropower assets in coordination with river-linking initiatives proposed under the National Perspective Plan and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBattery Energy Storage System
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3093 · Asked on 2025-12-18
Ministry: POWER
Member asked
(a) the concrete steps that have been taken by the Government so far to develop and deploy energy-storage technology to handle the intermittency of renewable energy and maintain grid stability; (b) whether the Government is contemplating adopting best practices from countries with high renewable-energy share such as Battery Energy Storage Systems (BESS), pumped-hydro storage and advanced grid-management systems in India’s energy-transition strategy, if so, the details thereof; and (c) whether any proposal exists to release a national action-plan or roadmap to increase energy-storage capacity, reduce costs and deploy large-scale storage infrastructure in the upcoming years, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceTransparency in Bidding process of NHAI
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3094 · Asked on 2025-12-18
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
Hemang Joshi, Tapir Gao, Manish Jaiswal, Rajesh Mishra
(a) the rationale behind the decision of the National Highways Authority of India (NHAI) to publicly disclose the details of National Highways projects that are currently under the bidding process; (b) the nature of information being made available with respect to project length, capital cost, approvals and progress of land acquisition; (c) whether the Government proposes to extend similar transparency measures to other stages of project planning and execution and if so, the details thereof; and (d) the number and details of such cases pending in the Sidhi Parliamentary Constituency?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInstallation of Firefighting and Emergency Response Systems at all Petrol Pumps
unstarredLOK SABHA · 18th Lok Sabha · Session 6 · Question no. 3095 · Asked on 2025-12-18
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) whether the Ministry has assessed the current status of firefighting and emergency response systems installed at all petrol pumps both new and existing, particularly those located in rural villages, border areas and near refineries across the Amritsar district and other border belts across the country, if so, the details thereof, State/UT-wise; (b) whether the Ministry along with concerned Departments proposes to conduct risk assessments and mock drills in these high-risk zones, if so, the details thereof; (c) whether emergency preparedness protocols are being implemented to address fire outbreaks or chemical hazards, if so, the details thereof; (d) whether petrol pumps and refineries are adequately equipped with modern automatic firefighting systems, trained personnel, fire sensors and preventive monitoring mechanisms, if so, the details thereof; and (e) the steps taken by the Ministry to ensure the safety of civilians and property in the event of explosions or any such mishaps?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.