JJM in Rajasthan
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 119 · Asked on 2026-01-29
Ministry: JAL SHAKTI
Member asked
(a) the salient features of the Jal Jeevan Mission (JJM); (b) the number of districts covered under JJM in Rajasthan including Jaipur; (c) the number of households in Rajasthan including in Jaipur that have been provided with new tap water connections under JJM; (d) whether the Government has conducted any survey in Jaipur where there is acute shortage of drinking water and if so, the details thereof along with the steps taken/being taken by the Government in this regard; and (e) whether the Government has sanctioned any funds to Rajasthan under JJM during the current year and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNSSH Scheme in Andhra Pradesh
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 12 · Asked on 2026-01-29
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
B. K. Parthasarathi, Lavu Sri Krishna Devarayalu
(a) the total number of applications received and approved under the National Scheduled Caste and Scheduled Tribe Hub (NSSH) Scheme in Andhra Pradesh during the last five financial years, year and district-wise; (b) the number and percentage of total male and female beneficiaries under various components of the above scheme in Andhra Pradesh, particularly under the Special Credit Linked Capital Subsidy Scheme (SCLCSS), district and year-wise; (c) the total amount of subsidies sanctioned and disbursed to SC/ST entrepreneurs in Andhra Pradesh under different sub-schemes of NSSH, component and year-wise; (d) whether the Government has taken any special measures to increase women’s participation under the NSSH scheme in Andhra Pradesh; and (e) if so, the details thereof and the steps being taken to enhance awareness and outreach of the scheme among SC/ST women entrepreneurs in the State?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUrban Solid Waste Management in Kerala
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 12 · Asked on 2026-01-29
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether urban local bodies in Kasaragod district of Kerala are facing serious challenges in implementing scientific solid waste management due to land constraints and funding limitations and if so, the details thereof; (b) the details of financial, technical and capacity-building assistance extended to municipalities in Kerala under the Swachh Bharat Mission-Urban; (c) whether any special support has been provided to coastal and border municipalities and if so, the details thereof; and (d) the steps taken by the Government to promote decentralised and sustainable solid waste management solutions in towns of northern Kerala?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOperational Status of SPM-NIWAS, Joka
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 120 · Asked on 2026-01-29
Ministry: JAL SHAKTI
Member asked
(a) whether the Dr. Syama Prasad Mookerjee National Institute of Water and Sanitation (SPM-NIWAS), set up at Joka, Kolkata with an investment of nearly Rs. 100 crore, has so far commenced the promised Master’s and Post-Doctoral programmes and if so, the details thereof; (b) whether the institute’s R&D laboratory has received NABL accreditation as originally envisaged and if so, the details thereof; (c) whether the Technology and Solutions Bank and the Digital Academy have been fully operationalised for public access and if so, the details thereof; and (d) if not, the reasons for delay in achieving these core objectives along with the specific timelines fixed by the Government for their completion?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of JJM in Kerala
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 121 · Asked on 2026-01-29
Ministry: JAL SHAKTI
Member asked
(a) whether the Government is aware that the implementation of the Jal Jeevan Mission (JJM) in Kerala has been halted due to insufficient funds and if so, the details thereof along with the reasons therefor; (b) the present status of completion of projects under JJM in Kerala including the details of the projects sanctioned, the percentage of works completed and the funds released and utilised as on date; (c) whether Kerala is behind the national average in terms of completion of works and funds utilisation under JJM; and (d) if so, whether any directive has been given to the State Government of Kerala to speed up the works and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceLoans under Adivasi Shiksha Rrinn Yojana
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 122 · Asked on 2026-01-29
Ministry: TRIBAL AFFAIRS
Member asked
(a) whether the Government is aware that the applications for educational loans under the Adivasi Shiksha Rrinn Yojana (ASRY) are often delayed or rejected, if so, the reasons therefor; (b) whether the Government is aware that many beneficiaries are asked for collateral for obtaining educational loans under the scheme, if so, the details of grievance redressal mechanism in place; (c) whether the Government is taking steps for effective awareness dissemination under ASRY including facilitation by educational institutes, if so, the details thereof; and (d) whether the Government is aware that the loan disbursement under ASRY is skewed across the country which is disproportionately affecting students in remote areas, if so, the specific steps taken to rectify this imbalance?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEMRSs in Jharkhand
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 123 · Asked on 2026-01-29
Ministry: TRIBAL AFFAIRS
Member asked
(a) the total number of Eklavya Model Residential Schools (EMRSs) approved and operational by December 2025, State-wise particularly in Jharkhand; (b) the details of EMRSs inaugurated and foundation stones laid on Tribal Pride Day 2025; and (c) the efforts being taken to enhance the quality of education and sports facilities in EMRS including the Amazon Future Engineer Programme?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational Highway Safety Policy
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 124 · Asked on 2026-01-29
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether the Ministry proposes to institute a comprehensive national highway safety policy mandating service roads, pedestrian underpasses and scientifically designed junctions as compulsory features rather than optional measures introduced only after fatalities occur, if so, the details thereof; (b) whether the Ministry has identified persistent black spots on national highways that continue to pose life-threatening risks to daily commuters and the urgent measures being implemented to prevent further accidents on such stretches, if so, the details thereof; (c) whether the Government proposes to mandate that all future national highways passing through habitations include continuous service roads for segregation of local traffic to proactively prevent recurring accidents and safety failures, if so, the details thereof; (d) whether any independent third-party road safety audits are being conducted after construction of national highways or whether contractors are still permitted to self-certify compliance raising concerns about accountability and commuter safety, if so, the details thereof; and (e) whether the Government proposes to provide compensation and rehabilitation to families of victims who lost their lives due to delayed safety interventions and design-related negligence on national highways, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSetting up of Mega Food Parks in Kalahandi
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 125 · Asked on 2026-01-29
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) the details of the steps taken/being taken by the Government to set up mega food parks, agro processing centres and cold chain projects during the last year along with the plans for the State of Odisha and especially for Kalahandi Lok Sabha Constituency; (b) the measures taken by the Government to fast track such projects especially as land acquisition might be a problem in quick starting the projects; (c) whether the Government has made assessment of the post-harvest losses of fruits and vegetables and if so, the details thereof; and (d) whether there have been adequate cold storage and refrigerated transport facilities provided to tribal, rural and aspirational districts to bridge regional gaps and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProgress of Kochi Metro Rail Project
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 126 · Asked on 2026-01-29
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether the finalisation of the selection of routes for the third and fourth phases of Kochi Metro has been completed, if so, the details thereof and if not, the reasons therefor along with the timeline fixed in this regard; (b) whether a funding model has been established for the third and fourth phases of Kochi Metro, if so, the details thereof and if not, the reasons therefor along with the timeline fixed in this regard; (c) whether any proposals from the State Government of Kerala related to the third and fourth phases of Kochi Metro are pending, if so, the details and the current status thereof; (d) whether other development plans for income generation to Kochi Metro Rail Limited (KMRL) have been decided, if so, the details thereof and if not, the reasons therefor along with the timeline fixed in this regard; (e) whether the completion date of the second phase of Kochi Metro has been fixed, if so, the details thereof and if not, the reasons thereof along with the timeline fixed in this regard; and (f) whether KMRL has initiated the procurement process for additional trains as part of its expansion plans in Phase II and Phase III development projects, if so, the details thereof and if not, the reasons therefor along with the timeline fixed in this regard?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDues owed to West Bengal
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 127 · Asked on 2026-01-29
Ministry: JAL SHAKTI
Member asked
(a) whether it is a fact that Members of Parliament from West Bengal met the Minister regarding the dues owed to the State and if so, the details thereof; (b) the quantum of the funds due on the Union Government to the State Government of West Bengal under the Jal Jeevan Mission; and (c) the quantum of the funds due on the Union Government to the State Government of West Bengal under the Flood Management and Border Areas Programme?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOperationalisation of Jewar Airport
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 128 · Asked on 2026-01-29
Ministry: CIVIL AVIATION
Member asked
(a) whether it is a fact that the proposed Jewar airport in Uttar Pradesh near the national capital is going to open shortly and if so, the main attractions and amenities that would be available at the said Airport; (b) the present status of rail and road connectivity from Jewar airport to various parts of the national capital and the Indira Gandhi International Airport, New Delhi; and (c) the steps proposed to be taken to reduce the reporting time for domestic and international passengers?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceLucknow-Sitapur Six-Lane NH
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 129 · Asked on 2026-01-29
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether the Detailed Project Report (DPR) for the Lucknow–Sitapur six-lane National Highway has been prepared, if so, the details thereof; (b) whether the said project has been approved by the Government; (c) if so, the time-frame for completion of the said project and the estimated cost thereof; and (d) whether the Government proposes to incorporate the latest technological and environment-friendly innovations in the development of the said National Highway and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConstruction of Flyover in Dabolim
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 13 · Asked on 2026-01-29
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the reasons for commencing the construction of the flyover between Dabolim–MES College Junction in Sancoale without obtaining No Objection Certificate (NOC) from the Indian Navy despite repeated requests from the Navy and directions of the South Goa District Road Safety Committee in its meeting held on 13 November, 2024; (b) whether, pursuant to the directions of the High Court, the Ministry has revised the design and drawings of the said flyover to comply with Obstacle Limitation Surface (OLS) height restrictions including any structural modifications to pillars and if so, the details thereof along with the revised drawings/plans in this regard; (c) the original sanctioned cost of the project and the revised cost after incorporating changes to conform with OLS norms along with the expenditure incurred on consultants and technical advisors engaged for the project; (d) the estimated financial loss to the exchequer arising out of corrective actions such as redesign, slicing of pillars, etc.; and (e) whether responsibility has been fixed and action initiated against the officials or agencies responsible for the lapse leading to financial loss, cost escalation and project delays and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSupport to SHGs for Seed Capital under PMFME
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 13 · Asked on 2026-01-29
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) the number of enterprises supported under “Support to SHGs for seed capital” under Pradhan Mantri Formalisation of Micro Food Processing Enterprises (PMFME) scheme since the inception of scheme, State, year and district-wise; (b) the number of applications received, approved and pending under this component since the inception of scheme, State/year-wise and district-wise for the State of Andhra Pradesh; (c) whether the funds provided under the scheme have been disbursed to the eligible beneficiaries and if so, the details thereof; (d) the amount of subsidy that has been provided since the inception of the scheme, State/year-wise and district-wise for Andhra Pradesh; (e) whether any awareness programme in building mechanism have been conducted under the said scheme and if so, the details thereof; (f) the details of funds provided for these mechanisms, State, year and district-wise; and (g) the steps being taken by the Government to expedite pending approvals and being improvement in utilisation of the funds in Andhra Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Metro Rail Project Proposals
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 130 · Asked on 2026-01-29
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) whether the Union Government has rejected the Metro Rail project proposals for the Tier-II cities of Coimbatore and Madurai in Tamil Nadu and if so, the details thereof along with the reasons therefor; and (b) the complete list of Metro Rail projects approved in Tier-II cities across the country till date, location-wise along with the respective population of the cities and the estimated cost of each project?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment of Airports in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 131 · Asked on 2026-01-29
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government has approved or granted in-principle clearance for the proposed airports at Tadepalligudem, Kuppam, Srikakulam and Ongole in Andhra Pradesh and the size (acreage) of land acquired or proposed for each of these airports; (b) if so, the details thereof along with the timelines fixed for feasibility study, land acquisition, release of central funding and commencement of first phase of construction and if not, the reasons therefor; and (c) the details of the policy in place for promoting secondary airports under the Regional Connectivity Scheme/Greenfield Airports Policy and the manner in which these sites qualify?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceHouses Completed under PMAY-U
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 132 · Asked on 2026-01-29
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) the number of houses sanctioned and completed under the Pradhan Mantri Awas Yojana - Urban (PMAY-U) since its inception, component and year-wise; (b) whether the Government has conducted any study to assess the actual demand for houses under PMAY-U, if so, the details thereof and if not, the reasons therefor; and (c) the percentage of total number of houses sanctioned and completed for slum households since the inception of PMAY-U, year-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProcurement of Electricity via Energy Exchanges
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 133 · Asked on 2026-01-29
Ministry: POWER
Member asked
(a) the details of the mechanism through which power is traded via exchanges in the country along with the process followed for price discovery and the total volume of electricity procured through power exchanges; (b) the details of the average price at which power has been purchased through major power exchanges such as Indian Energy Exchange Ltd. (IEX), Power Exchange India Limited (PXIL) and Hindustan Power Exchange Ltd. (HPX) during the last five years, along with a breakdown for both day-time and night-time rates; and (c) whether the Government has envisaged any special incentives, concessional tariffs or schemes to support emerging industries such as homestays, hospitality units and MSMEs with the objective of reducing their energy costs and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSwachh Bharat Mission-Grameen and Urban
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 134 · Asked on 2026-01-29
Ministry: JAL SHAKTI
Member asked
(a) the details regarding the quantum of funds (in rupees), the Union Government has released during the last eleven years for Swachh Bharat Mission-Grameen and Urban, year-wise; and (b) the details regarding the share of funds (in rupees), the Union Government has transferred to State Governments under Swachh Bharat Mission-Grameen and Urban during the last eleven years, year-wise and State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImpact of Revised Pilot Duty Rules
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 135 · Asked on 2026-01-29
Ministry: CIVIL AVIATION
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has taken into consideration comments by international aviation bodies that India’s revised pilot-duty rules may be more restrictive than norms followed in other jurisdictions, potentially impacting airline operational flexibility under the Government’s safety-driven regulatory approach; (b) if so, the details of monitoring mechanisms instituted to track the effects of these rules on flight cancellations, delays and network planning and the extent of compliance reporting required from airlines under the direction of the Government; and (c) whether the Government proposes to conduct a periodic review of fatigue-risk management data and global best practices to ensure that safety standards remain paramount while supporting airline operational efficiency under the Government’s balanced civil-aviation policy and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFinancial Support for MSMEs
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 136 · Asked on 2026-01-29
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the reasons for increasing Micro, Small and Medium Enterprises (MSMEs) classification limits without simultaneously providing a clear roadmap on the manner in which smaller enterprises would compete with larger MSMEs, thereby risking exclusion and monopolization of benefits; (b) the mechanisms that are in place to ensure that banks disburse these loans efficiently, given the enhanced credit guarantee coverage from rupees 5 crore to rupees 10 crore for micro and small enterprises; (c) the reasons for not conducting independent assessment of whether doubling guarantee cover for startups and export-oriented MSMEs would genuinely increase credit access, or simply burden banks with high-risk lending obligations; (d) the justification for issuing rupees 5 lakh credit cards to micro-enterprises when most beneficiaries may lack financial literacy or awareness, risking misuse, defaults or exclusion of genuinely deserving units; and (e) whether the safeguards exist to ensure that first-time entrepreneurs, particularly women and SC/ST groups, actually benefit from the support of rs. ten thousand crore under Fund of Funds to startups rather than well-connected individuals cornering these funds and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConstruction of Six-Lane Road Over Bridge at Nadal, Kannur
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 137 · Asked on 2026-01-29
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether it is a fact that a Memorandum of Understanding (MoU) was signed between the Ministry of Road Transport and Highways (MoRTH) and the Ministry of Railways (MoR) to replace level crossings on National Highways with Road over Bridges (RoBs) on a single-entity basis, if so, the details thereof; (b) whether the Government is aware of the critical traffic congestion at Nadal Gate (LC No. 238) on NH-66 in Kannur in Kerala and if so, the details of the approved General Arrangement Drawing (GAD) for the proposed six-lane ROB; (c) the current physical and financial progress of the construction of the Nadal ROB being executed by the National Highways Authority of India (NHAI) as part of the NH-66 expansion project; and (d) the anticipated deadline for the completion and commissioning of the six-lane ROB at Nadal to make this stretch of NH-66 signal-free?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceHydrocarbon Exploration in Kangra-Mandi Petroleum Exploration Licence Area
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 138 · Asked on 2026-01-29
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) the current status of hydrocarbon exploration in the Kangra-Mandi Petroleum Exploration Licence (PEL) area including details of recent 2D/3D (two dimensional and three dimensional) seismic data acquisition and reprocessing of vintage data by ONGC or other agencies indicating renewed or significant gas shows seepages or reservoir potential in the area; (b) whether recent drilling or geological modelling has established the commercial viability of thermogenic gas reserves in the Subathu and Dharamshala formations particularly within the complex 'Triangle Zone' structures of Jwalamukhi, if so, the details thereof; (c) the total expenditure incurred to date and the projected expenditure for further exploration and appraisal in the above blocks; (d) the likely timeframe for completion of appraisal and commencement of commercial production, if found viable along with the challenges involved, if any; and (e) the policy roadmap for further Himalayan exploration and the measures proposed to make commercially viable the untapped resource potential in the Himalayan formations?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRoad Accidents at Durgapur Expressway
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 139 · Asked on 2026-01-29
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether a large number of road accidents have occurred on the Durgapur Expressway in West Bengal recently resulting in several fatalities, if so, the details thereof; (b) whether the road accidents are occurring on the flyover constructed at DVC More on the National Highway; (c) if so, the details thereof; and (d) the various remedial measures being taken to prevent such road accidents?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.