Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 9,976–10,000 / 34,220
Eligibility for Land Pooling Policy
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 993 · Asked on 2026-02-05
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) the rationale for fixing the eligibility threshold of two hectares for the Land Pooling Policy under the Delhi Development Act,1957; (b) the number of farmers owning two or more hectares of land in Delhi and the share of land held by such farmers in comparison to the total land eligible for land pooling; (c) the details of the financial obligations imposed on participating landowners, including development charges or other levies; (d) the details of Expressions of Interest received from individual farmers including those accepted, withdrawn or pending and complaints received since 2019, year-wise; (e) whether the design of the Policy has resulted in concentration of pooled land with a limited number of large private developers and if so, the details thereof; (f) whether beneficiaries of land allotted under the Twenty-Point Programme (1974) in Delhi enjoy full ownership rights, if so, the details thereof and if not, the reasons therefor; and (g) whether the Government proposes to confer such ownership rights to the beneficiaries and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEmployment in EMRSs
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 994 · Asked on 2026-02-05
Ministry: TRIBAL AFFAIRS
Member asked
(a) the details of the total number of teachers recruited in Eklavya Model Residential Schools (EMRSs), along with the details of the total number of female teachers recruited out of them State-wise and district-wise; (b) the details of the institution/authority which determines the service conditions of these teachers; (c) the details of the Board of Education with which the EMRSs are affiliated, along with the detailed results/performance of these schools reported so far; (d) the details of the curriculum and co-curricular activities taught in these schools; (e) whether Yoga education is also imparted to the students in these schools and if so, the details thereof; and (f) whether there is any system for screening/testing of diseases like Sickle cell Anaemia in these schools and if so, the details of the framework, resources and mode of operation thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAir Connectivity from Tiruchirappalli International Airport
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 995 · Asked on 2026-02-05
Ministry: CIVIL AVIATION
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has assessed the need for expanding air connectivity to eastern and north-eastern regions of the country, particularly to Kolkata and Guwahati in view of passenger demand, trade, education and tourism and if so, the details thereof; (b) whether any proposal has been received or is under consideration to introduce direct flights from the said airport to Kolkata and Guwahati under the UDAN Scheme or other aviation schemes; and (c) if so, the details thereof and the timeline fixed for commencement of such services and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExcess Toll Collection on Toll Plazas
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 996 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the number of toll plazas presently functioning on National Highways (NHs), State-wise; (b) the number out of these plazas continuing operations after expiry of their concession/tenure, State-wise; (c) whether the Government has noticed the recent violence at Paliyekkara Toll Plaza on NH-544 in Thrissur district, Kerala, regarding collection of toll; (d) if so, the details thereof and the reasons thereto; (e) the number of toll plazas against which the Ministry has initiated action for violation of rules or excess collection, State-wise; and (f) the total number of complaints received regarding toll collection on NHs during the last three years, year-wise and State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePM-eBus Sewa Scheme in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 997 · Asked on 2026-02-05
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
Varsha Gaikwad, Dhairyasheel Mohite Patil, Supriya Sule, Bhaskar Bhagare, Amol Kolhe, Sanjay Dina Patil
(a) the status of implementation of the PM-eBus Sewa scheme in Maharashtra including the number of cities covered and the number of electric buses sanctioned, tendered and made operational as on date; (b) the details of Central financial assistance approved, released and utilised under the said scheme in Maharashtra, city-wise; (c) whether the Union Government has assessed the adequacy of charging infrastructure, depot preparedness and power availability for effective operation of e-buses in Maharashtra and if so, the details thereof; (d) the expected outcomes of the said scheme in terms of improvement in urban mobility, reduction in emissions and benefits to commuters; and (e) the monitoring and grievance-redressal mechanism put in place by the Union Government to ensure timely implementation and long-term sustainability of the PM-eBus Sewa scheme in Maharashtra?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDeployment of suitable Aircraft on Regional Routes
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 998 · Asked on 2026-02-05
Ministry: CIVIL AVIATION
Member asked
(a) whether the Union Government is aware of the concerns raised by the State Government of Tamil Nadu regarding the deployment of small ATR aircraft on intra-state routes such as Chennai–Thoothukudi and Chennai–Tiruchirappalli despite high passenger loads and if so, the response of the Union Government thereto; (b) whether the Union Government proposes to direct or advise airline operators to deploy larger and more suitable aircraft on high-demand regional routes and if so, the details thereof; and (c) the details of the steps taken by the Union Government to ensure that airlines maintain adequate service standards?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAccidents on Major National Highways in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 999 · Asked on 2026-02-05
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
Amol Kolhe, Dhairyasheel Mohite Patil, Supriya Sule, Sanjay Dina Patil, Bhaskar Bhagare
(a) whether the Government is aware of the rising incidence of potholes and related accidents on major National Highways in Maharashtra, including NH-48, NH-61 and NH-160, particularly during the monsoon months; (b) the number of accidents, fatalities and injuries reported on these highways during the last three years, highway-wise; (c) whether any technical or safety audits have been conducted to assess the quality of maintenance and performance of NHAI contractors and concessionaires and if so, the details thereof; (d) whether accountability has been fixed in cases of substandard maintenance and the number of instances where penalties or blacklisting have been initiated; (e) the funds allocated, sanctioned and utilised for National Highway maintenance in Maharashtra during the last three years; and (f) the concrete steps taken to ensure timely repairs of potholes, adoption of modern maintenance technologies and prevention of recurring road damage and accidents in the State?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEffectiveness of PMGKAY and PDS
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 61 · Asked on 2026-02-04
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) the details of the measures taken by the Government to increase the reach and effectiveness of the Pradhan Mantri Garib Kalyan Anna Yojana (PMGKAY) and the Public Distribution System (PDS) in the country including Dumka district of Jharkhand, Chhattisgarh, Karnataka, Jammu-Kashmir, Telangana, Nabarangpur Lok Sabha Constituency of Odisha and Tribal and Rural dominated Chhindwara district of Madhya Pradesh and Palghat district in Maharashtra; (b) the present status of digitalisation of ration cards and implementation of One Nation One Ration Card (ONORC) scheme in all States and Union Territories including Dumka district of Jharkhand, Jammu-Kashmir, Telangana, Nabarangpur Lok Sabha Constituency of Odisha and Chhindwara district of Madhya Pradesh; (c) the outcomes recorded in terms of number of beneficiaries receiving free foodgrains, inter-State and inter-district portability transactions and improvement in food security, transparency and beneficiary satisfaction during last five years, State and year-wise especially in context of Madhya Pradesh, Karnataka, Maharashtra and Nabarangpur Lok Sabha Constituency in Odisha; (d) whether the Government has undertaken any State-wise assessment of PMGKAY and PDS reforms particularly in Maharashtra and Jalgaon Lok Sabha constituency; (e) if so, the details of beneficiaries covered, grievance redressal performance and measures taken to address last-mile delivery challenges in Maharashtra including Jalgaon district; and (f) the details of the funds released during the last five years on PMGKAY and PDS in Palghar district of Maharashtra?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDigital India Internship Scheme in Andhra Pradesh
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 62 · Asked on 2026-02-04
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) the number of students from Andhra Pradesh who have completed internships under the Digital India Internship Scheme since its inception; (b) the details of the universities/colleges and the courses/programmes pursued by those students, year and district-wise; (c) whether the Government is considering or proposing to expand the Digital India Internship Scheme to other Indian cities beyond New Delhi with a view to improve accessibility for students from rural and remote areas including those from Andhra Pradesh; (d) if so, the details and timeline of such expansion to additional locations; and (e) the steps taken by the Government to increase scheme participation among students in rural and marginalized districts of Andhra Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceVande Bharat Sleeper Trains in Kerala
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 63 · Asked on 2026-02-04
Ministry: RAILWAYS
Member asked
(a) whether the Government plans to introduce Vande Bharat Sleeper trains in Kerala and if so, the details thereof including the timeline for rollout and the number of trains allocated to the State; (b) the details of the specific routes proposed for Vande Bharat Sleeper trains in Kerala including expected reductions in travel time on this count; (c) whether the Government is aware of the persistent overcrowding on Kerala's coastal railway routes via Alappuzha including the Ernakulam-Thiruvananthapuram corridor, where MEMU/passenger trains face severe capacity issues leading to passengers fainting, reduced coaches and inadequate services during peak hours; (d) if so, the details of the measures being taken to address this overcrowding including addition of coaches for MEMU trains, fastening of track doubling along with any plans for new trains/Vande Bharats for capacity enhancements; (e) whether the Government proposes to introduce additional reservation quotas including a student quota in Vande Bharat Sleeper Trains and if so, the details thereof; (f) whether the dynamic pricing system is applicable to Vande Bharat Sleeper trains and if so, the details thereof; and (g) whether the introduction of dynamic pricing system will increase ticket fare equivalent or higher than airfare and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceManufacturing of Vande Bharat Sleeper Rakes
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 64 · Asked on 2026-02-04
Ministry: RAILWAYS
Member asked
Yaduveer Wadiyar, Chandan Chauhan
(a) the details of train rakes being manufactured by Indian Railway in the country; (b) the status of the number of train rakes proposed for manufacturing/under manufacturing for Vande Bharat Sleeper trains in the country particularly in Jharkhand; (c) the details of the proposed timeline for completion of manufacturing of these train rakes along with their induction into the regular passenger service; (d) the comparative features of Vande Bharat sleeper trains vis-a vis conventional overnight trains in terms of speed, onboard amenities, safety features and passenger comfort with reference to design and performance specifications; (e) the proposed manufacturing and network expansion plan for Vande Bharat sleeper rakes; (f) whether the Government proposes to introduce direct train service of Vande Bharat sleeper trains from Delhi to Kachchh and from Darbhanga to Delhi via Sitamarhi, Ayodhya Dham and if not, the details thereof and if not, the reasons therefor; (g) whether the Government proposes to introduce services of Vande Bharat sleeper trains on major routes in Madhya Pradesh (particularly on the train routes connected with Itarasi-Nagpur and Chhindwara), North Eastern India, Bhopal-Patna, Bhopal-Ayodhya, Darbhanga to Delhi via Sitamarhi, Ayodhya Dham route and in Andhra Pradesh and Palghar district of Maharashtra route in near future and if so, the details thereof including proposed route; (h) whether the Government proposes to provide better connectivity in the network expansion including Palghar district in Maharashtra and if so, the details thereof; and (i) the number of rail rakes and traction equipment manufactured in BHEL, Bengaluru and Projected numbers in the next two years?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDomestic Manufacturing of Critical Electronic Components
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 65 · Asked on 2026-02-04
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) whether a national framework exists to promote domestic manufacturing of critical electronic components beyond assembly; and (b) if so, the details of steps taken to reduce strategic import dependence?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceLack of Passenger amenities at Kanth Railway Station
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 66 · Asked on 2026-02-04
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether Kanth Railway Station located in Moradabad Parliamentary Constituency lacks adequate passenger amenities to meet the growing passenger traffic, thereby developing the need for construction of a proper parking space and a suitable waiting room; (b) if so, the details of the actions proposed to be taken by the Government to develop these essential amenities at the station including providing a planned parking area, construction of a well-equipped waiting room and arrangements for barrier-free access for passengers along with the details of the proposed timeframe and implementing agencies in this regard; and (c) the steps proposed to be taken by the Government to include the said railway station under the Amrit Bharat Station Scheme for beautification of the station premises, improvement in the passenger movement areas, provision of advanced amenities and upgradation of station infrastructure to modern standards?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Projects in Andhra Pradesh
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 67 · Asked on 2026-02-04
Ministry: RAILWAYS
Member asked
(a) the details of the railway infrastructure projects proposed/sanctioned/under construction in Andhra Pradesh particularly in Guntur Division; (b) the details of the funds allocated/sanctioned/released/utilised for railway projects in Andhra Pradesh during the last five years, project-wise; (c) whether the Government has set any timelines for completion of each sanctioned railway project and if so, the details thereof; (d) the details of the projects pending for more than ten years in Andhra Pradesh including the reasons for delay; and (e) the details of the steps taken by the Government to expedite execution and ensure timely completion of pending railway projects in Andhra Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceIndigenous Development of Bio-bitumen from the Stubble
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 68 · Asked on 2026-02-04
Ministry: SCIENCE AND TECHNOLOGY
Member asked
We have not ingested the asking members for this question.
(a) whether Council of Scientific and Industrial Research (CSIR) and Central Road Research Institute (CRRI) have developed the technology to develop Bio-bitumen from the stubble indigenously and if so, the details thereof; (b) the amount likely to be saved by the Government which is incurred on import of petro bitumen; (c) whether the Government has issued the licence for commercial manufacturing of bio bitumen to 14 private companies; (d) if so, the details thereof and the terms and conditions of such technology transfer; the likely impact of the adoption of bio-bitumen on cost reduction, import substitution, carbon emissions and rural/agricultural waste utilisation; and (e) the steps taken by the Government to promote large-scale adoption, quality standards and commercial viability of bio-bitumen across the country?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCoal Allocation under SHAKTI Policy
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 69 · Asked on 2026-02-04
Ministry: COAL
Member asked
(a) the details of total quantity of coal offered and actually allocated under various components of the Scheme for Harnessing and Allocating Koyala Transparently in India (SHAKTI) Policy for transparent coal allocation during the year 2025 along with the details of implementation and outcomes, category-wise; (b) the extent to which coal linkages granted under SHAKTI Policy have translated into actual power generation capacity being operationalised in the country including Odisha and Chindwara district of Madhya Pradesh; (c) the eligibility criteria and timelines prescribed for allocation of coal linkages under the revised SHAKTI Policy; and (d) the measures taken to improve uptake of coal offered under linkage auctions to ensure optimal utilisation of domestic coal resources and the impact of such measures on coal utilisation and power sector in the country including Odisha and Chindwara district of Madhya Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBeneficiaries under PM-SGMBY
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 691 · Asked on 2026-02-04
Ministry: NEW AND RENEWABLE ENERGY
Member asked
Dilip Saikia, Bhojraj Nag, P. P. Chaudhary, Rajkumar Chahar, Manna Lal Rawat, Naba Charan Majhi, Brijesh Chowta
(a) the total number of households benefited under the Pradhan Mantri - Surya Ghar Muft Bijli Yojana (PM-SGMBY), State/UT-wise including Rajasthan and Karnataka particularly in Pali Lok Sabha constituency and Dakshin Kannada district; (b) the number of rooftop solar power installations completed so far and the amount of subsidy disbursed under the PM-SGMBY particularly in Pali Lok Sabha Constituency, Karnataka including Dakshin Kannada district; (c) the progress made in the implementation of the PM-SGMBY, State-wise along with the details of the top performing States; (d) the details of the estimated clean energy production and the corresponding reduction in carbon emissions during the implementation of PM-SGMBY; and (e) the progress made under the PM-SGMBY in Rajasthan and Karnataka including the number of rooftop solar plants installed, households benefited and the amount of subsidy disbursed in this regard, district-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of National Green Hydrogen Mission
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 692 · Asked on 2026-02-04
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) the present status of implementation of the National Green Hydrogen Mission including electrolyser manufacturing and hydrogen production capacity awarded; (b) the details of green ammonia supply agreements signed with fertilizer units and the pricing achieved; (c) the ports designated as Green Hydrogen Hubs and the infrastructure being developed for hydrogen export; (d) the timeline and milestones for achieving the five Million Metric Tonne (MMT) green hydrogen production target by the year 2030 and the major milestones identified for achieving this target; and (e) the support given to the private sector for investing in Green Hydrogen technologies?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceComponents of PM-KUSUM
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 693 · Asked on 2026-02-04
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) whether Pradhan Mantri - Kirshi Urja Suraksha evam Utthaan Mahabhiyan (PM- KUSUM) has been implemented with the aim of increasing farmers' income and reducing dependence on diesel/traditional electricity; (b) if so, the number of units/pumps approved and installed under Component-A (Grid-Connected Solar Plants) and Component-B (Off- Grid Solar Pumps) in Rajasthan along with the details of total capacity (MW/HP) and expenditure incurred, year-wise; (c) the details of the number of applications approved, under progress and completed under PM-KUSUM in all blocks of the Tonk-Sawai Madhopur Lok Sabha Constituency, block-wise along with the installed solar capacity (HP/kWp) and the grants provided, block-wise; (d) whether a large number of applications are pending/have been rejected due to financial, technical or DISCOM-related reasons and if so, the details thereof; and (e) the details of Government's time-bound action plan for their speedy disposal and prioritizing the remaining eligible farmers?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNew Railway Line between Erode- Namakkal
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 694 · Asked on 2026-02-04
Ministry: RAILWAYS
Member asked
(a) whether the Government has considered or proposes to undertake a new railway line project connecting Erode and Namakkal in view of the potential to improve connectivity for Kumarapalayam (which falls under the Erode Parliamentary Constituency) and nearby regions and if so, the details thereof; and (b) whether the Government is aware that the existing Erode–Chennai rail route is highly congested and if so, whether an alternative Erode–Namakkal–Chennai corridor has been examined to ease traffic and improve passenger convenience?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment funds to Railway Zones
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 695 · Asked on 2026-02-04
Ministry: RAILWAYS
Member asked
(a) the total number of zones in Indian Railways at present and their profitability status; (b) whether the Government has any policy/guidelines for allotment of development funds to Railway Zones as per their performance and if so, the details thereof; (c) the present status of Southern Railway and the amount of development funds released to them during the last three years and the current year; and (d) whether the Government has any proposal to increase the number of zones in future and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStrengthening Weather Forecasting System
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 696 · Asked on 2026-02-04
Ministry: EARTH SCIENCES
Member asked
Krishna Prasad Tenneti, Vishweshwar Hegde Kageri, Jashubhai Rathva, Tapir Gao, Rajkumar Chahar, Bibhu Prasad Tarai, Govind Karjol, Ramesh Awasthi, Shankar Lalwani, Alok Sharma, Brijesh Chowta
(a) the details of the key improvements achieved in weather forecasting accuracy, early warning dissemination and climate services during the last five years and the current year particularly in the State of Karnataka; (b) the extent to which these interventions have translated into measurable socio-economic benefits for farmers, fisherfolk and vulnerable communities including coastal fishing communities in Dakshina Kannada; (c) the progress made in expanding Doppler Weather Radar coverage, urban climate platforms and Heat Action Plans in collaboration with States including coverage and implementation status in Karnataka and Dakshina Kannada district; (d) the details of roadmap for further strengthening last-mile delivery of weather and climate advisories; and (e) the details of the schemes for establishing or relocating a Regional Meteorological Centre in Bhopal city of Madhya Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExpansion of Freight Logistics and Regional Connectivity
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 697 · Asked on 2026-02-04
Ministry: RAILWAYS
Member asked
Jugal Kishore, Bhartruhari Mahtab, Hemang Joshi, Nalin Soren, Ananta Nayak, Ramesh Awasthi, Shankar Lalwani, Chandan Chauhan, Sukanta Kumar Panigrahi, Vijay Kumar Dubey
(a) whether the Government has undertaken initiatives to strengthen freight logistics and regional connectivity including first and last-mile solutions such as door-to-door services, goods sheds, private sidings and time-tabled cargo trains in the country particularly in Jharkhand and UT of Jammu and Kashmir and if so, the details thereof; (b) whether progress has been made in wagon production upgradation and freight capacity enhancement and if so, the details of the improvements achieved and challenges faced in the process; (c) whether railway projects in remote and tribal regions, particularly Kandhamal district of Odisha, including the new line via Phulbani, are under implementation and if so, the status of DPR review and proposals for agri-freight goods sheds/sidings; (d) whether steps have been taken/being taken by the Government under PM Gati Shakti to provide rail connectivity to unconnected Aspirational and tribal districts like Kandhamal and if so, the measures and timelines to address the connectivity gap; and (e) the details of the current status, progress made so for, amount of funds sanctioned, land acquisition and expected timeline of the new railway line project connecting Gaya in Bihar to Chatra in Jharkhand?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNew Railway Lines in Telangana
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 698 · Asked on 2026-02-04
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government of Telangana has sent various proposals of new routes including 1. Vikarabad-Krishna(122Km) 2. Kalwakurthy-Macherla(120km) 3. Gadwal-Dornakal(316km) 4. Kacheguda-Jaggayyapeta(250km) 5. Patancheru-Adilabad(320km) 6. Bodhan-Latur Road(128km) 7. Akkanapet Bypass(128km) 8. Pandurangapuram-Badrachalam Road(13 km) (b) if so, the details and the action taken thereon; and (c) the details of the funds sanctioned/spent for the said project?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGreen Energy Corridor
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 699 · Asked on 2026-02-04
Ministry: NEW AND RENEWABLE ENERGY
Member asked
Rajesh Verma, Lata Wankhede, Atul Garg
(a) the status of the Green Energy Corridor project in Bihar, Andhra Pradesh, Uttar Pradesh and Madhya Pradesh to facilitate the evacuation of renewable power; (b) the details of the transmission infrastructure upgrades in the Samastipur, Khagariya, Rajahmundry, Ghaziabad and Sagar grid sub-station in the said States to handle solar power injection; (c) the measures taken by the Government to reduce the transmission and distribution losses in the rural feeders of the said districts; (d) the status of the availability of power supply to the agriculture sector during the day time using solar power; and (e) the steps taken by the Government to train the local youth as 'Suryamitra' for the installation and maintenance of renewable energy systems?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.