Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 8,751–8,775 / 34,220
Difficulties in Train Operations due to Fog
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 165 · Asked on 2026-02-11
Ministry: RAILWAYS
Member asked
Jai Parkash, Satpal Brahamchari
(a) whether the Government is aware that during the winter season due to dense fog frequent delays, cancellation and safety-related difficulties arise in the operation of trains passing through Haryana, particularly Hisar, Hansi, Sonipat and Jind districts under Northern Railways; (b) if so, the details of the number of trains affected due to fog in the said districts since 2021 till date along with the details of delayed, partially cancelled and fully cancelled trains; (c) whether timely information and adequate alternative arrangements are not sufficiently available to passengers during fog conditions and if so, the details and the reasons therefor; (d) the steps taken with regard to fog safety devices, advanced signalling, training of loco pilots and passenger information systems to ensure safe and smooth train operations during the fog; and (e) the future action plan of the Government to enhance the reliability of rail services during fog in the said districts?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceScience & Technology and Innovation Hubs
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 166 · Asked on 2026-02-11
Ministry: SCIENCE AND TECHNOLOGY
Member asked
We have not ingested the asking members for this question.
(a) the number of Science, Technology and Innovation (STI) Hubs established across the country during the last five years, year and State-wise; (b) the number of such STI Hubs established in Andhra Pradesh during the same period, district-wise; (c) the details of these STI Hubs in Andhra Pradesh, including their objectives, key focus areas, implementing institutions and the target SC/ST beneficiary groups, district-wise; (d) the number of beneficiaries (male, female, SC/ST) supported through STI Hubs across the country during the last five years, year, State and district-wise in Andhra Pradesh; (e) the details of the amount of funds sanctioned, released and utilised for STI Hubs in Andhra Pradesh during the last five years, year, project and district-wise; and (f) whether the Government plans to invite applications for setting up new STI Hubs during the current financial year and if so, the details of the expected timeline for issuing calls for proposals and finalising selections?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInstallation of Kavach on all Railway Routes
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 167 · Asked on 2026-02-11
Ministry: RAILWAYS
Member asked
(a) whether Kavach, the indigenously developed Train Collision Avoidance System (TCAS) has been installed on all trains and railway routes across the country and if so, the details thereof and if not, the reasons therefor; (b) the total number of trains and route kilometers currently covered under Kavach implementation, zone-wise; (c) whether any major train accidents have occurred during the last two years due to non-installation/failure of Kavach and if so, the details thereof; and (d) the timeline by which 100 per cent coverage of Kavach is expected and the steps taken/being taken by the Government to ensure zero-collision railway operations across the country?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceLegality of Extension of Waqf Registration Deadline
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 168 · Asked on 2026-02-11
Ministry: MINORITY AFFAIRS
Member asked
(a) the details of basis on which the Government fixed 5 December 2025 as the final date for registration of waqf properties on the UMEED portal whereas the Act mandates a 6-month period to be calculated from the date of commencement of the Act which makes 5 October 2025 the last date; (b) the manner in which the Government treats the date of launching the portal as the starting date instead of date of commencement of the Act; (c) the details of provision of law under which the Union Government has extended the last date for registration along with the clause which allows the Government to extend this statutory timeline; and (d) whether it is a fact that the Supreme Court has suggested that an amendment to the Act would be required to extend the deadline and if so, the details thereof along with the manner in which the Government has extended the last date from 5 October 2025 to 5 December 2025 without bringing an amendment?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOptical Fibre Connectivity and Rural Digital Access
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 169 · Asked on 2026-02-11
Ministry: COMMUNICATIONS
Member asked
Dharambir Singh Chaudhary, Bhola Singh
(a) the details of the increase in Optical Fibre Cable (OFC) length during the last three years, State-wise; (b) the measurable improvements observed in broadband speed, network reliability and 4G/5G readiness as a result thereof and the district-wise status of OFC connectivity in rural areas and border touching areas including Bulandshahr district, Bhiwani-Mahendergarh Lok Sabha Constituency; (c) the details of the OFC length taken in Palghar district in Maharashtra and the reason behind poor broadband speed, network reliability and 4G/5G in the Palghar district; (d) if so, the measurable outcomes observed in terms of network performance indicators such as average download/upload speeds, latency and network uptime in Karnataka and Bengaluru; (e) whether expanded OFC connectivity under BharatNet in rural areas and urban fibre rollout by telecom service providers has enabled wider adoption of digital services such as e-governance, online education, telemedicine, and digital payments; and (f) if so, the details thereof, including rural–urban coverage achieved and major gaps, if any?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Projects and Schemes in Assam
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 170 · Asked on 2026-02-11
Ministry: DEVELOPMENT OF NORTH EASTERN REGION
Member asked
(a) the details of the number of projects in Assam funded by the Ministry of Development of North Eastern Region (DoNER) that have been delayed, scrapped and foreclosed along with the reasons for each such project; (b) the details regarding the manner in which infrastructure gaps in flood-prone and hilly areas are being addressed to ensure better connectivity and livelihoods; (c) the details of the amount of funds under the Prime Minister's Development Initiative for North East Region (PM-DevINE), North East Special Infrastructure Development Scheme (NESIDS) and North Eastern Council (NEC) that remain unspent in Assam and the reasons for the same; (d) the details of the reasons for which Assam is lagging behind the national average in basic connectivity and last-mile infrastructure; and (e) the details of the concrete reforms introduced so that various DoNER schemes translate into visible jobs, livelihoods and timely infrastructure?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInvestments in Artificial Intelligence
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 171 · Asked on 2026-02-11
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
We have not ingested the asking members for this question.
(a) the details of India's hurdles in translating research results of Artificial Intelligence (AI) into commercial, market-ready products; (b) whether India is aiming to achieve capturing 10 per cent of the $700 billion global space economy by 2030 spanning Artificial Intelligence, space technology, quantum computing and biotechnology; (c) if so, the details thereof along with the measures started to achieve the target; (d) whether it is true that deep tech funding in India saw a 77 per cent drop with a 60 per cent reduction in the investor pool; (e) if so, the details thereof along with the steps taken by the Government to encourage the investments in the sector; (f) the details of India's gross expenditure on Research & Development since the last three years; and (g) whether the R&D share in the Gross Domestic Product (GDP) is significantly lower than competitors and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSurvey for Rare Earth Material
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 172 · Asked on 2026-02-11
Ministry: ATOMIC ENERGY
Member asked
(a) whether the Government proposes to conduct a survey regarding the potential availability of rare earth materials in Nawada and Sheikhpura districts of Bihar and if so, the details thereof; (b) whether the Government proposes to conduct scientific exploration/survey in the said areas through Indian Rare Earths Limited (IREL); and (c) if so, the proposed timeline fixed to conduct the said survey and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBSNL's Initiatives to improve National and International Connectivity
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 173 · Asked on 2026-02-11
Ministry: COMMUNICATIONS
Member asked
(a) the major initiatives/investments being driven or supported across the country by the BSNL to improve national and international connectivity and the regulatory/policy support provided by the Government in this regard; (b) the details of the communication services (like - Leased lines, VSAT, Internet Backhaul, Enterprise Data Services, etc.) being provided by BSNL in Shimla Lok Sabha Constituency of Himachal Pradesh at present; and (c) the additional steps/schemes being proposed or implemented by the Government to ensure better and reliable connectivity across the hilly and remote areas of the Shimla Lok Sabha constituency along with the timelines thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNew Railway Line between Savalyapuram to Bapatla
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 174 · Asked on 2026-02-11
Ministry: RAILWAYS
Member asked
(a) whether the Government has received any proposal/representation for the construction of a new railway line connecting Savalyapuram and Bapatla in Andhra Pradesh; (b) if so, the details thereof and the present status of the said proposal; (c) whether the Government proposes to undertake a feasibility survey/Detailed Project Report (DPR) for the Savalyapuram–Bapatla railway line, considering its potential to decongest the Guntur–Vijayawada section and improve connectivity between Bengaluru, Hyderabad, Chennai and the eastern coastal region and if so, the details thereof; (d) whether the Government has assessed the economic, freight, tourism and passenger potential of the proposed line, particularly for agricultural produce, mineral transport and pilgrimage traffic to Kotappakonda (Sri Trikoteswara Swamy Temple); and (e) if so, the details thereof including the timeline proposed for initiating further action on the project?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFare Structure/Affordability of Vande Bharat Trains
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 175 · Asked on 2026-02-11
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) the details of the current fare structure for Vande Bharat trains during the year 2025–26 including average AC Chair Car and Executive Class fares on major routes, comparison with regular Mail/Express trains and passenger occupancy data (often near 100%) as of January 2026; (b) the details of the steps taken to address widespread criticism that high fares make Vande Bharat trains inaccessible to middle and lower-income passengers, despite claims of premium modern travel; (c) the manner in which the pricing policy aligns with World Bank recommendations for inclusive and affordable public transport systems and best practices from the world including Japan’s Shinkansen and China's high speed rail which balance speed with broader economic accessibility; and (d) the details of the initiatives taken during the year 2025-26 to make Vande Bharat more inclusive including any concessions, subsidised tickets or special quotas for women, senior citizens or economically weaker sections and their uptake?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGlobal Satellite Phone Service (GSPS)
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 176 · Asked on 2026-02-11
Ministry: COMMUNICATIONS
Member asked
(a) whether the BSNL started sale of Global Satellite Phone Service (GSPS) to the general public and private enterprises and if so, the details thereof including the date of rollout and the categories of services offered; (b) whether the Government has prescribed any guidelines or eligibility criteria for citizens and private organisations to avail the GSPS services and if so, the details thereof; (c) whether the charges for GSPS devices and call/data usage have been finalised by BSNL and if so, the details thereof; (d) whether the Government plans to regulate the tariff to ensure affordability and if so, the details thereof; and (e) whether the Government has taken any measures to ensure secure communication and prevent misuse of GSPS by unauthorised users and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceVande Bharat Train from Hosapete–Bellary to Bangalore
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 177 · Asked on 2026-02-11
Ministry: RAILWAYS
Member asked
(a) whether the Government is considering introduction of a Vande Bharat train from Hosapete–Bellary to Bangalore and a daily train between Chennai and Mumbai via Bellary–Hosapete and if so, the details thereof; (b) whether the Government is considering to extend the Mumbai–Gadag and Solapur–Gadag trains up to Bellary and if so, the details thereof; and (c) the details of the timeline fixed for the introduction of the above trains?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Passenger Facilities for Bardoli Lok Sabha Constituency
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 178 · Asked on 2026-02-11
Ministry: RAILWAYS
Member asked
(a) whether any plans/schemes are proposed to enhance railway passenger facilities, introduce new rail services and provide stoppages of existing trains at the railway stations falling under Bardoli Lok Sabha Constituency of Gujarat; (b) if so, the details of such plans/schemes along with the estimated cost and the time-frame for their implementation, State-wise and if not, the reasons therefor; and (c) the details of the steps proposed by the Government in future for the development of railway infrastructure in the said region?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceQuality of Foodgrains in PDS
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 179 · Asked on 2026-02-11
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether the Government has received any reports/complaints regarding the quality of foodgrains supplied under the Public Distribution System (PDS) in Telangana during the last three years and the current year and if so, the details thereof; (b) the details of inspections/quality checks conducted by Central agencies/ Food Corporation of India (FCI) and the number of instances of quality deviations found in respect of supplies to Telangana, year-wise; (c) the details of action taken by the Government including advisories issued and corrective measures undertaken in coordination with the State Government against erring entities, if any; and (d) the steps taken by the Government to improve quality assurance, transparency and end-to-end monitoring of the PDS supply chain in Telangana?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEffective Implementation of Flagship Schemes
starredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 180 · Asked on 2026-02-11
Ministry: PLANNING
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware of gaps in coordination and effective implementation of flagship schemes in Western Uttar Pradesh; (b) if so, the details of the steps taken to improve inter-ministerial coordination and monitoring of schemes in the region; (c) whether similar implementation gaps exist in other parts of the country; and (d) if so, the details of the measures undertaken at the National level to ensure timely and effective delivery of Government programmes/schemes?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational Bio Energy Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1841 · Asked on 2026-02-11
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) the measures being taken by the Government to ensure that the National Bio Energy Programme is aligned with India’s clean energy targets and sustainable development goals particularly in States expanding their renewable-energy capacity such as Rajasthan; (b) the steps being undertaken to ensure that the opening of previously restricted areas for oil and gas exploration do not adversely affect marine ecosystems particularly in the Bay of Bengal and Arabian Sea and the manner in which the similar concerns being addressed for land-based bio energy projects; and (c) the manner in which the National Bio Energy Programme is expected to promote sustainable growth in rural regions along with the specific support proposed for communities in districts such as Jhalawar–Baran to facilitate their transition to cleaner energy solutions?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFair Price Shops in the State of Uttar Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1842 · Asked on 2026-02-11
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) the total number of Fair Price Shops (FPS) and the number of e-PoS enabled Fair Price Shops (FPS) in the State of Uttar Pradesh; (b) whether disruption due to poor internet connectivity in the remote areas in eastern UP including that of Mau and Ballia districts have adversely impacted the real-time data verification process at FPSs; (c) if so, whether Biometric failures due to wornout fingerprints, challenges of biometric authentication (fingerprint recognition) have adversely impacted labourers and elderly people; and (d) if so, the details thereof including the steps taken by the Government to resolve the problems being faced by the beneficiaries of PDS?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGreen Ammonia Auction
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1843 · Asked on 2026-02-11
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) the details of the total quantity of green hydrogen is specifically earmarked for fertiliser use given that the Mission targets 5 million tonnes of green hydrogen by the year 2030 while only 0.5 million tonnes would replace all imported ammonia for phosphatic fertilisers; (b) the details of the winning bidders, discovered prices and committed off takers of the 13 planned green ammonia auctions aggregating 7.24 lakh MT/year, auction-wise; and (c) the quantity of Green Hydrogen Gas (GHG) emissions would be reduced by replacing the current 2.5 MMT of imported grey ammonia given that fertiliser production contributes less than 1% of India’s total GHG emissions, it is estimated to emit around 6 MT annually?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStudies to Assess the Impact of Extreme Weather Conditions
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1844 · Asked on 2026-02-11
Ministry: EARTH SCIENCES
Member asked
(a) whether the Government has conducted any studies and research to assess the impact of extreme weather conditions caused by climate change and if so, the details thereof; (b) the details of programmes and schemes launched by the Government for mitigation of the impact of these extreme weather conditions based on the results of the above studies and research along with the targets and outlay earmarked for each of these programmes and schemes during each of the last five years and the current year and the actual achievements and expenditure incurred, year-wise; and (c) whether Indian Council of Agricultural Research (ICAR), Council of Scientific & Industrial Research (CSIR) and Indian Council of Medical Research (ICMR) and their institutions are also being involved in the studies and research for synergy and convergence of efforts and for development of holistic migration strategies and policies since food crops and agri-produce along with human health are also getting impacted due to these extreme weather conditions and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational e-Governance Division
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1845 · Asked on 2026-02-11
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
Saptagiri Sankar Ulaka, Namdeo Kirsan
(a) the number of public-private partnership proposals received, approved and the value of investment mobilised; (b) whether outcome Key Performance Indicators (KPIs) have now been finalised in the light of recent National e-Governance Division (NeGD) report flags absence of standardised outcome KPIs and if so, the details of KPI list and baselines; (c) the details of social infrastructure projects (schools, hospitals, anganwadis) planned and executed using Gati Shakti layers, Ministry and State-wise list; and (d) whether the Government has identified specific projects that have exceeded their original timelines due to land acquisition and forest clearance hurdles and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProjects under ECMS in Uttar Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1846 · Asked on 2026-02-11
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) the number of proposals received, approved and rejected under the Electronics Component Manufacturing Scheme (ECMS) for projects located in Uttar Pradesh since the launch of the Scheme, tranche-wise; (b) the details of distribution of approved ECMS projects in the said State, component-category-wise and district-wise; (c) the total investment committed, incentives approved and incentives disbursed for such projects along with the district-wise employment generation committed and achieved; (d) the number of proposals rejected or pending with the principal reasons recorded including localisation thresholds, technology readiness or financial viability; and (e) the steps taken by the Government to promote ECMS-based electronics component clusters and improve participation of manufacturers from Uttar Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDigitalization of Ration Cards
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1847 · Asked on 2026-02-11
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether the Government has implemented a process of digitizing ration cards to bring transparency to the Public Distribution System (PDS), eliminate fake/duplicate ration cards and ensure uninterrupted foodgrain supply to beneficiaries; (b) if so, the number of ration cards digitized in the Country particularly in Madhya Pradesh during the last three years and a result the number of fake or ineligible ration cards cancelled; and (c) whether the Government has made any special arrangements to address the difficulties faced by the elderly, persons with disabilities, those in remote areas and digitally disadvantaged beneficiaries during the digitization process and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceClosure and Merger of Post Offices in Kasaragod
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1848 · Asked on 2026-02-11
Ministry: COMMUNICATIONS
Member asked
(a) whether the Government proposes to close or merge long-standing sub-post offices and branch post offices in Kasaragod district, including Talankara, Uppala Gate and Hosbettu, citing revenue considerations and if so, the details thereof; (b) whether it is a fact that these post offices serve coastal and rural populations with limited access to banking and digital services and if so, the details thereof; (c) whether the impact on small savings schemes, pension disbursement and financial inclusion has been assessed and if so, the details thereof; (d) whether public protests and representations from local bodies and employees' organisations have been received opposing such closures and if so, the details thereof; and (e) the steps taken or proposed to ensure continuity of essential postal services in remote and economically weaker areas?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAspirational Districts Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 1849 · Asked on 2026-02-11
Ministry: PLANNING
Member asked
(a) the criteria and socio-economic indicators that are used for the selection of districts under the Aspirational Districts Programme; (b) the details of the parameters and key indicators like health, education, nutrition, agriculture, infrastructure and financial inclusion that are used to assess the progress of development in the aspirational districts; (c) whether regular studies/evaluations are being carried out/ conducted by the Government to monitor and measure the progress regarding implementation of the Aspirational Districts Programme; and (d) if so, the key findings of such studies and the details of the corrective measures that have been taken in the implementation of the programme based on these findings?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.