Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 851–875 / 34,220
Nuclear Energy Mission & Bharat Small Modular Reactors
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2841 · Asked on 2026-08-05
Ministry: ATOMIC ENERGY
Member asked
Krishna Prasad Tenneti, Yaduveer Wadiyar, Sanjay Jaiswal, Vishnu Dayal Ram
(a) the details of milestones under the Nuclear Energy Mission since the ₹20,000 crore allocation for Bharat Small Modular Reactors (SMRs) to reach 100 GW capacity by 2047; (b) the status of the 220 MW Bharat SMRs 55 MW SMRs and BARC-engineered High-Temperature Gas-Cooled Reactor for hydrogen production; (c) whether Shanti Swarup Bhatnagar-led reforms under the Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India Act, 2025 are implemented to permit regulated private sector participation and if so, the details thereof; and (d) the details of roadmap to operationalise five indigenous SMRs by 2033 including progress in manufacturing advanced reactor-vessel alloys via domestic industrial partnerships?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNetwork Connectivity Blackspots in Wayanad Parliamentary Constituency
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2842 · Asked on 2026-08-05
Ministry: COMMUNICATIONS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has taken action to improve coverage in network connectivity blackspots in Wayanad Lok Sabha Constituency and if so, the details thereof; (b) the details of locations with weak or no network connectivity in Wayanad Lok Sabha Constituency including Particularly Vulnerable Tribal Groups PVTG villages; (c) the details of new sites, as well as existing sites being considered for upgradation under the 4G Saturation Project in Wayanad Lok Sabha Constituency; (d) whether the Government has taken initiatives to strengthen disaster resilient telecommunication infrastructure and if so, the details thereof; and (e) whether the Government proposes to deploy Cell on Wheels in Wayanad Lok Sabha Constituency to improve disaster response and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceABSS in Bhagalpur Lok Sabha Constituency, Bihar
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2843 · Asked on 2026-08-05
Ministry: RAILWAYS
Member asked
(a) the name of railway stations selected under the Amrit Bharat Station Scheme (ABSS) in Bhagalpur Lok Sabha Constituency, Bihar along with the status of their current progress; (b) the work being done for development of passenger amenities, Divyang friendly facilities, escalators, lifts, waiting rooms and parking at Bhagalpur, Kahalgaon, Pirpainti, Naugachia and other major stations; (c) the steps taken/being taken by the Government to connect Bhagalpur railway station with multi-modal transport, smart station facilities and better rail connectivity; and (d) the likely impact of these works on tourism, trade, employment and convenience of passengers in the Bhagalpur region?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Development Projects in Mathurapur Lok Sabha Constituency, West Bengal
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2844 · Asked on 2026-08-05
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) the details of funds allocated since 2022-23 for railway development works and projects in the Mathurapur Lok Sabha Constituency, West Bengal, Scheme and year-wise; (b) the details of the actual expenditure incurred against the funds allocated during the said period, year and scheme-wise; (c) the physical and financial progress achieved in respect of the works sanctioned in the said Constituency along with their present status and expected date of their completion, project-wise; and (d) the steps taken/being taken by the Government to ensure timely implementation of railway projects and optimum utilisation of the allocated funds?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRepresentation from Central Government Employees' Association
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2845 · Asked on 2026-08-05
Ministry: PERSONNEL, PUBLIC GRIEVANCES AND PENSIONS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has received any representation from the Central Government Employees' Association to frame a comprehensive policy to ensure posting of Government employees or transfer on one's request at the same or nearby places of posting of their spouses to manage both family and office work smoothly and to elude financial burden of managing two establishments and if so, the details thereof along with the action taken or proposed to be taken by the Government on the said requests; and (b) if not, whether such requests are likely to be considered to implement in future and if so, the details thereof along with the time by which decision in this regard is likely to be taken?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Infrastructure Development in Telangana and Tamil Nadu
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2846 · Asked on 2026-08-05
Ministry: RAILWAYS
Member asked
(a) whether the Government has allocated adequate funds for railway infrastructure development in Telangana and Tamil Nadu and if so, the details of allocation and utilisation of funds, year-wise; (b) whether new railway routes and expansions are expected to reduce congestion and improve passenger and freight movement in Telangana and Tamil Nadu and if so, the details thereof including projected outcomes; (c) whether land acquisition, environmental clearances and regulatory approvals are causing delays in railway projects in Telangana and Tamil Nadu and if so, the details thereof and steps taken to resolve the issue/expedite the process; (d) whether coordination issues between Central and State authorities have impacted progress of railway projects and if so, the details thereof including the corrective measures taken; (e) whether Government proposes to formulate a time-bound action plan to complete all pending railway projects and new routes in Telangana and Tamil Nadu and if so, the details thereof including the implementation roadmap; (f) whether Government has conducted surveys for new railway routes in Telangana and Tamil Nadu and if so, the details thereof including number of surveys, proposed routes and status of approvals; (g) whether Government has introduced new train services on newly developed or upgraded routes in Telangana and Tamil Nadu and if so, the details thereof including the passenger benefits achieved; and (h) whether doubling projects in high-density routes are progressing as per schedule in country and if so, the details thereof including the bottlenecks, if any?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInclusion of Purulia under the Aspirational District Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2847 · Asked on 2026-08-05
Ministry: PLANNING
Member asked
(a) whether the Government has any proposal to include Purulia district of West Bengal under the Aspirational District Programme considering its backward socio-economic indicators, large Scheduled Tribe population, drought-prone conditions, inadequate healthcare infrastructure, educational challenges and high levels of poverty and if so, the details thereof; (b) whether the Government has conducted any assessment of Purulia's eligibility for inclusion under the Programme and if so, the details and the present status thereof; and (c) if not, whether the Government will consider including Purulia in the Aspirational District Programme in view of its developmental needs and strategic importance in the Jangalmahal region?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRestoration of Trains in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2848 · Asked on 2026-08-05
Ministry: RAILWAYS
Member asked
(a) the details of the list of trains that were cancelled during the COVID-19 period including their route, frequency and type of service in Andhra Pradesh; (b) the details of the current status of each cancelled train indicating whether it has been restored/partially restored/ to be reinstated, including the reasons for any delay; (c) the details of the estimated number of passengers affected due to non-restoration of these trains including daily and annual ridership per route; (d) whether any proposals or requests have been received for restoration of these trains and if so, the details thereof including the current status of such proposals; (e) the details of the alternative arrangements, if any, provided to passengers during the period of non-restoration; and (f) the details of the plan and tentative timeline to restore all COVID-cancelled trains in Andhra Pradesh particularly those serving major towns, district headquarters and key intra-State connectivity routes?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCompanies Selected under SIGHT Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2849 · Asked on 2026-08-05
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) the details of the number of proposals received and approved under each component of the Strategic Interventions for Green Hydrogen Transition (SIGHT) Programme since its inception, State and year-wise; (b) the list of companies/implementing entities selected under the SIGHT Programme along with the locations of their green hydrogen and electrolyser manufacturing facilities; (c) the details of the amount of production achieved of electrolysers and green hydrogen by selected companies since approval, company and year-wise; (d) the details of the incentives eligible and incentives disbursed under the SIGHT Programme, company and year-wise; and (e) the details of the challenges and bottlenecks observed in the implementation of the SIGHT Programme and the steps taken by the Government to address such challenges?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExpress Train Service between Sikar-Jhunjhunu-Delhi
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2850 · Asked on 2026-08-05
Ministry: RAILWAYS
Member asked
(a) whether the Government proposes to introduce a new high-speed express train or Vande Bharat Express train in the morning and evening on the Sikar-Jhunjhunu-Delhi rail route, in view of its religious importance, public aspirations, fast/convenient rail connectivity and the continuously increasing number of passengers at various religious sited located in the Shekhawati region of Rajasthan; (b) if so, the details thereof along with the proposed timeline; and (c) if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCalling Name Presentation (CNAP) System
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2851 · Asked on 2026-08-05
Ministry: COMMUNICATIONS
Member asked
(a) the current status and rollout timeline of the Calling Name Presentation (CNAP) system nationwide; (b) the details of impact on spam/fraud calls so far; and (c) the time by which CNAP to be extended to the approximately 250 million 2G subscribers currently excluded from the pilot?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProgress of Domestic Semiconductor Manufacturing Plants
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2852 · Asked on 2026-08-05
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) the details of progress made in establishing domestic semiconductor manufacturing plants; (b) the status of projects approved under the semiconductor manufacturing incentive scheme and the expected timelines for operationalization; (c) the details of steps being taken by the Government to address challenges in semiconductor production, such as skilled workforce shortages and supply chain constraints; and (d) the impact of global trade restrictions on India’s semiconductor manufacturing sector?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNew Railway Line Projects in Tamil Nadu
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2853 · Asked on 2026-08-05
Ministry: RAILWAYS
Member asked
(a) whether Government has sanctioned new railway line projects in Tamil Nadu in recent years and if so, the details thereof including total length, cost, and districts covered; (b) whether limited portion of the sanctioned railway lines has been completed till now and if so, the details thereof including the reasons for delay and timelines for its completion; (c) whether Government has undertaken railway expansion projects including doubling, gauge conversion and multi-tracking in Tamil Nadu and if so, the details thereof including the current status; (d) whether Government has identified unserved or under-served districts in Tamil Nadu for new railway connectivity and if so, the details thereof including the action taken; and (e) whether ongoing railway projects are aimed at improving connectivity to industrial and port regions in Tamil Nadu and if so, the details thereof including the expected economic benefits?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMining Sector Reforms and Mineral Exploration
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2854 · Asked on 2026-08-05
Ministry: MINES
Member asked
Basavaraj Bommai, Biplab Kumar Deb
(a) the major mining sector reforms undertaken during the last one year to promote ease of doing business, accelerate mineral exploration and facilitate timely operationalisation of mining projects; (b) the progress made in exploration of critical and strategic minerals by the Geological Survey of India during Field Season 2025–26 including the major achievements recorded; (c) the measures taken to encourage participation of States and private agencies in mineral exploration and auction of mineral blocks; and (d) the details of the steps taken by the Government to strengthen India's long-term mineral security and support the objectives of Aatmanirbhar Bharat and Viksit Bharat 2047?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAspirational Districts Programme in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2855 · Asked on 2026-08-05
Ministry: PLANNING
Member asked
Sanjay Deshmukh, Sanjay Jadhav
(a) the number of blocks selected under the Aspirational Blocks Programme in the country especially in Maharashtra; (b) the criteria adopted for the selection of these blocks along with the details of the financial and technical assistance provided for the development of these blocks; (c) the arrangements made by the Government to evaluate the impact of the programme along with the latest data of poverty rate assessed under the said evaluation in rural areas of Maharashtra including Parbhani district; (d) the details of progress made in poverty alleviation during the last five years particularly in Parbhani Lok Sabha Constituency of Maharashtra along with the details of major schemes being implemented by the Government for poverty alleviation; and (e) the details of the special mechanism put in place for identifying and supporting the extremely poor families in Maharashtra including Washim-Yavatmal, Lok Sabha Constituency?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSkilling for Railway Freight and Logistics Ecosystem
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2856 · Asked on 2026-08-05
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has formulated any strategy to develop a skilled workforce to support the expanding railway freight and logistics ecosystem and, if so, details thereof; (b) the number of personnel trained during the last three years in freight operations, multimodal logistics, container handling, warehousing and digital logistics systems, year and zone-wise; (c) the details of dedicated training and certification programmes for private logistics operators, terminal operators and container train operators including industry partners, institutions engaged and number of persons trained thereunder; (d) whether a formal assessment of manpower demand in the railway freight and logistics sector has been conducted, if so, the skill gaps identified and steps proposed to address them; (e) whether a dedicated skill qualification framework aligned with the National Skills Qualifications Framework (NSQF) has been developed for railway freight and logistics and if so, the details of occupational roles covered and number of persons certified; and (f) steps taken/proposed to be taken by the Government to address future skill requirements arising from railway freight expansion?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceContribution of Mumbai as Film, Television, Digital Media and Broadcasting Hub
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2857 · Asked on 2026-08-05
Ministry: INFORMATION AND BROADCASTING
Member asked
(a) whether the Government has undertaken any assessment of the contribution of Mumbai, as the country's film, television, digital media and broadcasting hub to the growth of India's media and entertainment sector during the last three years; (b) if so, the details of schemes, financial assistance and policy initiatives implemented for promotion of film production, broadcasting infrastructure, digital media, animation, visual effects, gaming and content creation in Mumbai; (c) whether the Government has received representations from stakeholders regarding the need for modern media infrastructure, single-window facilitation and promotion of international film production in Mumbai and if so, the details thereof; and (d) the details of measures taken or proposed to be taken by the Government to strengthen Mumbai's position as a global centre for media, entertainment, broadcasting and creative industries while promoting employment generation, investment and technological innovation?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceReforms in Coal Sector
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2858 · Asked on 2026-08-05
Ministry: COAL
Member asked
(a) the key reforms undertaken in the coal sector to enhance transparency, efficiency and scientific mining during the last five years including the transition to auction-based allocation and commercial coal mining; (b) the steps taken by the Government to modernise the coal ecosystem through initiatives such as coal washing, digital mine monitoring, coal gasification, underground coal gasification and integration of renewable energy and carbon capture projects; (c) the contribution of coal to India’s energy security and industrial growth particularly in power, steel, cement and infrastructure sectors while meeting climate and sustainability commitments; and (d) the progress achieved in increasing domestic coal production, improving logistics under Pradhan Mantri-Gati Shakti Plan reducing import dependence and the proposed role of mechanisms such as a coal exchange in strengthening supply chain efficiency and price discovery?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMobile Internet Coverage in Rural and Urban Areas of Rajasthan
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2859 · Asked on 2026-08-05
Ministry: COMMUNICATIONS
Member asked
(a) the percentage of mobile internet coverage in the rural and urban areas of Rajasthan at present along with the details thereof; (b) the current status of the BharatNet scheme and the number of beneficiaries covered under the said scheme; (c) the time by which 100 per cent internet coverage is likely to be achieved in Rajasthan; (d) whether internet facility is still not available in several remote areas of Rajasthan and if so, the details thereof; and (e) whether the Government has taken any steps to initiate mobile internet facilities in these areas and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceHarassment of the Ration Card Holders
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2860 · Asked on 2026-08-05
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
We have not ingested the asking members for this question.
(a) whether the Government proposes in the eventualities like non–availability of network, server remaining down, mismatch of fingerprints, alternative arrangements like supplying ration by inserting Aadhaar Numbers should be ensured to minimize harassment of the ration card holders; (b) if so, the details thereof; (c) whether any Government order regarding not depriving any ration card holder in such a situation is issued; and (d) if so, the details thereof and if not, the details of the problems in the issuance of a formal order?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceChallenges in Integrating Renewable Energy
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2861 · Asked on 2026-08-05
Ministry: NEW AND RENEWABLE ENERGY
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware that Visakhapatnam is facing significant challenges in integrating renewable energy due to grid curtailment, intermittency, land acquisition constraints for large-scale solar projects, limited energy storage infrastructure and seasonal weather variability; (b) if so, whether these challenges are resulting in clean energy losses and increased dependence on thermal power to meet the city's growing electricity demand; (c) if so, the measures taken or proposed by the Government to strengthen grid infrastructure, promote energy storage systems and facilitate renewable energy expansion in Visakhapatnam; and (d) whether the Government proposes any special financial or policy support for renewable energy and storage projects in Andhra Pradesh particularly in Visakhapatnam and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceElectrification Broad-Gauge Network of Railways
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2862 · Asked on 2026-08-05
Ministry: RAILWAYS
Member asked
(a) the present status of railway electrification across the Indian Railways network; (b) whether all Broad Gauge routes have been electrified or are under electrification and if so, the details thereof; (c) whether the Government has set a target for Indian Railways to achieve 100 per cent electrification of its broad-gauge network by financial year 2026-27; (d) if so, the current percentage of electrification achieved and the remaining route-kilometres yet to be electrified; (e) the details of renewable energy projects including solar power installation, implemented by Indian Railways during the last three years; (f) the steps taken by the Government to source renewable energy for traction power, the capacity already tied up; (g) the timeline for meeting the renewable / clean-energy requirement for Railways; and (h) the measures taken to reduce carbon emissions and achieve the target of making Indian Railways a net-zero carbon transporter?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMPLADS Monitoring Centre
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2863 · Asked on 2026-08-05
Ministry: STATISTICS AND PROGRAMME IMPLEMENTATION
Member asked
(a) whether MPLADS facilitation and monitoring centre is to be set up in each nodal district as per Para 9.5 of the Member of Parliament Local Area Development Scheme (MPLADS) Guidelines, 2023 and if so, the details thereof along with the number of such centres established in the country and the number of centres yet to be established; (b) whether the Government has issued directions to the concerned district administration and the State Nodal Authority on the proposal of the MP for establishing such a centre in the Union Territory of Dadra and Nagar Haveli and Daman and Diu (DNH&DD) and if so, the details along with the current status thereof; (c) whether monthly review meetings are being held regularly in the presence of the MP as per Para 4.5.9 of the MPLADS Guidelines and if so, the details thereof and if not, the districts where the said provision is not being complied with and the action taken thereon; and (d) whether the Government proposes to establish digital MPLADS facilitation and monitoring centres in all districts to enhance monitoring and transparency in the implementation of MPLADS works across the country and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRedevelopment of Hardoi Railway Station under ABSS
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2864 · Asked on 2026-08-05
Ministry: RAILWAYS
Member asked
(a) whether Hardoi Railway Station has been selected for redevelopment under the Amrit Bharat Station Scheme (ABSS) and if so, the details thereof; (b) the details of the sanctioned fund for the said project, along with the major components of the redevelopment works; (c) the details of present physical and financial progress of the said project including the percentage of work completed and the expenditure incurred so far; (d) the details of original and revised timelines fixed for the completion of the said project along with the reasons for delay; (e) whether the Government has modified the earlier original approved redevelopment/design plan of the said project and if so, the details thereof and if not, the reasons therefor; and (f) the details of revised project cost, the present status of execution and the expected date of completion?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceHygiene and Catering Services in Long-distance Trains in Tamil Nadu
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 2865 · Asked on 2026-08-05
Ministry: RAILWAYS
Member asked
G. Selvam, C.N. Annadurai, Rani Srikumar
(a) whether the Government has undertaken any assessment of the quality, hygiene and catering services provided in long-distance trains serving Tamil Nadu during the last three years and if so, the details thereof, year-wise; (b) the measures taken/to be taken by the Government to modernise base kitchens, strengthen quality control, introduce technology-enabled monitoring and improve food safety in trains originating from/passing through the said State; (c) whether the Government proposes to expand the availability of hygienic, nutritious and authentic South Indian meal options in long-distance trains operating in the Southern Railway zone and if so, the details thereof; (d) the details of inspections, passenger feedback mechanisms and corrective actions taken to improve onboard catering services; and (e) the further steps proposed/to be proposed to ensure safe, high-quality and affordable food for passengers travelling on long-distance trains in the said State?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.