Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 8,526–8,550 / 34,220
Status of Electrification of Households in Jamui
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2080 · Asked on 2026-02-12
Ministry: POWER
Member asked
(a) the status of the electrification of all households in the tribal hamlets (tolas) of Jamui Parliamentary Constituency; (b) the details of the electrified households under the Saubhagya scheme in Jamui Parliamentary Constituency; (c) the measures taken by the Government to provide electricity to the households in the deep forest areas using off-grid solar solutions; (d) the status of the availability of 24x7 power supply in the rural areas; and (e) whether the Government proposes to improve the power quality and voltage in the tail-end villages and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePRAGATI Irrigation Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2081 · Asked on 2026-02-12
Ministry: JAL SHAKTI
Member asked
Bhartruhari Mahtab, Rajiv Pratap Rudy, Bidyut Baran Mahato, Avimanyu Sethi, Nishikant Dubey, Hemant Savara, Vinod Kumar Bind, Kalyan Kale, Manish Jaiswal, Praveen Patel, Vijay Baghel, Krishna Prasad Tenneti, Mahima Kumari Mewar, P. P. Chaudhary, Manna Lal Rawat, Govind Karjol, Ravi Kishan, Pratap Chandra Sarangi, Brijesh Chowta, Anurag Sharma, Kamaljeet Sehrawat, Dineshbhai Makwana, Kamlesh Jangde
(a) the total number of irrigation and water resources projects currently being tracked on the Permanent Magnet Generator (PMG) system under Department of Water Resources along with their cumulative investment value, sector-wise, State/UT-wise including Chhattisgarh, Karnataka and project specific information for Dakshina Kannada district and Pali Lok Sabha Constituency of Rajasthan; (b) the number of projects reviewed under Pro-Active Governance and Timely Implementation (PRAGATI) platform including details of ongoing projects and commissioned projects along with their cost implications, State/UT-wise, including Chhattisgarh, Karnataka and Dakshina Kannada district, Rajasthan particularly Rajsamand Lok Sabha Constituency, Bihar and the status of projects related to the Hazaribagh and Ramgarh districts of Jharkhand under this platform; (c) whether there have been significant implementation bottlenecks relating to land acquisition, inter-State coordination, environmental clearances or fund flow and the manner in which PRAGATI-level oversight has helped to resolve them, if so, the details thereof; (d) the current status of resolution of issues/problems identified in the said projects such as land acquisition, rehabilitation and resettlement, fund release, contract management, inter-State coordination etc. and the details of issues resolved so far under the projects reviewed on the PRAGATI platform particularly the progress made in addressing pending issues in the Hazaribagh and Ramgarh districts and in reference to Karnataka and the extent to which such resolutions have facilitated timely execution of the irrigation and water resource projects; (e) the steps taken by the Government for the resolution of issues in the said projects; (f) the measures adopted to expand the irrigated area, improve drought resilience and strengthen farmer water security through the outcomes of PRAGATI-enabled governance; and (g) the details of the irrigation and water resource projects implemented in the tribal dominated Palghar district in Maharashtra and the funds allocated for the purpose during the last three years?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePromotion of Khadi and Village Industries in West Bengal
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2082 · Asked on 2026-02-12
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the initiatives undertaken by the Khadi and Village Industries Commission (KVIC) to promote khadi and village industries in West Bengal; (b) the current status of the Khadi and Village Industries Board in West Bengal and the number of artisans benefited from the Ministry’s schemes in the State; (c) the allocation of funds for the promotion of khadi products and marketing initiatives in West Bengal; and (d) whether the Government has introduced any special programs to support women artisans and entrepreneurs in the khadi and village industries sector in West Bengal and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRoll out of Digi Yatra
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2083 · Asked on 2026-02-12
Ministry: CIVIL AVIATION
Member asked
Amol Kolhe, Dhairyasheel Mohite Patil, Supriya Sule, Sanjay Dina Patil, Varsha Gaikwad, Bhaskar Bhagare
(a) whether the Government is aware that the roll out of Digi Yatra has been uneven and delayed across various airports in the country including in Maharashtra and if so, the details thereof; (b) the details of airports in Maharashtra where Digi Yatra is operational, under installation or yet to be approved along with the reasons for delay at major airports such as Mumbai, Pune and Nagpur; (c) the total number of Digi Yatra registrations, app downloads and actual users during the last two years in Maharashtra, airport-wise; (d) whether the utilisation levels justify the expenditure incurred in this regard and if so, the details thereof; (e) whether any time-bound assessment has been conducted to measure actual reductions in passenger entry and processing time for Maharashtra and if so, the findings thereof; and (f) whether the Government proposes to extend Digi Yatra to regional and UDAN airports in Maharashtra, if so, the timelines fixed and the funds allocated and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProjects approved under PMKSY
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2084 · Asked on 2026-02-12
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
Jugal Kishore, Bharatsinhji Dabhi, Nalin Soren, Mahima Kumari Mewar, Tapir Gao, Naba Charan Majhi, Anoop Pradhan, Manish Jaiswal, Balabhadra Majhi, Mala Rajya Laxmi Shah
(a) the details of the projects approved and completed under the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) since January 2025 till date in the State of Jharkhand including Hazaribagh and Ramgarh districts and Nabrangpur Constituency of Odisha including the investment made thereunder and the number of farmers benefited in the country including Nabrangpur Constituency of Odisha, Rajasthan and Jammu and Kashmir; (b) the details of the Cabinet approval for additional expenditure of Rs. 1,920 crore under PMKSY including establishment of fifty multi-product food irradiation units and hundred food testing laboratories, number of units/laboratories proposed or approved in Jharkhand and Odisha particularly in the said districts; and (c) the cumulative achievements made so far under the Pradhan Mantri Krishi Sinchayee Yojana in the country including Nabrangpur Constituency of Odisha and the impact of these achievements on agriculture-based economy, farmer's income and employment generation in Hazaribagh and Ramgarh districts of Jharkhand?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of PMAY-U in Anandpur Sahib
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2085 · Asked on 2026-02-12
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) the current status of houses sanctioned under Pradhan Mantri Awas Yojana – Urban (PMAY-U) for Kharar (Mohali) and Rupnagar Urban Local Bodies (ULBs) in Anandpur Sahib Lok Sabha Constituency; (b) whether it is a fact that several projects in these ULBs have remained at the foundation stage since 2022; (c) if so, the specific reasons for the delay in the release of Central assistance for these projects; and (d) the steps being taken by the Government to expedite the completion of these units for Economically Weaker Section (EWS) beneficiaries?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInfrastructure to Supply Natural Gas in Tamil Nadu
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2086 · Asked on 2026-02-12
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) the status of providing infrastructure to extend gas as a source of energy or feedstock in the entire State of Tamil Nadu; (b) whether any timeframe has been fixed for implementation of supplying natural gas pipelines to all the major cities and towns in the State, if so, the details thereof; and (c) the details of the present status of supplying gas through pipeline to cities and towns on demand, district-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWings India 2026
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2087 · Asked on 2026-02-12
Ministry: CIVIL AVIATION
Member asked
Pradeep Kumar Singh, Lumbaram Choudhary, Praveen Patel, Hemant Savara, Ananta Nayak, Khagen Murmu, Vishnu Dayal Ram, Krishna Prasad Tenneti, Anil Firojiya
(a) the number and value of Memoranda of Understanding (MoUs), Letters of Intent and commercial commitments announced during Wings India 2026; (b) the total number of these agreements that involved Indian airlines, airports, Maintenance, Repair and Operations (MROs) or Original Equipment Manufacturer (OEM) suppliers; (c) whether any timelines were fixed for conversion of such MoUs and commitments into binding contracts and if so, the details thereof; and (d) the institutional mechanism put in place for post-event monitoring of outcomes of Wings India 2026?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational SC-ST Hub Scheme in Odisha
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2088 · Asked on 2026-02-12
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the number of SC/ST entrepreneurs in Odisha who have benefited under various components of the National SC-ST Hub (NSSH) Scheme during the last three years and in 2025-26 so far, district and component-wise; (b) the details of Special Vendor Development Programmes (SVDPs), Mega Events and round-table discussions organised in Odisha under the Scheme, including locations, participation of CPSEs and outcomes in terms of vendor registrations and contracts awarded; (c) the value and share of public procurement from SC/ST-owned Micro and Small Enterprises (MSEs) in Odisha during the last five years, as recorded on the Micro, Small and Medium Enterprises (MSMEs) Sambandh portal along with its comparison with the mandated four per cent target; and (d) the measures being taken to address gaps in procurement uptake in Odisha and the expected timeline for achieving the mandated target under the Public Procurement Policy?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePerformance of MSMEs
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2089 · Asked on 2026-02-12
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the present status of Micro, Small and Medium Enterprises (MSMEs) in the country, including their contribution to employment, production, exports and GDP; (b) the Union Government schemes and initiatives being implemented to promote MSMEs, startups and entrepreneurship including financial assistance, credit support and technology adoption; (c) the measures taken to improve ease of doing business, reduce regulatory compliance burden and facilitate market access for MSMEs; (d) whether any steps have been undertaken to promote skill development, capacity building and innovation among MSMEs, particularly in rural and semi-urban areas; (e) the mechanisms in place to ensure monitoring, timely delivery of benefits and grievance redressal for MSMEs; and (f) the additional policy, financial and institutional measures proposed to further strengthen the MSME ecosystem, enhance competitiveness, promote sustainable growth and create employment opportunities nationwide?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceObjectives of National Smart Grid Mission
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2090 · Asked on 2026-02-12
Ministry: POWER
Member asked
Lumbaram Choudhary, P. P. Chaudhary, Ravi Kishan, Pratap Chandra Sarangi, Kamaljeet Sehrawat, Rajiv Pratap Rudy, Godam Nagesh, Nishikant Dubey, Bibhu Prasad Tarai, Vinod Kumar Bind, Kalyan Kale, Anoop Pradhan, Naba Charan Majhi, Ramesh Awasthi, Lavu Sri Krishna Devarayalu, Avimanyu Sethi, Praveen Patel, Krishna Prasad Tenneti, Dilip Saikia, Mahima Kumari Mewar, Manoj Tiwari
(a) the details of the key objectives of the National Smart Grid Mission (NSGM) and its alignment with India’s vision for a modernised and efficient power sector; (b) whether the Government has outlined the specific components and technologies involved in the NSGM, such as smart meters, energy storage and demand response systems and if so, the details thereof; (c) the challenges being faced in the implementation of the Mission including cost, interoperability, cyber security, capacity constraints of distribution utilities and the steps being taken by the Government to address these challenges; (d) the number of consumers benefited under NSGM projects, State/UT-wise and district-wise in Andhra Pradesh; (e) the smart grid projects approved and implemented in Andhra Pradesh under NSGM, district-wise including project locations and present status; (f) the funds allocated, released and utilised under the NSGM since inception, year-wise during the last three years, State/UT-wise and district-wise in Andhra Pradesh; and (g) the status of NSGM projects in Telangana including the number of smart meters sanctioned/installed, pilot smart grid projects undertaken and the impact on loss reduction billing efficiency and consumer services?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUpgradation of Airport Infrastructure
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2091 · Asked on 2026-02-12
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government has undertaken/proposes to undertake strengthening of passenger facilities and security-related infrastructure at airports in Telangana and if so, the details thereof; (b) the details of upgradation/modernisation works sanctioned, approved and executed during the last three years and the current year, airport-wise; (c) the details of the funds sanctioned, released and utilised for the said works, airport-wise; and (d) the timeline fixed for completion of the ongoing works, airport-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInitiatives by NSIC in Tamil Nadu
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2092 · Asked on 2026-02-12
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
We have not ingested the asking members for this question.
(a) the details of efforts and initiatives undertaken by the National Small Industries Corporation (NSIC) for the promotion and development of Micro, Small and Medium Enterprises (MSMEs) in Tiruchirappalli and Pudukkottai districts of Tamil Nadu during the last three years; (b) the number of entrepreneurs / MSME units benefited under various NSIC schemes in the said districts, scheme-wise; (c) whether NSIC has established or proposes to establish any training centres, facilitation desks, marketing support programmes or raw material assistance initiatives in the said districts; and (d) if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePMKSY-AIBP in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2093 · Asked on 2026-02-12
Ministry: JAL SHAKTI
Member asked
Kesineni Sivanath, B. K. Parthasarathi, Lavu Sri Krishna Devarayalu
(a) the details of the total number of projects approved under the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) including the Accelerated Irrigation Benefits Programme (AIBP) component and any other Union Government funded schemes including the name and type of each irrigation project (major, medium, minor, AIBP/PMKSY) in the country, State/UT-wise and district-wise for Andhra Pradesh; (b) the details of the funds allocated, sanctioned, released and utilised for these projects, project-wise, year-wise and State-wise; (c) the details of the physical progress and the current stage of completion of each of these projects including the projects under AIBP component, project-wise, State-wise and district-wise for Andhra Pradesh; (d) the details of the irrigation potential created and utilized through these projects so far; (e) whether any of the approved irrigation projects in Andhra Pradesh are delayed or stalled, if so, the reasons for such delays and the measures taken by the Government to expedite its completion; (f) the details of the number of Extension, Renovation and Modernisation (ERM) projects approved under the AIBP component along with the funds allocated and released for them, year-wise and State-wise; and (g) whether the Government has received any proposal from Andhra Pradesh for ERM irrigation projects under the AIBP component and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBeneficiaries Registered under PMAY-U in Chhattisgarh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2094 · Asked on 2026-02-12
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the number of beneficiaries registered along with the number of houses sanctioned and completed under the Pradhan Mantri Awas Yojana - Urban (PMAY-U) in Chhattisgarh during the last twelve months; (b) the number of beneficiaries registered along with the number of houses sanctioned and completed in Durg and Bemetara districts of Durg Lok Sabha Constituency; and (c) whether all the houses sanctioned under PMAY-U in Durg Lok Sabha Constituency are likely to be completed and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCost Escalation and Delays in Major GAIL (India) Limited Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2095 · Asked on 2026-02-12
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) the names of major projects currently being implemented by GAIL (India) Limited along with their originally approved completion dates and revised target dates, especially with reference to the Mumbai–Nagpur–Jharsuguda (MNJPL) Pipeline, Srikakulam–Angul Pipeline and the petrochemical project at Usar, Maharashtra; (b) the details of the originally sanctioned cost, the current revised cost and the percentage of cost escalation in respect of each of the said projects; (c) the details of the major reasons for delays in projects such as forest and environmental clearances, right of way regulatory approvals, poor performance of contractors or other reasons, project-wise; (d) whether time extensions have been granted to contractors due to delays and if so, the details of liquidated damages, imposed forfeiture of performance bank guarantees or any other penal action taken; (e) whether accountability has been fixed for the delays and cost escalations; and (f) whether a monitoring and penalty or incentive mechanism has been implemented to ensure timely execution of the said projects in future, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceIssues relating to Industrial Areas in Chandigarh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2096 · Asked on 2026-02-12
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) whether the Government has taken cognisance of the long-pending issues faced by industrial units in Chandigarh’s Industrial Area, including restrictive Floor Area Ratio (FAR) norms, defective land titles, leasehold constraints and widespread building violation and misuse notices, if so, the details thereof; (b) whether existing FAR limit of 0.75 has rendered industrial operations economically unviable, especially when compared to neighbouring industrial areas in Punjab and Haryana with FAR norms of 2.5 to 3.0 and whether Government proposes to rationalise it and if so, the details thereof; (c) whether the Government proposes to address defective titles arising from historical leasehold allotments and consider conversion of industrial properties from leasehold to freehold and if so, the details thereof; (d) whether retrospective amendments to the Chandigarh Estate Rules relating to penalties have been reviewed for legal validity and if so, the details thereof; (e) whether a one-time amnesty scheme for building violations and adoption of MSME Development Act, 2006 for permitting service activities are under consideration, if so, the details thereof; and (f) the timeline fixed for resolving these issues?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceModernisation of Aviation Navigation
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2097 · Asked on 2026-02-12
Ministry: CIVIL AVIATION
Member asked
(a) whether it is a fact that Airports Authority of India (AAI) is considering an investment of over Rs. 15,000 crores to modernize aviation navigation and surveillance technology at various airports across the country; (b) if so, the details thereof along with the details of the breakdown of the said investment/funds decided in this regard; (c) whether AAI is also taking proactive steps to fill vacancies of technical roles across various airports and if so, the details thereof; and (d) whether AAI is further considering establishment of a dedicated and skilled cyber-security division and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of AMRUT across the Country
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2098 · Asked on 2026-02-12
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the details of the Atal Mission for Rejuvenation and Urban Transformation (AMRUT), including fund sharing pattern between the Centre and States; (b) the details of the cities currently under AMRUT across the country; (c) the details of fund allocated and utilized across the country under AMRUT, project and State-wise; (d) whether specific guidelines have been fixed to monitor and supervise the implementation of AMRUT at State level; and (e) if so, the details thereof;
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Har Khet Ko Paani in Karnataka
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2099 · Asked on 2026-02-12
Ministry: JAL SHAKTI
Member asked
(a) the number of irrigation projects sanctioned and completed in Karnataka under the Har Khet Ko Paani component of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) during the last five years with specific reference to Dakshina Kannada district; (b) the total irrigation potential created or restored in Dakshina Kannada district through surface and ground water schemes; (c) the amount of Union Government assistance sanctioned, released and utilised for these projects, year-wise; (d) the number of water bodies in Karnataka including those in Dakshina Kannada district selected for funding under the Repair, Renovation and Restoration (RRR) component of Har Khet Ko Paani and the present status of their renovation; and (e) whether the Government has undertaken any assessment of water use efficiency, irrigation coverage or cropping intensity improvements in Dakshina Kannada under Har Khet Ko Paani, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOperational Mega Food Parks in Karnataka
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2100 · Asked on 2026-02-12
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) the Mega Food Parks and agro-processing clusters that have become operational in Karnataka and Bengaluru during the last three years along with their locations; (b) the number of processing units those have commenced production in these parks during the said period and the share of such units belonging to micro, small and medium enterprises; (c) whether delays in last-mile infrastructure, cold storage, warehousing or common processing facilities have affected the utilisation of these parks, if so, the details thereof; (d) the steps being taken by the Government to attract private investment and improve occupancy in under-utilised food parks in Karnataka; and (e) the details of direct and indirect employment generated through these facilities including in Bengaluru?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of ARHCs in Rajasthan
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2101 · Asked on 2026-02-12
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
Mahima Kumari Mewar, Bhojraj Nag, Khagen Murmu
(a) the income group identified and targeted under the Affordable Rental Housing Complexes (ARHCs) vertical of the Pradhan Mantri Awas Yojana – Urban (PMAY-U) 2.0 in the country, particularly in Rajasthan; (b) whether the Government has set any targets in terms of the number of private/public agencies and the estimated time for their enrolment for the construction of ARHCs; and (c) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCoverage and Impact of Unified Pipeline Tariff
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2102 · Asked on 2026-02-12
Ministry: PETROLEUM AND NATURAL GAS
Member asked
Vishweshwar Hegde Kageri, Anurag Sharma, Ramesh Awasthi, Bhojraj Nag, Kamaljeet Sehrawat
(a) the details of the total coverage of operational natural gas pipelines operating under the Unified Pipeline Tariff regime, district-wise; (b) whether districts of the Bundelkhand region, particularly Jhansi and Lalitpur in Uttar Pradesh are presently covered or proposed to be covered and if so, the details thereof; (c) the increase in operational natural gas pipeline length achieved during the last year along with the district-wise details of additional pipeline length currently under execution or planned including timelines for completion affecting the Jhansi–Lalitpur region; (d) the coverage under the Unified Pipeline Tariff regime during the last year, highlighting inclusion of backward and aspirational districts, State/UT-wise; (e) whether the Government proposes to increase the Unified Pipeline coverage, if so, the details thereof, State/UT-wise; and (f) whether the Government has assessed the impact of the Unified Pipeline Tariff regime on reducing transportation costs, improving gas accessibility for households, MSMEs and food processing units and promoting industrial growth in regions like Jhansi and Lalitpur, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCoal-based Thermal Power Plants
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2103 · Asked on 2026-02-12
Ministry: POWER
Member asked
(a) the number of coal-based thermal power plants in the country during the last ten years, State-wise and year-wise along with their installed, operational, and idle/non-operational capacities; (b) the number of such plants where Continuous Emission Monitoring Systems (CEMS) have been installed and are operational, and the timelines for making CEMS functional in remaining plants; (c) the details of violations of prescribed emission norms, including penalties imposed, realised and pending, State-wise and year-wise; (d) the present status of modernisation and efficiency upgradation of coal-based thermal power plants, including conversion or retrofitting with supercritical and ultra-supercritical technologies; and (e) the measures taken by the Government to ensure compliance with emission standards, strengthen real-time monitoring and reporting and improve enforcement and accountability in coal-based thermal power plants?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceVariations on Pilot Duty Norms
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 2104 · Asked on 2026-02-12
Ministry: CIVIL AVIATION
Member asked
(a) whether it is a fact that the Government had previously given certain dispensation/variations to the airlines on pilots duty and rest period norms and if so, the details thereof; (b) whether the relief on pilot's duty norms has been withdrawn so that the safety is not compromised, if so, the details thereof and if not, the reasons therefor; and (c) the steps being taken/proposed to be taken by the Directorate General of Civil Aviation (DGCA) for a periodic review of the recruitment of pilots by airlines?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.