Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 7,301–7,325 / 34,220
One Nation, One Grid, One Price Initiative
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3255 · Asked on 2026-03-12
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) the details regarding the present status of the One Nation, One Grid, One Price initiative across the country, State/UT-wise and especially in Andhra Pradesh; (b) the details regarding the total number of operational natural gas pipelines covered under the initiative as on date across the country, State/UT-wise and especially in Andhra Pradesh; (c) the details regarding the total number of beneficiaries covered under the initiative including households, industries, transport and other user categories, State/UT-wise especially in Andhra Pradesh; (d) the details regarding the total funds allocated, sanctioned, released and utilised for implementation of the initiative since its inception; and (e) whether the Government has taken steps to bring all operational pipelines under the ambit of the initiative and if so, the details thereof along with the proposed timeline for achieving full national coverage?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePoor Quality of Work due to Low Bids
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3256 · Asked on 2026-03-12
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether there is a recent trend of road contractors quoting low bids of up to forty-eight per cent less than the estimated project cost largely due to aggressive bidding which usually has a direct bearing on the quality of work; (b) whether it is a fact that a number of complaints have been reported recently about the collapse of National Highways and flyovers under construction particularly in Kerala; and (c) if so, the details thereof and the action taken against the contractors in these cases?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMoringa-based Product Industry
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3257 · Asked on 2026-03-12
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
We have not ingested the asking members for this question.
(a) the estimated market value of India’s moringa-based product industry and the growth rate recorded during the past five years; (b) the specific initiatives undertaken by the Government to promote the export of value-added moringa products, including key export destinations and export volumes over the same period; (c) whether the Government is aware of the significant business potential of moringa-based products in Karur district of Tamil Nadu, which industry estimates value at ₹5,000 crore to ₹6,000 crore annually, if so, the details thereof; and (d) the steps being taken by the Government to support value addition, processing infrastructure and market linkages for moringa growers and entrepreneurs in Karur, including financial and technical assistance extended under schemes such as the Pradhan Mantri Formalisation of Micro Food Processing Enterprises (PMFME) and Pradhan Mantri Kisan SAMPADA Yojana (PMKSY)?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConstruction of Greenfield Expressways
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3258 · Asked on 2026-03-12
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the number of Greenfield Expressways currently being constructed in the country, State-wise; (b) the number of Greenfield Expressways proposed or under construction in Rajasthan, including name of districts through which they pass, their total length and the total investment made thereon, district-wise; (c) the total length of National Highways constructed or upgraded under the Bharatmala Project in the country, State-wise and the investment made thereon, particularly district-wise in Rajasthan; (d) the details of assessment made regarding the utility of the Delhi–Vadodara–Mumbai and Amritsar–Jamnagar Green Corridor Expressways in terms of economic development, mining, industry and connectivity; and (e) whether the Government has any specific plan for ensuring safe and convenient connectivity on feeder roads connecting villages to National Highways, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceClaims under Forest Rights Act
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3259 · Asked on 2026-03-12
Ministry: TRIBAL AFFAIRS
Member asked
(a) the details of the number of Forest Rights Act titles granted in last five years, year-wise; (b) the details of the area of forest land that was distributed in the last three years; and (c) whether the Government has standardised norms for data collection in the country, if so, the details thereof, State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStrengthening of Air Connectivity
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3260 · Asked on 2026-03-12
Ministry: CIVIL AVIATION
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has conducted any survey for potential airstrips/helipads to strengthen air connectivity near Dahod Lok Sabha Constituency under the Regional Connectivity Scheme (RCS) – UDAN scheme and if so, the details thereof; (b) whether any plan has been prepared for introduction of new flights keeping in view tourism and industrial development in the region and if so, the details thereof; (c) whether any coordination has been established with the State Government of Gujarat in this regard and if so, the details thereof; and (d) whether any feasibility study has been conducted for the same and if so, the findings thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceTap Connections without Water Supply
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3261 · Asked on 2026-03-12
Ministry: JAL SHAKTI
Member asked
We have not ingested the asking members for this question.
(a) the details of tap connections under the Jal Jeevan Mission having no water supply due to lack of water availability, State-wise; (b) whether the Government has proposed or propose to provide financial and technical support for areas with low coverage or no water supply to bridge the gap and if so, the details thereof; and (c) the details of households that have no access to tap water in the country as of now, State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNarmada Canal Project in Barmer-Balotra Area
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3262 · Asked on 2026-03-12
Ministry: JAL SHAKTI
Member asked
(a) the current status of the works under the second and third phases of the Narmada Canal Project in Barmer–Balotra area and the time by which water connections to the remaining villages to be provided under the said project; (b) whether it has come to the notice of the Government that the groundwater in Balotra and adjoining areas is highly saline and contaminated; (c) if so, whether the Government is contemplating to set up a desalination plant to sweeten saline water here and if so, the details thereof; and (d) the details of the funds spent during the last three years to improve the depleting groundwater level in Barmer district under the Atal Bhujal Yojana and the results achieved therefrom?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImpact of Ethanol Blending Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3263 · Asked on 2026-03-12
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) whether the country has achieved the target of twenty per cent ethanol blending in July, 2025, five years ahead of the originally scheduled timeline, if so, the details thereof; (b) the number of retail outlets dispensing E20 fuel and the geographical spread of E20 availability across the country, State/UT-wise; (c) the details of cumulative foreign exchange savings and environmental benefits achieved through the Ethanol Blending Programme; and (d) the roadmap prepared by the Government for further enhancing ethanol production capacity and increasing blending levels beyond E20 levels?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConstruction of Roads in Naxal-affected Areas
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3264 · Asked on 2026-03-12
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the number of roads approved and completed in Chhattisgarh under the Bharatmala Pariyojana; and (b) the specific policy formulated to address the obstacles being faced during road construction in Naxal-affected areas?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCSR Funds spent by PSUs
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3265 · Asked on 2026-03-12
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) the details of Corporate Social Responsibility (CSR) funds sanctioned and spent in Chitradurga District, Karnataka by Public Sector Undertakings (PSUs) under the Ministry during the last five years, year-wise; and (b) the name of the implementing agencies, amount of funds sanctioned and utilized, nature of projects and the status of implementation, PSU-wise and project-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceShortage of Staff in DGCA
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3266 · Asked on 2026-03-12
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government has taken note of the explicit warning issued by the Parliamentary Standing Committee on Transport, Tourism and Culture regarding chronic vacancies reportedly exceeding fifty per cent in key regulatory and operational posts in the Directorate General of Civil Aviation (DGCA) and the Committee’s observation that such shortages could compromise safety oversight and if so, the details thereof; (b) the remedial steps taken by the Government to fill these long-pending vacancies and to strengthen DGCA’s manpower at senior technical and safety-critical levels in light of the Committee’s concerns about the weakened regulatory capacity of DGCA; (c) the timeline within which all critical posts in DGCA, flagged by the Committee as essential for effective safety regulation, would be filled; and (d) whether a fast-track recruitment mechanism has been adopted for the said purpose and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMicro Food Processing Enterprises Supported under PMFME Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3267 · Asked on 2026-03-12
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) the number of micro food processing enterprises supported under the Pradhan Mantri Formalisation of Micro Food Processing Enterprises (PMFME) scheme in the country, State-wise including Uttar Pradesh particularly in Bulandshahr district; (b) the details of the credit support, infrastructure and market linkage provided under the PMFME scheme; and (c) the impact of the PMFME scheme on employment generation and income enhancement of local entrepreneurs?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEMRSs in Uttar Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3268 · Asked on 2026-03-12
Ministry: TRIBAL AFFAIRS
Member asked
(a) whether the Government has assessed the performance and progress made in Eklavya Model Residential Schools (EMRSs) for tribal children in Uttar Pradesh; (b) if so, the details thereof; and (c) the details of such boarding schools functioning in Uttar Pradesh along with their locations?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDisruptions in Flight Operations by Laser Beams
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3269 · Asked on 2026-03-12
Ministry: CIVIL AVIATION
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware of increasing incidents of laser beams being directed at aircraft, including recent reports by pilots of Cathay Pacific during operations at Indira Gandhi International Airport, disrupting flight operations and if so, the details thereof; (b) the details of the total number of such incidents reported during the last three years at IGI Airport and other major airports, year-wise; (c) whether it is a fact that laser exposure during critical phases such as landing and take-off can cause temporary flash blindness and visual impairment to pilots, thereby posing serious risks to passengers, crew and aircraft and if so, the details thereof; (d) the measures taken to coordinate with airport operators, ATC authorities and local police for prevention and identification of offenders; and (e) whether the Government proposes stricter legal provisions, enhanced surveillance and technological solutions to ensure aviation safety and deter such hazardous acts and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInvestigation on Flight Crash Incident
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3270 · Asked on 2026-03-12
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government has constituted any enquiry or investigation in connection with the recent flight accident involving the Deputy Chief Minister of Maharashtra and if so, the details thereof; (b) whether the enquiry has been completed in this regard and if so, the key findings and recommendations thereof; (c) whether any lapses, procedural violations, or safety deficiencies were identified in the enquiry and if so, the details thereof; (d) whether there was any delay in constituting the enquiry committee after the incident and if so, the reasons therefor; and (e) whether any action has been taken/is proposed to be taken based on the findings of the enquiry and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational Highway Projects in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3271 · Asked on 2026-03-12
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the current status of National Highway projects in the rural and backward areas of Maharashtra and the district-wise details of incomplete works; (b) whether the condition of roads in Beed district and surrounding areas is poor and if so, the action taken for their repair and sanction of funds; (c) the specific schemes being implemented by the Union Government for the upgradation of rural roads and sanction of new routes and the number of villages in Maharashtra that have benefited therefrom; (d) the safety measures implemented by the Ministry to reduce accidents on National Highways; (e) the timeline fixed for completion of pending flyovers, bypasses and widening projects; and (f) whether some projects have been delayed due to lack of coordination between the Union and State Governments, if so, the arrangements made to ensure their timely completion?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCentral Motor Vehicles (Second Amendment) Rules, 2026
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3272 · Asked on 2026-03-12
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the manner in which the Central Motor Vehicles (Second Amendment) Rules, 2026 are being implemented to strengthen compliance of National Highway user fee payments; (b) the definition and mechanism for identification and recovery of unpaid user fee through the Electronic Toll Collection system; (c) the manner in which clearance of unpaid user fee has been linked with vehicle-related services such as grant of No Objection Certificate, renewal of Certificate of Fitness and issuance of National Permits; (d) the changes made to Form 28 pertaining to issuance of No Objection Certificate, for transfer of ownership or migration of vehicles and the status of integration with designated online portals; and (e) the expected impact of these amendments on toll compliance, digital enforcement and implementation of Multi-Lane Free Flow tolling?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceModernisation of Airports in Bihar
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3273 · Asked on 2026-03-12
Ministry: CIVIL AVIATION
Member asked
(a) the current status of airport modernisation projects in Bihar; (b) the details of airports, including Gopalganj, that are being upgraded or are planned for modernisation; (c) the expected completion timelines fixed for these modernisation projects; (d) the estimated cost and sources of funding for these projects; and (e) the manner in which these modernisation efforts are expected to improve passenger experience and operational efficiency?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCauvery Water Management Authority
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3274 · Asked on 2026-03-12
Ministry: JAL SHAKTI
Member asked
We have not ingested the asking members for this question.
(a) whether it is true that the Cauvery Water Management Authority held a meeting at 47th time in Delhi on 6th January, 2026 and if so, the details thereof; (b) the agenda discussed during the meeting and the outcome thereof; and (c) whether any decision has been taken during the meeting on the issue of construction of Mekedatu dam across the Cauvery river and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFunds for Development of Eight New Cities
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3275 · Asked on 2026-03-12
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether it is a fact that the Rupees Eight Thousand crores allocated for a performance-based challenge fund to develop eight new cities has remained unutilised during the last five years and if so, the details thereof; (b) whether any such city or urban project was proposed in Punjab, particularly in or around Hoshiarpur Lok Sabha Constituency, if so, the names and locations of the proposed cities; (c) the reasons for the non-utilisation or under-utilisation of these funds for a prolonged period including delays in approvals, land acquisition, coordination with State Governments or changes in policy priorities in this regard; (d) whether the Government has taken any measures to ensure time-bound utilisation of funds, fix accountability and revive or re-structure the new city projects including a revised timeline for implementation; and (e) if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBharatmala Pariyojana Phase-II
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3276 · Asked on 2026-03-12
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the current status of Bharatmala Phase-II including the progress made so far in terms of project awards, construction and completion and the number of projects pending under Bharatmala Phase-II; (b) the reasons for the delay in awarding and completing the pending projects and the expected completion timeline for the proposed five thousand kilometers of roadway projects under Bharatmala Phase-II; (c) the total investment required for completing Bharatmala Phase-II and the funding arrangement for the same; and (d) whether there is any plan to seek private sector investment or funding from international institutions for Bharatmala Phase-II and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGramodyog Vikas Yojana in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3277 · Asked on 2026-03-12
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
Omprakash Rajenimbalkar, Arvind Sawant, Sanjay Deshmukh
(a) the number of training programmes organized under the Gramodyog Vikas Yojana (GVY) in Maharashtra during the last five years as well as in various other States, year-wise, district-wise and trade-wise, such as pottery, beekeeping, leather, food processing etc.; (b) the number of beneficiaries trained in Maharashtra along with the number of toolkits/machines (such as electric potter’s wheels, bee boxes, dona–pattal making machines, leather and electrician kits) distributed to them and the number of units or Self-Help Groups (SHGs) formed, district-wise; (c) the details of the outcomes recorded in Maharashtra, such as the number of village industries/enterprises started or revived, increase in average monthly income per beneficiary and the number of job opportunities generated; (d) the amount of funds sanctioned, released and utilized component-wise under GVY for Maharashtra during the last five years and the State's share in the national budget for the scheme; and (e) whether any third-party evaluation has been conducted to assess the impact of GVY in Maharashtra and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of PMKSY in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3278 · Asked on 2026-03-12
Ministry: JAL SHAKTI
Member asked
(a) the main objectives and the current status of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) across the country including Maharashtra; (b) whether Akola and Washim districts of Maharashtra have been included under the PMKSY during the current year, if so, the details thereof; (c) the number of projects sanctioned or operational under each component particularly in Washim-Yavatmal Parliamentary Constituency; (d) the action plan prepared for Akola and Washim districts so far along with the time by which implementation is likely to be completed; (e) the funds allocated, released and utilised under PMKSY in Maharashtra particularly in backward, most backward and aspirational districts during the last five years, year-wise and component-wise; (f) whether the scheme covers both drought as well as deficient rainfall affected districts and if so, the details thereof and the time by which all such districts are likely to be included under the scheme and if not, the reasons therefor; and (g) the details and the number of direct and indirect employment generated through PMKSY projects in Maharashtra during the last five years?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceHydrocarbon Supply Security and Energy Transition Strategy
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 3279 · Asked on 2026-03-12
Ministry: PETROLEUM AND NATURAL GAS
Member asked
Bidyut Baran Mahato, Dilip Saikia, Lumbaram Choudhary, Shankar Lalwani, Rajesh Mishra, Kamaljeet Sehrawat, Kamlesh Jangde, Dineshbhai Makwana, Manoj Tiwari, Praveen Patel, Vijay Kumar Dubey
(a) the projected demand for crude oil, natural gas and petroleum products in the country during the next ten to fifteen years in view of India’s projected growth in overall energy consumption; (b) the steps being taken to strengthen long term hydrocarbon supply security including diversification of import sources, expansion of strategic petroleum reserves and promotion of domestic exploration and production; (c) whether the hydrocarbon sector reforms are being aligned with India’s broader energy transition goals particularly in the context of rising share of non-fossil fuel electricity and sustainable commitments, if so, the details thereof; and (d) whether any such efforts have been made in Sidhi Lok Sabha Constituency of Madhya Pradesh, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.