FGD System Koradi Thermal Power Plant
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4479 · Asked on 2026-03-19
Ministry: POWER
Member asked
be pleased refer to USQ No. 2215 dated 12 February, 2026 and to state that: (a) whether the progress of six tenders for installation of FGD system at Koradi Thermal Power Plant is very slow, if so, the details thereof and the present stage of bid evaluation; (b) whether the Government is monitoring the roadmap on a monthly basis to ensure that the FGD system is commissioned before 31.12.2027 in accordance with the notified timelines, if so, the details thereof; (c) whether Maharashtra State Power Generation Company Limited (MAHAGENCO) has debarred or blacklisted the contractor of five tenders (issued in 2023) who failed to fulfil contractual obligations or recovered the full amount under the risk and cost clause, if so, the details thereof; and (d) the steps taken to ensure that the outcome of the six tenders does not meet the same fate as that of the earlier five tenders?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePMAY-U 2.0 in Gujarat
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4480 · Asked on 2026-03-19
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) the number of affordable houses sanctioned and completed so far under Pradhan Mantri Awas Yojana - Urban (PMAY-U) 2.0 in Dahod Lok Sabha Constituency of Gujarat; (b) whether the Government has implemented any specific scheme for Affordable Rental Housing Complexes (ARHCs) for migrant workers and Low-Income Groups (LIGs) in said Lok Sabha Constituency and if so, the details thereof; and (c) whether any Additional Central Assistance (ACA) has been provided to the said Lok Sabha Constituency considering its status as a tribal-dominated area and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRural Water Security in Moradabad District
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4481 · Asked on 2026-03-19
Ministry: JAL SHAKTI
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has conducted any comprehensive review of drinking water availability, groundwater sustainability and rural water security in Moradabad district of Uttar Pradesh, particularly in Kundarki, Bilari, Thakurdwara and the low-lying villages adjacent to the Ramganga river where the use of water for domestic purpose, agriculture and animal husbandry is being affected due to declining groundwater levels, water quality risks, seasonal water crises and uneven supply of water despite the implementation of national water supply schemes; (b) if so, the details of the source sustainability studies, groundwater recharge works, drinking water infrastructure upgrades, water quality monitoring systems and inter-agency coordination measures undertaken in the said district to ensure long-term water security; and (c) if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFlight Disruptions due to Fog
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4482 · Asked on 2026-03-19
Ministry: CIVIL AVIATION
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware of the fact that several flights originated from Indira Gandhi International (IGI) Airport, New Delhi were cancelled/delayed due to severe fog condition during the winter season i.e. December, 2025 and January 2026 and if so, the details thereof; (b) whether in case of such flight cancellations, all the passengers were refunded their tickets money without any deductions by the concerned airlines and if so, the details thereof; (c) whether the Government has received any complaints from the passengers regarding non-payment/partial payment of their cancelled flight tickets; and (d) if so, the details thereof along with the action taken thereon?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceShortage of LPG Cylinders in Andaman and Nicobar Islands
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4483 · Asked on 2026-03-19
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) whether the Government is aware that the acute shortage of LPG cylinders in various parts of the UT of Andaman and Nicobar Islands such as Guptapara, Wandoor, Ferrargunj Tehsil, Dairy Farm area of Sri Vijayapuram Tehsil, Car Nicobar and Campbell Bay etc.; (b) if so, the details thereof along with the action taken by the Government to address the grievances and to bridge the gap between the demand and supply of LPG cylinders in the said areas; and (c) whether the Government proposes to appoint additional full-fledged LPG distributors as per the prescribed norms and to issue necessary directions to the concerned authorities to ensure uninterrupted and timely supply of LPG cylinders across all islands and if so, the details thereof along with the timeline fixed for implementation?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConversion of Vacant Government-Funded Houses into ARHC Units
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4484 · Asked on 2026-03-19
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the number of vacant Government-funded houses identified for conversion under the Affordable Rental Housing Complexes (ARHCs) scheme under Pradhan Mantri Awas Yojana - Urban (PMAY-U) in Gujarat and Tamil Nadu; (b) the number of houses out of the said houses that have been successfully converted into functional rental housing units till date; (c) the steps taken by the Government to expedite the conversion of the remaining vacant Government-funded houses into ARHC units in Gujarat and Tamil Nadu; and (d) the details of the plans formulated to address the challenges encountered under Public-Private Partnership (PPP) model in the development of Greenfield ARHCs units in Gujarat and Tamil Nadu?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFinancial Performance of Pata Petrochemical Plant
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4485 · Asked on 2026-03-19
Ministry: PETROLEUM AND NATURAL GAS
Member asked
We have not ingested the asking members for this question.
(a) whether it is a fact that the petrochemical segment of GAIL (India) Limited including its major Pata Petrochemical Plant in Uttar Pradesh has incurred losses and experienced financial volatility during the financial year 2024-25, particularly in the initial quarters and if so, the details thereof, quarter-wise; (b) the specific reasons for such losses, including high feedstock gas prices, decline in polymer prices, reduced capacity utilisation, shutdowns and prevailing global market conditions; (c) whether the Government has reviewed the performance of the Pata Petrochemical Plant and sought any explanation from the management in this regard and if so, the details thereof; (d) the corrective and strategic measures taken by GAIL (India) Limited to reduce such losses including feedstock optimisation, cost rationalisation, infrastructure augmentation and diversification of product portfolio; and (e) the timeframe by which the plant is expected to return to sustainable profitability?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Tribal Welfare Schemes in Beed, Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4486 · Asked on 2026-03-19
Ministry: TRIBAL AFFAIRS
Member asked
(a) whether the Government has taken cognisance that the benefits of various Central tribal welfare schemes are not fully reaching the tribal areas of Beed district in Maharashtra, if so, the details of beneficiaries and funds distributed, scheme-wise and taluka-wise; (b) whether the Government has taken note that tribal habitations in Beed district are facing shortages of basic facilities such as education, healthcare, drinking water, roads and employment, if so, the concrete steps taken so far to address these issues; and (c) whether the Government proposes to introduce new schemes or expand the existing schemes for skill development, self-employment and economic empowerment of tribal youth and women in Beed district, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of JJM in West Bengal
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4487 · Asked on 2026-03-19
Ministry: JAL SHAKTI
Member asked
(a) the present status of implementation of Jal Jeevan Mission (JJM) along with the funds sanctioned, released and utilised since 2019 in West Bengal, year and district-wise; (b) the details of Central funds allocated, drawn and utilised so far under JJM in Darjeeling and Kalimpong districts of West Bengal; (c) the number of households connected with tap water supply in the said districts of West Bengal under JJM; and (d) the details of works/projects sanctioned, under construction and completed under JJM in the said districts of West Bengal?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSurat-Chennai Expressway Project
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4488 · Asked on 2026-03-19
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
Arvind Sawant, Sanjay Deshmukh, Omprakash Rajenimbalkar
(a) the details of the highways being developed by the National Highways Authority of India (NHAI) across the country and the Government’s policy regarding land acquisition for these projects; (b) the current status of development of Surat-Chennai Expressway Project by NHAI; (c) whether the agricultural land has been acquired in the districts of Maharashtra including Dharashiv and Solapur under the Surat-Chennai Expressway Project; (d) if so, the details of total hectares of land acquired so far in these districts and the compensation per hectare/acre fixed and disbursed; (e) whether the Government received complaints regarding comparatively low compensation being given to the affected farmers and if so, the details thereof; (f) whether the land acquisition process fully complied with the provisions of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013; and (g) if not, the steps taken/being taken by the Government to ensure fair and market-aligned compensation to the affected farmers?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAllotment of Petrol Pumps by OMCs
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4489 · Asked on 2026-03-19
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) the total number of retail outlets allotted to applicants belonging to Scheduled Castes (SCs), Scheduled Tribes (STs), Defence and Widow categories by Oil Marketing Companies (OMCs) in Delhi NCR and other Metro Cities since the year 2005, year-wise; (b) the details of the number of outlets originally allotted to SC/ST/Defence/Widow category applicants that were subsequently reconstituted with the induction of applicants from the General Category during the last ten years, year-wise and outlet-wise; (c) whether the number of petrol pumps originally allotted to SC/ST category applicants are being operated by minority partners without the major shareholder (benami operations) and detected by OMC officials and if so, the details of such cases and the action taken thereon; (d) the details of the number of retail outlets allotted to General Category applicants in Delhi/NCR, Gurgaon and other major cities after 2005 where the allottee was required to arrange land on their own as per the guidelines of the Ministry of Petroleum and Natural Gas; and (e) the number of retail outlets allotted on HUDA land to applicants since 2011 to till date?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of MSME Framework in Chandigarh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4490 · Asked on 2026-03-19
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) whether the Government has examined the reasons for non-adoption of the provisions of the Micro, Small and Medium Enterprises Development Act, 2006 in the Union Territory of Chandigarh, despite its applicability in neighbouring States and the timeline for its implementation in Chandigarh; (b) whether the absence of a formal MSME framework has affected access to benefits such as delayed payment protection, formal recognition of service enterprises and institutional support and if so, the details thereof; (c) whether the Chandigarh UT Administration is in the process of formulating and notifying a dedicated MSME policy and the key features proposed therein; (d) whether representations have been received from industry bodies regarding lack of parity with neighbouring States in MSME facilitation and the action taken thereon; and (e) the steps being taken to align Chandigarh’s enterprise ecosystem with national MSME policies to improve ease of doing business and promote investment?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInterlinking of Rivers between Northern and Southern Regions
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4491 · Asked on 2026-03-19
Ministry: JAL SHAKTI
Member asked
(a) whether the Government has any action plan or scheme for interlinking of all rivers of the country between the northern and southern regions and if so, the details thereof; (b) whether it is a fact that half of the country is being devastated by floods during the monsoon while the other half suffers from drought and a large population is compelled to consume fluoride-contaminated water due to non-implementation of the said scheme and if so, the details thereof; and (c) whether the Government has taken note that the said scheme is the most appropriate mechanism to address these issues and if so, the details thereof along with the time by which it is likely to be implemented?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCommunity Participation in Water Conservation Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4492 · Asked on 2026-03-19
Ministry: JAL SHAKTI
Member asked
(a) the steps taken by the Government to enhance community participation in the planning, implementation and maintenance of water conservation projects under Jal Shakti Abhiyan: Catch the Rain campaign in the country; (b) the role of Panchayati Raj Institutions (PRIs), Self-Help Groups (SHGs) and local community groups in spreading awareness about water conservation and the outcomes achieved therefrom in the country; (c) the initiatives undertaken for capacity building and technical training of local stakeholders including the establishment of Jal Shakti Kendras and implementation of the Nal Jal Mitra programme in the country; and (d) the impact of such community-based initiatives on the sustainability and effectiveness of water conservation efforts across various regions, State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePotential of Food Processing Clusters in Fatehgarh Sahib
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4493 · Asked on 2026-03-19
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) whether the Government has evaluated the potential of food processing clusters in and around Fatehgarh Sahib Parliamentary Constituency including Sirhind, Bassi Pathana, Khamano and nearby agricultural procurement belts for scaling value-addition in cereals, pulses, dairy and horticulture produce; (b) if so, the details thereof along with the Government support provided or proposed under schemes such as the Production Linked Incentive (PLI) scheme, the Pradhan Mantri Formalisation of Micro Food Processing Enterprises (PMFME) scheme and Mega Food Park or Cluster initiatives for Punjab with specific reference to units operating in the Fatehgarh Sahib region; and (c) the measures proposed to be taken by the Government to enhance processing infrastructure, quality testing laboratories, packaging facilities, cold storage and market linkage for farmer-producer groups and Micro, Small and Medium Enterprises (MSMEs) so that farmers of Sirhind, Bassi Pathana and Khamano obtain better price realisation through local processing?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceJob Opportunities in Food Processing Sector
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4494 · Asked on 2026-03-19
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) the extent to which food processing units have helped to increase farmers' income; (b) the steps taken by the Food Safety and Standards Authority of India (FSSAI) for quality control; (c) whether there is a possibility of creating new job opportunities in the food processing sector, if so, the details thereof; and (d) the status of the food parks sanctioned in Kerala?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUnoccupied Houses under PMAY-U
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4495 · Asked on 2026-03-19
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether it is a fact that the deadline for Pradhan Mantri Awas Yojana - Urban (PMAY-U) expired on 31st December, 2024; (b) if so, the percentage of completed and unoccupied houses out of the total sanctioned houses under PMAY-U as of 31st December, 2025, vertical-wise; and (c) the reasons for a large number of unoccupied houses, particularly under the in-situ slum redevelopment and affordable housing verticals of PMAY-U?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational Highway Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4496 · Asked on 2026-03-19
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
We have not ingested the asking members for this question.
(a) the status of National Highway projects passing through Kolhapur district; and (b) whether land acquisition issues are delaying the works, if so, the details thereof and the expected completion dates?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMSMEs in Anandpur Sahib
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4497 · Asked on 2026-03-19
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
We have not ingested the asking members for this question.
(a) the details of digitalisation schemes introduced for Micro, Small and Medium Enterprises (MSMEs) in Anandpur Sahib including funds sanctioned and released during the years 2023‑25; (b) the number of MSME units in Anandpur Sahib adopting digital platforms for marketing, inventory and payments, along with sector-wise distribution; (c) the training and awareness programmes conducted to support MSMEs in digital transformation, with details of participants and implementing agencies; (d) the Impact assessment of digital adoption on productivity, turnover and employment generation in the Anandpur Sahib Lok Sabha Constituency; and (e) the measures taken or proposed by the Union Government to further promote digital tools and e-commerce platforms for small enterprises in Anandpur Sahib?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Siliguri-Jhapa Petroleum Pipeline Project
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4498 · Asked on 2026-03-19
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) the present status of the Siliguri-Jhapa petroleum pipeline project, including confirmation that approximately seven per cent of the physical work has been completed so far; (b) the details of the key milestones achieved to date and the remaining stages of execution, particularly in the Siliguri region; (c) the total estimated investment of the project, the implementation model adopted and the details of funds allocated, released and utilised till date; (d) the steps being taken by the Government to facilitate faster execution of the project, including coordination with the Government of Nepal, resolution of land and right-of-way issues and inter-agency support; and (e) the expected timeline for completion and commissioning of the project and the anticipated benefits for fuel logistics, regional connectivity and India-Nepal energy cooperation?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of JJM
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4499 · Asked on 2026-03-19
Ministry: JAL SHAKTI
Member asked
(a) the details of the budgetary allocation made during the current Financial Year (FY) 2026-27 towards Jal Jeevan Mission (JJM), drinking water and sanitation in terms of actual expenditure of FY 2023-24, State-wise; (b) whether the Government has issued any directives or certain conditions to be fulfilled before funding to States under the schemes of the said Mission and if so, the details thereof; (c) the number of rural households still not receiving safe drinking water through tap connections across the country, State-wise; (d) whether the Government has conducted any independent review or audit to assess the progress and quality of water supply implemented under the said Mission and if so, the details and key findings thereof; and (e) the steps being taken by the Government for effective implementation of the said Mission and to rectify failed or poorly implemented projects by States along with the action initiated/likely to be initiated by the Government to complete the target of the said Mission on time?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFunds Allocated for National SC/ST Hub for Tamil Nadu
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4500 · Asked on 2026-03-19
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the details of funds allocated and utilized for the National SC/ST Hub (NSSH) in the State of Tamil Nadu during the last five years; (b) the number of SC/ST entrepreneurs supported and Micro, Small, and Medium Enterprises (MSMEs) registered under the scheme in Tamil Nadu during the last five years, district-wise; (c) the details of the present implementation status regarding capacity building, mentoring and credit facilitation provided to SC/ST entrepreneurs in the State; and (d) the details of procurement linkages established to enable SC/ST-owned MSMEs in the State of Tamil Nadu to participate in the Union Government Departments and Undertakings tenders and exhibitions?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFinancial Viability of Regional Air Connectivity
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4501 · Asked on 2026-03-19
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government has reviewed the long-term financial viability of regional air routes after the withdrawal of viability gap funding and if so, the details thereof; (b) the number of regional routes discontinued during the last five years due to low passenger load factors or airline losses, State-wise; (c) whether route planning under regional connectivity schemes adequately factors in local economic activity, industrial growth and educational hubs and if so, the details thereof; (d) the steps taken to prevent regional airports from becoming under-utilised or financially unviable assets; and (e) whether any economic feasibility or passenger demand study has been conducted for providing air connectivity to Davanagere and if so, the findings thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Water-related Schemes in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4502 · Asked on 2026-03-19
Ministry: JAL SHAKTI
Member asked
We have not ingested the asking members for this question.
(a) the details of the schemes/programmes/initiatives of the Ministry implemented in Andhra Pradesh during the last three years, district-wise, especially in Konaseema district; (b) the number of beneficiaries covered under each scheme in Andhra Pradesh during the last three years, year, scheme and district-wise, especially in Konaseema district; (c) the number of households provided with tap water connections and safe drinking water coverage in Andhra Pradesh, district-wise, especially in Konaseema district; (d) the details of irrigation, water resources and river development projects sanctioned or under implementation in Andhra Pradesh, district-wise, especially in Konaseema district; (e) the funds allocated, released and utilised under the said schemes in Andhra Pradesh during the last three years, year and district-wise; (f) the status of water quality testing, groundwater management and sanitation measures in Andhra Pradesh, district-wise, especially in Konaseema district; and (g) whether any new projects or initiatives are proposed by the Government for Andhra Pradesh, particularly in Konaseema district and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Provisions of Article 244 in the Fifth Schedule States
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 4503 · Asked on 2026-03-19
Ministry: TRIBAL AFFAIRS
Member asked
(a) the details of the decisions taken in the interest of tribal communities by the Governors of the Fifth Schedule States by exercising their powers under Article 244 of the Constitution during the last ten years, State-wise and year-wise and the documentary references of the decisions taken therein; (b) the dates on which notifications were issued by the Governors for the constitution of urban local bodies in all the Fifth Schedule States of the country as per the provisions contained in Paragraph 5(1) of the Fifth Schedule under Article 244 of the Constitution along with the State-wise references of the said notifications; (c) the details of the procedure of constitution and the jurisdiction of the Central Tribal Advisory Committee and the Tribes Advisory Councils (TACs) formed in the States having Fifth Schedule Areas along with the number of meetings held during the last ten years; and (d) the details of the plan formulated to make the data regarding the works being undertaken by the Tribes Advisory Councils of all the States available online to the public?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.