Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 5,276–5,300 / 34,220
Allocation of Funds under PMGSY
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5068 · Asked on 2026-03-24
Ministry: RURAL DEVELOPMENT
Member asked
(a) whether it is a fact that the funds allocated for Pradhan Mantri Gramin Sadak Yojana (PMGSY) has been either grossly underutilized or utilization is very meagre during the last two years and for the current year, if so, the details thereof; (b) the funds allocated during the year 2024, 2025 and 2026 and the actual utilization during these years; and (c) the reasons for under-utilization and the remedial measures proposed to be taken to check that such Centrally Sponsored Schemes (CSS) are properly implemented by the States ?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePMMSY in Tamil Nadu
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5069 · Asked on 2026-03-24
Ministry: FISHERIES, ANIMAL HUSBANDRY AND DAIRYING
Member asked
We have not ingested the asking members for this question.
(a) whether it is true that 61 projects worth about ₹321.48 crore were approved for Tamil Nadu under the Pradhan Mantri Matsya Sampada Yojana (PMMSY) but several projects are yet to be fully implemented due to pending release of central assistance; (b) whether the Government has received proposals from Tamil Nadu seeking approximately ₹150 crore for development of the Thangachimadam fishing harbour, and the status thereof; (c) whether it is also true that the ban-period relief assistance amounting to about ₹107.49 crore for 2024–25 has only been partially disbursed to fishermen in the State; and (d) the steps taken by the Government to expedite release of funds for PMMSY projects, deep-sea fishing vessels and fisheries infrastructure in Tamil Nadu?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSkilling under Project UNNATI
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5070 · Asked on 2026-03-24
Ministry: COMMERCE AND INDUSTRY
Member asked
Magunta Sreenivasulu Reddy, Vemireddy Prabhakar Reddy, Putta Mahesh Kumar
(a) the details regarding the measures undertaken by the Government to provide skill development opportunities under Project UNNATI Andhra Pradesh, with special focus on rural, backward, and underdeveloped regions; (b) the details regarding the scheme-wise and year-wise details of funds allocated, sanctioned, and released under Project UNNATI and other skilling programmes in Andhra Pradesh during the last five years; (c) the details regarding the steps taken to ensure equitable access to such programmes for youth from diverse socio-economic backgrounds in Andhra Pradesh, including those belonging to Scheduled Castes, OBCs, minorities, and other marginalised communities; and (d) whether the Government has undertaken any steps to raise awareness regarding the benefits of project UNNATI, if so, the details thereof, if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRights of Persons with Disabilities Act
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5071 · Asked on 2026-03-24
Ministry: SOCIAL JUSTICE AND EMPOWERMENT
Member asked
Bhojraj Nag, Mala Rajya Laxmi Shah, Manish Jaiswal, Alok Sharma, Satish Kumar Gautam, Brijesh Chowta, Vishnu Dayal Ram, Aparajita Sarangi, Anurag Sharma, Kamaljeet Sehrawat
(a) the details of States that have notified rules under the RPwD Act and the status of implementation, State-wise incluiding Jharkhand, particularly in the districts of Hazaribagh and Ramgarh; (b) the status of implementation of reservation in Government employment, State-wise including Jharkhand particularly Hazaribagh and Ramgarh districts; (c) whether the Government has received any complaints about the low monthly pension amount for persons with disabilities, if so, the details thereof; (d) whether the Government proposes to enhance the monthly pension amount for the persons with disabilities, if so, the time by which it is likely to be enhanced, if not, the reasons therefor; (e) whether accessibility audits of public buildings have been completed across the country and specifically in Jharkhand including Hazaribagh and Ramgarh districts and if so, the audit findings thereof, State-wise; and (f) whether the Unique Disability ID (UDID) system is fully operational nationwide including in Jharkhand particularly Hazaribagh and Ramgarh districts and if so, the details thereof, State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBudget Allocation for PMMSY
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5072 · Asked on 2026-03-24
Ministry: FISHERIES, ANIMAL HUSBANDRY AND DAIRYING
Member asked
Mohammad Jawed, Baijayant Panda
(a) the details of the budget estimates and actual expenditure for the Pradhan Mantri Matsya Sampada Yojana (PMMSY), year-wise since FY 2021-22; (b) the reasons for the reduction in PMMSY allocation from Budget Estimates Rs. 2,465 crore to Revised Estimates Rs. 1,500 crore in FY 2025-26, along with the major components where cuts were made; (c) the quantity and amount of fisheries export year-wise since FY 2021-22 till date; (d) whether the programme was successful in achieving its target of increasing fisheries export earnings to Rs. 1 lakh crore by 2024-25, if so, the details thereof; (e) the number of fishers covered under PMMSY fisher insurance year since FY 2021-22and State/UT-wise; (f) the details of total insurance premium amount borne by the Centre FY 2021-22, year and State/UT-wise; (g) the total value of exports from the fisheries sector during FY 2024-25 and FY 2025-26; (h) the value of fisheries exports from the State of Odisha during the said period; and (i) whether further measures are proposed under PMMSY in this regard, if so, the details thereof and the steps taken by the Government under PMMSY to prevent harvest and post-harvest losses in Odisha?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcee-Gram Swaraj Portal
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5073 · Asked on 2026-03-24
Ministry: PANCHAYATI RAJ
Member asked
Nalin Soren, Dhairyasheel Mane, Shankar Lalwani, Himadri Singh, Vijay Baghel, Ananta Nayak, Smita Wagh, Rodmal Nagar, Bhartruhari Mahtab, Bhojraj Nag, Jagadish Shettar, Avimanyu Sethi, Shobhanaben Baraiya, Jugal Kishore, P. P. Chaudhary, Manna Lal Rawat, Janardan Mishra, Haribhai Patel, Sukhjinder Singh Randhawa, Gopal Jee Thakur, Khagen Murmu, Aparajita Sarangi, Bhola Singh, Manoj Tiwari
(a) the percentage and total number of Gram Panchayats in the country that have been onboarded onto the e-Gram Swaraj portal, State/UT and district-wise including Uttar Pradesh, Maharashtra, Jharkhand, J&K, M.P. and Jalgaon, Dewas and Shajapur districts of Pali Lok Sabha Constituency; (b) whether the real-time accounting, planning and work-monitoring modules of the portal have been fully operationalised in all district and States/Union Territories including Madhya Pradesh, Odisha, Rajasthan, Punjab, Jammu and Kashmir, Durg and Bemetara, Dumka districts of Jharkhand, Chhattisgarh, Bharatpur and Pali Lok Sabha Constituencies; (c) if so, the details of utilisation of these modules by Gram Panchayats, including number of works planned, approved and monitored through the digital platform, State/UT and district-wise; (d) whether integration of the portal with the Public Financial Management System (PFMS) and other central databases has been completed to enable end-to-end tracking of funds and expenditures; and (e) if so, the measurable improvements observed in financial transparency, monitoring at Panchayat level timely fund utilisation and public access to Panchayat-level information, State/UT and district-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSaansad Adarsh Gram Yojana
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5074 · Asked on 2026-03-24
Ministry: RURAL DEVELOPMENT
Member asked
Anoop Pradhan, Vijay Baghel, Rajkumar Chahar, Ravi Kishan, Anurag Sharma, Bhartruhari Mahtab, Bidyut Baran Mahato, Bhojraj Nag, Sanjay Jaiswal, Naba Charan Majhi, Nalin Soren, Dhairyasheel Mane, Godam Nagesh, Raghunandan Rao, Bibhu Prasad Tarai, Lavu Sri Krishna Devarayalu, Pradeep Kumar Singh, Sukanta Kumar Panigrahi, Jugal Kishore, Vishweshwar Hegde Kageri, Manna Lal Rawat, Janardan Mishra, Gopal Jee Thakur, Anup Dhotre, Satish Kumar Gautam, Vishnu Dayal Ram, Brijesh Chowta, Aparajita Sarangi, Kamaljeet Sehrawat, Bhola Singh, Dineshbhai Makwana, Manoj Tiwari
(a) the details and number of villages adopted under Saansad Adarsh Gram Yojana (SAGY) since inception till date, State, district and phase-wise including Karnataka and Dakshina Kannada district, Jharkhand, Chhattisgarh, Telangana and UT of Jammu and Kashmir; (b) the total number of Gram Panchayats developed as model villages under the said scheme and the criteria used to assess “model” status, State and district-wise including in above said places; (c) whether the Ministry has conducted any third-party evaluation of SAGY outcomes in terms of infrastructure, social indicators, livelihood generation and outcome under the scheme such as Pradhan Mantri Awas Yojana-Gramin (PMAY-G), Swachh Bharat Mission-Gramin (SBM-G) and Jal Jeevan Mission (JJM), State-wise; (d) if so, the details of the evaluation thereof, State-wise including in above said places; (e) the details of clusters approved under Shyama Prasad Mukherji Rurban Mission in Phase-I and Phase-II along with the number of Gram Panchayats and villages covered, State-wise; (f) the percentage of adopted villages that have achieved saturation in key schemes such as Pradhan Mantri Awas Yojana-Gramin (PMAY-G), Swachh Bharat Mission-Gramin (SBM-G) and Jal Jeevan Mission (JJM), State and district-wise; (g whether any timeline has been fixed for universal saturation of adopted villages under all flagship schemes of the Ministry, and if so, the timeline thereof, State-wise; and (h) whether any villages in Bulandshahr district have been adopted under SAGY and if so, the present status of development works therein?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNutmeg Cultivation
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5075 · Asked on 2026-03-24
Ministry: AGRICULTURE AND FARMERS WELFARE
Member asked
We have not ingested the asking members for this question.
(a) the total area under nutmeg cultivation in the country and in Tamil Nadu during the last three years particularly in and around Pollachi and adjoining regions; (b) whether the Government provides financial assistance, subsidies, or technical support for nutmeg cultivation under the Mission for Integrated Development of Horticulture (MIDH) or any other centrally sponsored scheme and if so, the details thereof; (c) whether nutmeg farmers are covered under crop insurance schemes such as Pradhan Mantri Fasal Bima Yojana and the number of beneficiaries in Tamil Nadu; (d) whether any research, extension or capacity-building programmes have been undertaken to improve productivity, pest management and post-harvest processing of nutmeg; and (e) the steps taken to promote value addition, Farmer Producer Organisations (FPOs) and export linkages for nutmeg growers in western Tamil Nadu?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFunds for AIF
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5076 · Asked on 2026-03-24
Ministry: AGRICULTURE AND FARMERS WELFARE
Member asked
(a) the current status of the Agriculture Infrastructure Fund (AIF) and the total amount of funds sanctioned and disbursed thereunder as on date; (b) the total number of projects approved under the said Fund and the extent of employment generated as a result thereof; (c) whether the benefits of the said Fund are adequately reaching small and marginal farmers, if not, the steps being taken to improve the same; (d) the details of the major infrastructure projects (such as cold storage, processing units, and packaging facilities) funded under the said scheme; and (e) the number of beneficiaries who have availed the benefits of the interest subvention scheme so far and the total expenditure incurred by the Government in this regard?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCumulative Capacity under ACC-PLI
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5077 · Asked on 2026-03-24
Ministry: HEAVY INDUSTRIES
Member asked
Shobhanaben Baraiya, K. Sudhakar, Shankar Lalwani, Praveen Patel, Ravi Kishan, Rajesh Mishra
(a) the cumulative capacity committed under the Advanced Chemistry Cell Production Linked Incentive (ACC PLI) Scheme in GWh; (b) the status of land acquisition and plant commissioning for approved firms; (c) whether domestic cell manufacturing has reduced import dependency for EV batteries; (d) if so, the details thereof; (e) whether technology transfer arrangements have been finalised with global partners; and (f) if so, the details of such arrangements?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGroup Accident Insurance Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5078 · Asked on 2026-03-24
Ministry: FISHERIES, ANIMAL HUSBANDRY AND DAIRYING
Member asked
We have not ingested the asking members for this question.
(a) the number of fishermen covered under the Group Accident Insurance Scheme (GAIS) along with the number of claims filed, approved, rejected and pending during the last five years, year and State-wise; (b) the total amount of insurance claims disbursed under the scheme during the last five years, year and State-wise; (c) whether the Government has conducted or commissioned any study regarding the adequacy of the existing accidental insurance cover of Rs. 5 lakh in view of inflation, rising living costs and socio-economic conditions of fishermen households and if so, the details and findings thereof; and (d) whether the Government proposes to enhance the accidental insurance cover under GAIS, and if so, the details of the proposal, including the proposed quantum, timeline and basis for such revision?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePACS
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5079 · Asked on 2026-03-24
Ministry: COOPERATION
Member asked
Arvind Sawant, Sanjay Deshmukh, Sanjay Jadhav
(a) whether it is true that the Government has decided to establish two lakh PACS, dairy and fisheries cooperative societies in every Panchayat/village; (b) if so, the details thereof including percent the current status of implementation of the said plan particularly in Maharashtra; (c) the number of cooperative societies out of the proposed two lakh societies likely to be established in Maharashtra district-wise and including Yavatmal-Washim Lok Sabha Constituency; (d) the timeline for completion of the project and the total allocation made for the project during the last five years; (e) the status of the implementation of the said scheme in the Parbhani Lok Sabha Constituency; and (f) the number of cooperative societies likely to be set up in the Parbhani Parliamentary Constituency of Maharashtra out of the said two lakh societies and the time by which this project is likely to be completed?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImport and Export of Agricultural Products
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5080 · Asked on 2026-03-24
Ministry: COMMERCE AND INDUSTRY
Member asked
(a) whether any changes have been made in tariffs related to the import and export of agricultural products under the recent India USA tariff/trade agreements, if so, the details of the agricultural products on which import duties have been reduced or removed; (b) whether the Government has assessed the potential impact of this agreement on Indian farmers' income, MSP arrangements and the domestic agricultural market, if so, the details thereof; (c) whether the Government has considered the shifting export environment in which increased US-tariffs created new pressures on Indian agricultural commodities while triggering opportunities in diversified global markets; (d) the steps taken by the Government for encouraging farmers, producer groups and agribusiness firms to supply a wider range of products, including horticulture, processed foods and niche crops to emerging destinations outside the United States; (e) the measures proposed by the Government to enhance market-linked farmer support, improve international compliance capability, upgrade storage and cold-chain systems and ensure that India’s agricultural-export sector remains stable despite policy fluctuations abroad; and (f) whether it is a fact that cheaper agricultural imports is likely to harm small and marginal farmers in the country and if so, the details thereof and the protective measures (safeguard measures) proposed or implemented by the Government to safeguard the interests of farmers?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational Animal Disease Control Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5081 · Asked on 2026-03-24
Ministry: FISHERIES, ANIMAL HUSBANDRY AND DAIRYING
Member asked
Ananta Nayak, Haribhai Patel, Khagen Murmu, Rajesh Mishra, Sukanta Kumar Panigrahi
(a) the total number of cattle vaccinated against Foot and Mouth Disease (FMD) under National Animal Disease Control Programme (NADCP) till date State-wise including Odisha, Rajasthan, particularly in Keonjhar Lok Sabha Constituency in Odisha and Bharatpur Lok Sabha Constituency in Rajasthan; (b) the extent to which the brucellosis vaccination coverage target has been achieved in the above said places; (c) whether there has been a decline in the incidence of these disease following the widespread of vaccination driven and if so the details thereof; and (d) the extent of digital livestock identification including ear tagging work and its current status across the country and the other steps taken by the Government to strengthen animal health services and improve livestock productivity in the above said place?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFunds for PM E-Drive
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5082 · Asked on 2026-03-24
Ministry: HEAVY INDUSTRIES
Member asked
We have not ingested the asking members for this question.
(a) the details of the funds (in Rupees) allocated and utilised under PM E-Drive scheme as of February 2026 announced during the Budget 2025-26; and (b) whether it is a fact that the allocation of the funds for the said scheme announced in the Budget 2026-27 is just 38 per cent of the last year's Budget and if so, the details thereof along with the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProsecute Officials
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5083 · Asked on 2026-03-24
Ministry: HOME AFFAIRS
Member asked
(a) whether any sanctions to prosecute officials received from various investigating agencies are pending with the Ministry as per reports for more than three months and if so, the reasons for the same; (b) the total number of sanctions granted by the Government to prosecute the officials from 2014; and (c) the total number of sanctions rejected by the Government to prosecute the officials from 2014?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFast Track Courts for NDPS
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5084 · Asked on 2026-03-24
Ministry: HOME AFFAIRS
Member asked
(a) the present status of the request before the Government from the State of Kerala towards central assistance for establishing of Fast Track Courts for the trial of NDPS Act cases in the State; (b) whether the Government will provide funds for establishing the Fast Track Courts to clear pendency of NDPS case in the State and if so, the details thereof; (c) the number of Fast Track Courts for the trial of NDPS Act cases presently, State-wise; and (d) the details of Central assistance provided during the last five years for establishing Fast Track Courts for the trial of NDPS Act cases, State wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceApplications received under Namo Drone Didi Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5085 · Asked on 2026-03-24
Ministry: RURAL DEVELOPMENT
Member asked
We have not ingested the asking members for this question.
(a) whether applications have been invited from Women Self-Help Groups (SHGs) from Chamba district, Himachal Pradesh under the Central Government's Namo Drone Didi Scheme; (b) if so, the details thereof; (c) whether there is a provision to provide training to the members of the Self-Help Groups before the purchase of drones; and (d) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDowry Deaths
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5086 · Asked on 2026-03-24
Ministry: HOME AFFAIRS
Member asked
(a) the total number of cases registered under Section 304B of the Indian Penal Code (dowry death) and the conviction rate in such cases during the last five years, year and State/UT-wise; (b) whether the Government has identified challenges such as evidentiary gaps, investigation delays, or hostile witnesses affecting convictions; (c) the number of reported cases of suspicious or unnatural deaths of married women occurring after seven years of marriage during the last five years, State/UT-wise; (d) whether the Government is aware that Section 304B IPC applies only to deaths within seven years of marriage; (e) whether any proposal exists to review or extend this time limit, if so, the details thereof; and (f) whether the Government proposes to introduce specialised police units, standardised investigation protocols, or fast-track mechanisms for effective investigation and trial of such cases?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCSR Projects in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5087 · Asked on 2026-03-24
Ministry: STEEL
Member asked
(a) the details regarding the list of CSR projects proposed, under consideration and presently functional by PSUs under the Ministry of Steel in Andhra Pradesh, district-wise and in Eluru district; (b) the details regarding the list of focus sectors that CSR projects have been proposed, undertaken and presently functional in Andhra Pradesh, district-wise and in Eluru district; (c) the details regarding the total amount of funds allocated, released and utilised for each CSR initiative specified above across Andhra Pradesh, district-wise and in Eluru district; and (d) the details regarding the total number of beneficiaries of such CSR activities over the last five years across Andhra Pradesh, district-wise and in Eluru district?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEstablishment of Gokul Grams
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5088 · Asked on 2026-03-24
Ministry: FISHERIES, ANIMAL HUSBANDRY AND DAIRYING
Member asked
(a) the number of Gokul Grams established across the country under the Rashtriya Gokul Mission along with the number of farmers benefited therefrom; (b) the details of the Gokul Grams established in the State of Rajasthan, district-wise; (c) whether the Government has provided any special financial assistance or schemes for the improvement of indigenous bovine breeds under this mission; (d) the details of the training and technical assistance being provided to the farmers under this mission; (e) whether any special steps have been taken by the Government to improve the productivity of cows and bulls under the Rashtriya Gokul Mission; and (f) the details of the cooperation being made by the Central Government with the State Government for the conservation and development of bovines under this mission?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAll-Weather Connectivity
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5089 · Asked on 2026-03-24
Ministry: RURAL DEVELOPMENT
Member asked
(a) the details of habitations still lack all-weather road access under Pradhan Mantri Gram Sadak Yojana/Road Connectivity Project for Left Wing Extremism Affected Areas (PMGSY)/RCPLWEA and works sanctioned, in progress and completed with bridge gaps in Koraput and Rayagada; (b) the details of person-days and assets created (check-dams, land development, plantations) under Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS) during the last three years including watershed/forestry convergence; and (c) the timelines to complete pending works in remote Scheduled-Area GPs and the reasons for delay?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEnvironmentally Sustainable Production Practices
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5090 · Asked on 2026-03-24
Ministry: TEXTILES
Member asked
Shrirang Barne, Naresh Mhaske, Bharti Pardhi, Ravindra Waikar, Atul Garg, Shrikant Shinde
(a) whether promoting environmentally sustainable production practices would enhance India’s compliance with evolving global sustainability standards and if so, the details thereof; (b) whether incentivising green technology adoption would reduce carbon emissions and resource consumption within the textile industry and if so, the details thereof; (c) whether aligning textile manufacturing with ESG frameworks would improve India’s attractiveness to global buyers and investors and if so, the details thereof; (d) whether supporting circular economy models, including recycling and waste reduction, would improve long-term environmental and economic resilience and if so, the details thereof; and (e) whether sustainable textile production would strengthen India’s reputation as a responsible and globally competitive apparel manufacturing hub particularly in Maharashtra, Madhya Pradesh and Uttar Pradesh and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePayment Pending and Technical Glitches for Post-Matric Scholarship
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5091 · Asked on 2026-03-24
Ministry: SOCIAL JUSTICE AND EMPOWERMENT
Member asked
(a) the total number of applications received including the total payments pending, and made under Post-Matric Scholarship scheme Caste, Scheduled Tribes and OBC students as of 1st February 2026 for the academic year 2025-26; (b) the details of cases as "Payment Failed" or "Under Process" on the National Scholarship Portal (NSP) due to Aadhaar verification/seeding errors in States with the 60:40 contribution pattern, State-wise; (c) whether the Government has identified technical coordination issues between NSP and State portals in the States including Rajasthan; (d) if so, the corrective measures adopted by the Government in this regard; and (e) the timeline for releasing the remaining Central share to the beneficiaries?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePanchayati Raj Institutions
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5092 · Asked on 2026-03-24
Ministry: PANCHAYATI RAJ
Member asked
(a) whether the Government has assessed the adequacy and timeliness of grants released to Panchayati Raj Institutions in view of their expanding constitutional responsibilities, if so, the details thereof; (b) whether the delays, shortfalls and increasing nature of funds have adversely affected delivery of basic services and local development works, if so, the details thereof; (c) whether recommendations of State Finance Commissions relating to untied and need-based grants are being fully implemented by the Union Government, if so, the details thereof; and (d) the concrete measures proposed to ensure predictable funding, financial autonomy and functional effectiveness of Panchayati Raj Institutions?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.