Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 5,126–5,150 / 34,220
Promotion of Scientific Temperament, Research and Innovation in the Country
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5397 · Asked on 2026-03-25
Ministry: SCIENCE AND TECHNOLOGY
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has laid down any national goals or targets for scientific innovation and technology development for the coming years and if so, the details thereof, including focus areas such as emerging technologies, indigenous innovation, or strategic sectors; (b) the public investment made in scientific research and innovation during the last five years, as a percentage of GDP and in absolute terms; (c) whether the Government has examined the adequacy of current investment levels in science and research in comparison with leading innovation-driven economies; (d) whether the Government has formulated or is implementing any schemes or programmes aimed at promoting scientific temper, rational thinking and evidence-based reasoning among citizens; (e) if so, the details of such schemes/programmes including their objectives, target groups (students, teachers, general public) and modes of implementation; and (f) the funds allocated, released and utilised under these schemes during the last five years, year-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Projects and implementation of Earth Sciences initiatives in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5398 · Asked on 2026-03-25
Ministry: EARTH SCIENCES
Member asked
(a) the details of the major projects and programmes being implemented by the Government particularly in Maharashtra including those related to seismic monitoring, tsunami early warning systems, meteorological services, climate research, atmospheric studies and oceanographic mapping; (b) the current status of these projects along with the timelines for those completed, ongoing and yet to be initiated including the reasons for any delays in implementation; (c) the details of funds allocated, released and expenditure incurred for Earth Sciences projects particularly in Maharashtra during the last three years; (d) the specific steps taken by the Government to strengthen climate resilience, disaster risk reduction, marine weather forecasting and coastal zone management particularly in coastal districts of Maharashtra; and (e) the details of the outcomes achieved so far from the implementation of these projects in terms of scientific capacity building, early warning systems effectiveness, community outreach and benefits to the local population?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment of Rail Infrastructure in Chhattisgarh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5399 · Asked on 2026-03-25
Ministry: RAILWAYS
Member asked
(a) the status of progress of railway stations selected under Amrit Bharat Station Scheme (ABSS) in the country; (b) whether Government is aware of delay in ABSS selected stations in Chhattisgarh and if so, the details of checks put in place to speed up the work to ensure the convenience to the citizens; (c) the steps taken/being taken by the Government to decongest the existing railway lines in Chhattisgarh; (d) the details of completion status and projected economic impact of critical local line expansions particularly for the Dallirajhara-Rowghat-Jagdalpur railway project; (e) the manner in which these combined initiatives (DFC, HSR, and local expansions) address the State's ongoing conflict between prioritizing bulk freight logistics and improving passenger train punctuality; (f) the details of the number of new railway trains to be added for the State including expansion of frequency of existing trains such as Delhi-Bilaspur rajdhani express; (g) the expected increase in coal evacuation capacity upon completion of the ongoing railway corridor projects in the State; and (h) the timelines set for completion of these rail infrastructure projects aimed at strengthening energy supply logistics?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBroad Gauge Line from Kodaikanal Road to Theni
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5400 · Asked on 2026-03-25
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
whether the Union Government has any proposal to lay a new broad-gauge lines from Kodaikanal Road to Theni which is 48 kilometer in distance and Bodi-Rameshwaram, keeping in view the long pending demands from the people of Theni Lok Sabha Constituency and if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceThe Advantages and Benefits of Bharatiya Antriksh Station
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5401 · Asked on 2026-03-25
Ministry: SPACE
Member asked
(a) whether it is a fact that the Indian Space Research Organisation (ISRO) has started the work of setting up a separate research station in space on behalf of our country names Bharatiya Antriksh Station (BAS) and if so, the details thereof; (b) the details of the objectives and expected capabilities of BAS in comparison to other space stations; (c) whether it is true that applications have been invited from interested space agencies to build it on behalf of the Vikram Sarabhai Space Centre and if so, the details thereof; (d) the details of total budget earmarked for the India's prestige project in space and fund released in the current budget year; (e) the time by which the BAS project be completed and functional along with the details of milestones have been set to ensure its timely completion; and (f) the advantages and benefits India likely to get by setting up of this BAS?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDelhi-Bhiwadi-Neemrana-Manoharpur-Jaipur Rail Line
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5402 · Asked on 2026-03-25
Ministry: RAILWAYS
Member asked
(a) whether it is a fact that Delhi-Bhiwadi-Neemrana-Manoharpur-Jaipur rail line was among the initial projects proposed under the Delhi-Mumbai Industrial Corridor (DMIC) in 2008 and if so, the details thereof; (b) whether the project could not be incorporated or operationalised under the DMIC despite initial clearances and if so, the details thereof; (c) whether the Government proposes to revive or integrate this project in view of its significance for industrial and regional economic development in Rajasthan; and (d) if so, the details thereof including the current status and expected timeline for its implementation?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceQuantity of Wheat, Paddy and Coarse Grains Procurement Target
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5403 · Asked on 2026-03-25
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) the details of the quantity of wheat, paddy and coarse grains procured and proposed to be procured under the Foodgrain Procurement Policy by the Food Corporation of India (FCI) since 2020-21 till 2026, year, crop and State-wise; (b) the details of the quantity of wheat, paddy and coarse grains procurement target and procured against the target between the Financial Year 2020-21 till 2026, State, year and crop-wise; (c) whether the Government is aware that Bihar had produced high paddy in this season and Government fixed very less target for Bihar; (d) if so, whether the Government has any plan to increase the target and extended timeline till April 2026 to procure 100% paddy from Bihar farmers; (e) if so, the details thereof and if not, the reasons therefor; and (f) the details of procurement carried out under the Decentralised Procurement System during the same period, State, crop and year-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSAMPANN Pension Portal
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5404 · Asked on 2026-03-25
Ministry: COMMUNICATIONS
Member asked
Jagadish Chandra Barma Basunia
(a) the details of number of complaints registered on the SAMPANN portal since launch of the portal, year-wise; (b) the details of number of complaints pending till date and duration since their registration; and (c) the details of the average time taken to resolve complaints filed on the portal?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSanchar Saathi 2.0 Portal/Platform
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5405 · Asked on 2026-03-25
Ministry: COMMUNICATIONS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has launched the 'Sanchar Saathi 2.0' portal/platform with the objective of providing protection to citizens against problems such as cyber fraud, mobile theft and fake SIM cards and if so, the key objectives and features thereof; (b) whether the facilities for blocking/tracing mobile phones, identifying suspicious SIM cards and filing complaints by consumers are being provided through this platform; (c) whether the Government has established coordination with Telecom Service Providers (TSPs), State Governments and Law Enforcement Agencies (LEAs) for the effective utilisation of the said portal; and (d) if so, the details of the major steps taken and the future action plan of the Government to further strengthen citizen security and ensure effective control over digital fraud?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceIndian Institute of Creative Technologies
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5406 · Asked on 2026-03-25
Ministry: INFORMATION AND BROADCASTING
Member asked
(a) the details of progress on Indian Institute of Creative Technologies (IICT) Mumbai as National Centre of Excellence (NCoE) for Animation, Visual Effects, Gaming, Comics, and Extended Reality (AVGC-XR) including infrastructure, courses launched and students enrolled; (b) the details of partnerships with Google, Meta, NVIDIA with startups incubated, State-wise; (c) whether there has been an evaluation of impact on skill development and industry alignment; and (d) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceIndex of Industrial Production
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5407 · Asked on 2026-03-25
Ministry: STATISTICS AND PROGRAMME IMPLEMENTATION
Member asked
We have not ingested the asking members for this question.
(a) the details of Index of Industrial Production (IIP) since the last three years, month and sector wise; (b) the details of IIP of January 2026 across sectors of manufacturing, mining, electricity and consumer; (c) the details of difference from Gross Domestic Product (GDP) and Index of Industrial Production (IIP); (d) the details of steps taken by the Government to ensure the improvement of industrial production; and (e) the details of measures taken to address supply chain disruptions?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWi-Fi Hotspots under BharatNet
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5408 · Asked on 2026-03-25
Ministry: COMMUNICATIONS
Member asked
(a) the details of number of Wi-Fi hotspots installed under BharatNet till date, State-wise; (b) the details of number of active Wi-Fi hotspots under BharatNet, State-wise; and (c) the details of number of Wi-Fi hotspots installed in aspirational districts and the number of active hotspots?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCAG Report No. 24 of 2025
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5409 · Asked on 2026-03-25
Ministry: RAILWAYS
Member asked
Bachhav Shobha Dinesh, Gowaal Kagada Padavi
(a) whether Comptroller and Auditor General of India Report No. 24 of 2025 has flagged outdated, incomplete or non-renewed private siding agreements leading to ambiguity in levy, recovery and enforcement of charges and if so, the details thereof; (b) the details of the number of such deficient or expired agreements in the Maharashtra railway network including freight-linked sidings in divisions covering Solapur, Nandurbar, Bhandara, Sangli and Dhule, zone and division-wise; (c) whether Railways failed to revise agreements in accordance with updated policies, traffic volumes or revised rate structures and if so, the details and the reasons therefor; and (d) the details of the time-bound plan to standardise/renew agreements, fix responsibility for lapses and recover arrears identified by audit with officer-wise accountability?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source3rd Pay Revision for BSNL Employees
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5410 · Asked on 2026-03-25
Ministry: COMMUNICATIONS
Member asked
We have not ingested the asking members for this question.
(a) whether 3rd Pay Revision (3rd PRC) for BSNL employees (executives and non‑executives) is still pending from 01.01.2017 and if so, the details thereof along with the reasons for non‑implementation; (b) whether the Government has examined the possibility of waiving or relaxing the affordability clause of Department of Public Enterprises (DPE) guidelines in the specific case of BSNL in view of its strategic/national importance and if so, the details and present status; (c) the estimated annual financial burden on BSNL for implementing 3rd PRC at 15% / 10% / 5% fitment for all eligible employees and manner in which this compares with BSNL’s current financial turnaround and revival packages already approved by the Government; and (d) whether the Government proposes to implement 3rd PRC for BSNL employees before a specified date (for example, before 31.03.2026) and if so, the likely timeline and if not, the reasons for delay?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNandurbar-Taloda-Akkalkuwa-Umarpada-Dediyapada New Railway Line
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5411 · Asked on 2026-03-25
Ministry: RAILWAYS
Member asked
(a) whether the Government has examined a proposal for a new railway line connecting Nandurbar-Taloda-Akkalkuwa-Umarpada-Dediyapada and linking it with the Bharuch line in Gujarat to enhance inter-state connectivity and if so, the details thereof; (b) the current status of new surveys, new route feasibility and consultations with the Governments of Maharashtra and Gujarat for new projects; (c) the details of the estimated cost, traffic potential and economic viability of the corridor between two States; (d) the current status of the projects in terms of passenger mobility, freight transport and socio-economic development of tribal regions; and (e) the proposed timeline for approval, funding and execution of the project?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAssessment of Industrial Land in the North-Eastern Region
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5412 · Asked on 2026-03-25
Ministry: DEVELOPMENT OF NORTH EASTERN REGION
Member asked
(a) whether the Government has undertaken any assessment of industrial land availability across North-Eastern (NER) States; (b) if so, the details thereof including the total area of land earmarked for industrial use along with the extent of land that is fully developed and investment-ready; (c) whether such data is maintained in any centralised or Geographic Information System (GIS)-linked portal accessible to potential investors and if so, the details thereof; and (d) whether the Ministry is coordinating with State Governments to streamline identification, mapping and readiness of such land and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceTrains Operating in NR/NCR/NER Railway Zones
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5413 · Asked on 2026-03-25
Ministry: RAILWAYS
Member asked
Iqra Choudhary, Pushpendra Saroj
(a) the details of the passenger trains operating in Northern Railway (NR), North Central Railway (NCR) and North Eastern Railway (NER), along with funds sanctioned, released and utilised for capacity augmentation during the last five years and the present status of implementation thereof, zone-wise; (b) the details of the number of routes and trains in NR, NCR and NER identified as operating beyond prescribed passenger capacity along with the reasons recorded in Ministry reviews for the continued shortfall; (c) the details of the key findings of inspections, internal monitoring reports and safety reviews regarding congestion, waiting list levels and passenger safety concerns in these zones; (d) the details of the number of passenger grievances and representations received regarding overcrowding and inadequate train availability in NR, NCR and NER during the last three years; and (e) the details of the corrective planning, infrastructure expansion and capacity augmentation measures introduced to address congestion and improve passenger services in these zones?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePM-KUSUM and PM-SGMBY in Tamil Nadu
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5414 · Asked on 2026-03-25
Ministry: NEW AND RENEWABLE ENERGY
Member asked
We have not ingested the asking members for this question.
(a) the total number of sanctioned and completed proposals under Pradhan Mantri-Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) and Pradhan Mantri-Surya Ghar Muft Bijli Yojana (PM-SGMBY) in Tamil Nadu and particularly in Vellore Lok Sabha Constituency; (b) the total number of farmers benefited under PM-KUSUM and the total number of households benefited under PM-SGMBY in the country, State-wise including Tamil Nadu; (c) the steps taken by the Government to ensure that last mile coverage of PM-KUSUM and PM-SGMBY schemes; and (d) the various steps taken by the Government to develop and increase solar power generation in Tamil Nadu?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceComplaints against e-Commerce Platforms
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5415 · Asked on 2026-03-25
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
We have not ingested the asking members for this question.
(a) whether it is a fact that in recent years there has been a significant increase in complaints regarding misleading advertisements, sale of counterfeit or substandard products and consumer deception in the name of heavy discounts on e-commerce platforms; (b) if so, the details of total consumer complaints received during the last five years, their redressal, and actions taken against the defaulting companies, year, State/Union Territory and platform-wise; (c) whether in many cases consumers are not provided clear information regarding the actual price, quality and warranty of products; (d) if so, whether the Government has reviewed these issues and considered enforcing strict guidelines or punitive measures for e-commerce companies and sellers; and (e) if so, the details of the concrete steps taken by the Government to protect the interests of consumers?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceChallenges in Public Distribution System
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5416 · Asked on 2026-03-25
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether the Government has assessed exclusion errors and portability challenges under the Public Distribution System in the country with special reference to Kerala; (b) if so, the number of beneficiaries affected, State-wise including Kerala; (c) whether One Nation One Ration Card implementation is fully effective in the country and if so, the data on its effectiveness thereof, State-wise; and (d) the details of the steps taken by the Government to ensure food security for migrant and vulnerable populations?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSmall Language Models
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5417 · Asked on 2026-03-25
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) the details of the amount invested by the Government for the promotion of Small Language Models (SLMs) in the country during the last three years, year-wise; (b) the number of startups supported by the Government for the development of SLMs along with the financial assistance provided to each company, State-wise; (c) the details of the list of SLM project being developed along with the key sectors being targeted; and (d) the timeline by which the supported startups aim to complete preliminary data training and initiate user applications?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceScheme for Encouraging Science to Girl Students
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5418 · Asked on 2026-03-25
Ministry: SCIENCE AND TECHNOLOGY
Member asked
(a) whether any scheme is being implemented by the Government to increase the interest and inclination of girls towards science; (b) if so, the details thereof; and (c) State-wise details of girl students who have been encouraged during the last three years?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAmrit Bharat Trains Schedule under Southern Railway
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5419 · Asked on 2026-03-25
Ministry: RAILWAYS
Member asked
(a) whether it is a fact that the rail passengers were left unhappy with the schedule of Amrit Bharat trains announced very recently under Southern Railway and if so, the details thereof; (b) the details of the basis for fixing the schedule of these announced Amrit Bharat trains; and (c) whether the Railways is considering revising the schedule as demanded by the rail users and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Government Schemes in Dadra & Nagar Haveli and Daman & Diu
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5420 · Asked on 2026-03-25
Ministry: STATISTICS AND PROGRAMME IMPLEMENTATION
Member asked
(a) whether the Ministry has issued any guidelines for the implementation of Government schemes in the Union Territory of Dadra & Nagar Haveli and Daman & Diu during the last one year; (b) if so, the details thereof including the date of issue, comprehensive details of schemes covered under these guidelines and the list of the various Government departments covered thereunder; (c) whether the Ministry has prescribed any new criteria for monitoring and reporting implementation of the said schemes and if so, the details thereof; (d) whether the local Member of Parliament has been formally apprised of these amendments; and (e) if so, the details of the communication sent in this regard and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePending Railway Projects and Cost Escalation
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5421 · Asked on 2026-03-25
Ministry: RAILWAYS
Member asked
(a) the details of the railway infrastructure projects sanctioned during the last ten years that are yet to be completed in Northern Railway (NR), North Central Railway (NCR) and North Eastern Railway (NER) along with their original approved cost, revised cost and present physical and financial progress, project-wise; (b) the details of the number of such projects in NR, NCR and NER that have experienced cost escalation or timeline overruns, the reasons identified in Ministry reviews for such delays and the additional financial burden arising therefrom; (c) the details of the key findings of inspections, performance audits or internal monitoring reports regarding land acquisition, statutory clearances, contractor performance and fund availability affecting project execution in these zones; and (d) the details of the monitoring and accountability measures introduced to ensure time-bound completion of railway infrastructure projects in NR, NCR and NER?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.