Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 5,026–5,050 / 34,220
Solar Capacity under PM-KUSUM
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5297 · Asked on 2026-03-25
Ministry: NEW AND RENEWABLE ENERGY
Member asked
We have not ingested the asking members for this question.
(a) the solar capacity achieved under Pradhan Mantri-Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) vis a vis the target of 35 GW; (b) the achievements made under Grid connected solar power plants and grid connected solar pumps and the reasons for low achievements along with the measures being taken by the Government to improve the situation; (c) whether there is any proposal under consideration to include solar pumps with capacities above 7.5 HP under the PM-KUSUM and if so, the details thereof and if not, the reasons therefor; and (d) the achievements under grid connected solar power plants and grid connected solar pumps in the State of Haryana along with the set targets?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGreen Energy Corridor Phase‑III Project in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5298 · Asked on 2026-03-25
Ministry: NEW AND RENEWABLE ENERGY
Member asked
Appalanaidu Kalisetti, Byreddy Shabari
(a) whether a proposal for the Green Energy Corridor Phase‑III project in Andhra Pradesh intended to evacuate renewable energy from solar and pumped storage plants to the State grid has been submitted to the Central Electricity Authority (CEA) or Ministry; (b) if so, the details of date of submission and the details of the proposed transmission capacity (MW), line length (km) and number of sub-stations; (c) whether the proposal has received any approval or clearance and if not, the reasons for delay; (d) whether funds have been sanctioned or allocated for the project at this stage and if so, the details thereof; and (e) the expected timeline for approval, commencement and completion once the proposal is accepted?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceTelecom Black Spots on National Highways
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5299 · Asked on 2026-03-25
Ministry: COMMUNICATIONS
Member asked
(a) whether the Government has conducted any study to detect the number of telecom black spots on National Highways where mobile networks are missing and if so, the details thereof, State-wise/UT-wise; and (b) the measures undertaken by the Government to resolve the issue of telecom black spots on National Highways?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational Monetisation Pipeline (NMP) 2.0
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5300 · Asked on 2026-03-25
Ministry: PLANNING
Member asked
Shrirang Barne, Naresh Mhaske, Shrikant Shinde, Atul Garg, Bharti Pardhi, Ravindra Waikar
(a) whether the Government has launched the National Monetisation Pipeline (NMP) 2.0 for the period FY 2026-2030 to monetise public infrastructure assets and if so, the details thereof and if not, the reasons therefor; (b) the total monetisation target under NMP 2.0 and the key infrastructure sectors identified particularly in the States of Maharashtra and Madhya Pradesh; (c) whether the programme aims to attract private investment and improve asset utilisation efficiency and if so, the details thereof and if not, the reasons therefor; (d) the details of institutional mechanism established for transparent implementation and monitoring; and (e) the details of expected impact on infrastructure development, fiscal sustainability and long-term economic growth?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGenerative Artificial Intelligence
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5301 · Asked on 2026-03-25
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) whether the Government has taken steps to promote and support startups working in Generative Artificial Intelligence (GenAI) and related technologies; (b) if so, the details of funding incubation and research support programmes launched under Digital India, MeitY Startup Hub or other national innovation missions; (c) whether Bengaluru, being India’s leading technology and innovation hub has been identified for special GenAI incubation clusters or research centres and if so, the details thereof; (d) the number of Artificial Intellgence (AI) or GenAI startups currently operating in Bengaluru and the support extended to them; and (e) the future plans to strengthen India’s global leadership in AI innovation while ensuring responsible and ethical use of Generative AI technologies?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDistribution of Fortified Rice under PDS
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5302 · Asked on 2026-03-25
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware of the fact that fortified rice is being distributed to beneficiaries under the Public Distribution System (PDS) to address deficiencies of vitamins and minerals and if so, the details thereof; (b) whether it has come to the notice of the Government that a large number of beneficiaries avoid consuming this fortified rice due to its different appearance, either use it for other purposes or discard it as waste and if so, the details thereof; (c) the total amount of money spent by the Government on the distribution of fortified rice during the last three years and the steps being taken by the Government to ensure that the nutritional benefits of this scheme actually reach the beneficiaries; and (d) whether the Government has undertaken any public awareness or sensitization programmes to educate people about the health benefits of fortified rice and to prevent wastage of public funds and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRegulation of Private Operators in Nuclear Sector
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5303 · Asked on 2026-03-25
Ministry: ATOMIC ENERGY
Member asked
(a) the manner in which the Government plans to regulate private entities now permitted to operate nuclear plants and the safety protocols established for these partnerships; (b) the reason for the shift to an ‘exclusive operator liability’ model and the manner in which it aligns with international nuclear conventions; and (c) whether the Government has received any formal proposals from domestic private firms for setting up captive nuclear power units following the passage of the Act and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePM-SGMBY in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5304 · Asked on 2026-03-25
Ministry: NEW AND RENEWABLE ENERGY
Member asked
Kesineni Sivanath, B. K. Parthasarathi, Daggumalla Prasada Rao
(a) the number of applications received, installations completed and Central Financial Assistance (CFA) disbursed under Pradhan Mantri-Surya Ghar Muft Bijli Yojana (PM-SGMBY), State and district-wise in Andhra Pradesh; (b) the details of the number of rooftop solar installations vendor registered under the scheme, State-wise; (c) the details of the number of Rooftop solar installations where net meters and smart meters have been installed, State and district-wise in Andhra Pradesh; (d) the type of metering agreements approved in Andhra Pradesh, district-wise; (e) the details of the number of functional Rooftop solar installations along with the amount of electricity generated, State and district-wise in Andhra Pradesh; (f) the number of districts under the scheme where challenge mode has been announced; and (g) the details of villages that have been chosen as model solar villages under the scheme in Andhra Pradesh, district-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceVacant Posts in Civil Services
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5305 · Asked on 2026-03-25
Ministry: PERSONNEL, PUBLIC GRIEVANCES AND PENSIONS
Member asked
(a) whether a large percentage of sanctioned strength of Civil Service posts are lying vacant presently and if so, the details thereof and the reasons therefor; (b) whether the Government has taken any assessment of the impact of the shortage of IAS, IPS and IFS officers in the functioning of these services and if so, the details thereof; and (c) the details of vacant posts in each service and the measures taken by the Government to fill these vacancies?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceExpansion of Nuclear Power Capacity
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5306 · Asked on 2026-03-25
Ministry: ATOMIC ENERGY
Member asked
(a) the details of the current nuclear power capacity along with the reactors under construction; (b) the details of safety measures adopted in this regard; (c) the details of the international cooperation agreements signed; and (d) the details of the target capacity set to be acheived by 2030?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInstallation of BSNL Mobile Towers in Dindigul
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5307 · Asked on 2026-03-25
Ministry: COMMUNICATIONS
Member asked
We have not ingested the asking members for this question.
(a) whether the Department has any proposal to install BSNL mobile towers to improve network coverage in Kombai Panchanthangi and Ayyalur Town Panchayat and Kovilur Town Ramanathapuram Panchayat in Dindigul district; (b) if so, the details of the approved projects, including the timeline for installation and commissioning; (c) whether the Government has taken or proposes to take any steps to improve mobile and internet connectivity in Periyathirumangalam village, Gudalur West Panchayat in Karur district and Srirampuram Panchayat, Vedasandur Block in Dindigul district which are currently experiencing poor network coverage; and (d) if so, the details of the measures taken or proposed including augmentation of BSNL services and timelines thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceClean Coal Technology
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5308 · Asked on 2026-03-25
Ministry: COAL
Member asked
(a) whether the Government has implemented any new policy in the year 2025-26 to reduce carbon emissions from coal-based thermal power plants; (b) if so, the details of the provisions made under this policy for the utilisation of clean coal technology; (c) whether the Government is conducting research projects to promote Carbon Capture and Utilization (CCU) technologies; (d) if so, the current status of the said research projects; (e) whether the Government is providing financial assistance to make thermal power plants compliant with environmental standards; and (f) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceVigyan Jyoti Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5309 · Asked on 2026-03-25
Ministry: SCIENCE AND TECHNOLOGY
Member asked
(a) the specific aims and objectives of the Vigyan Jyoti Programme; (b) whether the Vigyan Jyoti Programme has been implemented in any district of Uttar Pradesh including the district of Baghpat and if so, the details thereof; (c) the district-wise total number of girl students covered under this programme in the identified districts of Uttar Pradesh including Baghpat; (d) the details of the facilities and benefits being provided to these girl students under the said scheme, district-wise; and (e) the total budgetary allocation sanctioned for the Vigyan Jyoti Programmme in the State of Uttar Pradesh and the mechanism established for its distribution?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePMGDISHA and CSC Initiatives in Uttar Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5310 · Asked on 2026-03-25
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) the number of Common Service Centres (CSCs) operational in Mau district including Ghosi constituency during 2024-26 along with the range of services provided; (b) the number of beneficiaries trained under the Pradhan Mantri Gramin Digital Saksharta Abhiyan (PMGDISHA) in the district during the said period; (c) the funds released under PMGDISHA and CSC-related initiatives in Uttar Pradesh and the expenditure incurred in Mau district; (d) whether any review or evaluation has identified digital access gaps or connectivity challenges in rural areas of the district and if so, the details thereof; and (e) the steps taken by the Government to strengthen digital access and digital literacy in Ghosi?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceKolhapur-Vaibhavwadi Rail Line
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5311 · Asked on 2026-03-25
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government proposes new train services/rail connectivity for Kolhapur; (b) the details of the status of Kolhapur-Vaibhavwadi rail line; and (c) the timeline by when the said project is likely to be completed?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDigital-First Content Strategy by Prasar Bharati
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5312 · Asked on 2026-03-25
Ministry: INFORMATION AND BROADCASTING
Member asked
Jugal Kishore, Vishweshwar Hegde Kageri, Nalin Soren, Bhojraj Nag, Mala Rajya Laxmi Shah, Sanjay Jaiswal, Naba Charan Majhi, Chandra Prakash Joshi, Vijay Baghel
(a) whether the Government has achieved the target of 80 per cent digital transmitter coverage for All India Radio (Akashvani) following the increased allocation for the Broadcasting Infrastructure Network Development (BIND) scheme; (b) if so, the details thereof; (c) the manner in which the global viewership of Indian cultural content and archival National Heritage programmes has increased since the launch of Prasar Bharati's OTT platform in late half of 2025; (d) the progress made so far under the 'Digital-First Content Strategy' by Prasar Bharati; and (e) whether the Government has successfully ensured the compliance with the provisions of the Sports Broadcasting Signals (Mandatory Sharing with Prasar Bharati) Act, 2007 for all major international sporting events held during 2025-26?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUranium Supply Contract
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5313 · Asked on 2026-03-25
Ministry: ATOMIC ENERGY
Member asked
Krishna Prasad Tenneti, Dulu Mahato, K. Sudhakar, P. P. Chaudhary, Sanjay Jaiswal, Janardan Mishra, Shankar Lalwani
(a) whether the Government has finalised the CAD 2.6 billion uranium supply contract with Cameco for 10,000 tonnes of Uranium Ore Concentrates and if so, the details thereof; (b) the manner in which this agreement is likely to ensure a stable fuel supply for India’s 24 operating reactors and the indigenous 700 MW PHWRs under construction; (c) the details of positive implications this deal is likely to have for the ‘Viksit Bharat’ 100 GW nuclear power target and whether similar negotiations are underway with Kazakhstan and Uzbekistan and if so, the details thereof; (d) whether the Government has observed a reduction in the cost of power for imported fuel-based reactors after the Basic Customs Duty exemption on non-irradiated nuclear fuel announced in the 2026 Budget and if so, the details thereof; and (e) the manner in which the Department of Atomic Energy is working with the Ministry of External Affairs to secure overseas uranium mining rights and reduce exposure to global price volatility?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDistribution and Monitoring of Pulses, Sugar and Salt under NFSA in Assam
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5314 · Asked on 2026-03-25
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether pulses, sugar and salt are being distributed in addition to foodgrains under the National Food Security Act, 2013 in Assam and if so, the details of the quantity allocated and actually distributed during the last five years; (b) the details of the number of beneficiaries covered under such additional commodities, category-wise (PHH/AAY); (c) whether the distribution is regular across all districts of the said State and if so, the details thereof; and (d) the details of the mechanism put in place for procurement, quality testing, storage, transportation and end-to-end monitoring of these commodities to ensure timely supply and prevent diversion under the Public Distribution System in Assam?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConversion of Silchar Local Passenger Trains into DEMU Services
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5315 · Asked on 2026-03-25
Ministry: RAILWAYS
Member asked
(a) whether the Government proposes to convert local passenger trains operating from Silchar in Cachar district into Diesel Electric Multiple Unit (DEMU) services to reduce terminal delays; (b) if so, the details of trains identified for conversion; and (c) the expected operational benefits for the Barak Valley region?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSemiconductor Mission 2.0 in Tirupati
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5316 · Asked on 2026-03-25
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
(a) whether any semiconductor manufacturing equipment, materials or design projects are proposed or approved under India Semiconductor Mission 2.0 in Andhra Pradesh, particularly in or around Tirupati Parliamentary Segment; (b) if so, the details thereof including location, investment and employment potential; (c) if not, the reasons therefor; and (d) whether the Government proposes to include Tirupati region under semiconductor skill development and training initiatives?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRailway Sidings and Weighbridges in Chhattisgarh
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5317 · Asked on 2026-03-25
Ministry: RAILWAYS
Member asked
(a) the total number of private, public (departmentally owned) and PSU/Joint Venture sidings currently operational in Chhattisgarh along with their respective alpha codes and serving stations; (b) the names of the specific industries, departments and companies functionally connected to each of these sidings for commercial operations; (c) the details of weighbridges installed at these sidings specifically the number of In-motion versus Static weighbridges; (d) whether these are maintained through Annual Maintenance Contracts (AMCs) approved by the Railways and if so, the details thereof; (e) whether the Railways has a mechanism to monitor the calibration and accuracy of these weighbridges and if so, the details thereof; and (f) whether any instances of tampering, weight irregularities, or malpractices have been reported at these sidings during the last three years and if so, the details and the punitive action taken by the Government in each case, siding-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePost Office Regulations
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5318 · Asked on 2026-03-25
Ministry: COMMUNICATIONS
Member asked
(a) whether it is a fact that the Director General of Postal Services has taken any decision to solve the confusion over delivery of items addressed to dead persons and if so, the details thereof; (b) whether it is also a fact that the confusion persists because of an interplay between two provisions of the Post Office Regulations and if so, the details thereof; (c) whether it is also a fact that in a recent judgement, the Hon’ble Madras High Court has asked the Director General of Postal Services to comply with its order and take further action as may be necessary to solve the confusion and if so, the details thereof; and (d) whether the Director General of Postal Services is considering to either amend the year 2024 Regulations or fill in the gap by clarifying the position properly on the above issue?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOne Nation One Ration Card
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5319 · Asked on 2026-03-25
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
Manoj Tiwari, Dineshbhai Makwana, Hemang Joshi, Raghunandan Rao, Chintamani Maharaj, Anoop Pradhan, Himadri Singh, Ravi Kishan, Anurag Sharma, Bhartruhari Mahtab, Bidyut Baran Mahato, Bhojraj Nag, Mala Rajya Laxmi Shah, Naba Charan Majhi, Manish Jaiswal, Alok Sharma, Avimanyu Sethi, Vishweshwar Hegde Kageri, Janardan Mishra, Haribhai Patel, Aparajita Sarangi, Balabhadra Majhi, Bhola Singh
(a) the number of beneficiaries currently availing the portability facility in the country under the 'One Nation One Ration Card' (ONORC) scheme particularly in Chhattisgarh especially in Kanker, Kondagaon, Balod and Dhamtari districts and Bhopal Lok Sabha Constituency, Nabarangpur Lok Sabha Constituency of Odisha, Jharkhand particularly Hazaribagh and Ramgarh, Bharatpur Lok Sabha Constituency, Shahdol Lok Sabha Constituency, Uttar Pradesh and Chhattisgarh particularly the Surguja Region; (b) whether the Government has assessed migration trends as reflected through portability transactions under ONORC scheme in the country particularly among migrant workers and economically vulnerable groups especially in the districts of Bharatpur Lok Sabha Constituency and if so, the details thereof including key finding regarding seasoned and long term migration trends; (c) the number of inter-State and intra-State portability transactions recorded during the last two years in the country including Nabarangpur Lok Sabha Constituency and Uttar Pradesh specially in Bulandshahr district; (d) whether data is available specifically for Chhattisgarh particularly the Surguja region regarding beneficiaries and portability transactions; (e) the steps taken by the Government to ensure seamless availability of ration for migrant workers and other beneficiaries under the scheme; (f) whether awareness camps and technological improvements have been undertaken to strengthen the effective implementation of ONORC; (g) the steps proposed to further enhance portability, transparency and accessibility of ration cards under the scheme across all State and UTs; and (h) the measures adopted to strengthen digital monitoring and grievances redressal mechanism under the Public Distribution System (PDS)?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGSI Next Generation Portal
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5320 · Asked on 2026-03-25
Ministry: MINES
Member asked
Bhola Singh, Hemant Savara, Vishnu Dayal Ram, Ananta Nayak, Mahesh Kashyap, Khagen Murmu, Dharambir Singh Chaudhary
(a) whether the Government has successfully launched the GSI Next-Generation (NG) Portal to provide Industry and research institutions cloud-enabled, AI-based data analysis for mineral exploration and if so, the details thereof; (b) the manner in which the National Geoscience Data Repository (NGDR) portal has increased investment and improved the Ease of Doing Business benefiting even industrial States like Gujarat; (c) the success milestones of the Tranche-II Exploration Licence (EL) auctions and the number of private firms that have been onboarded for deep-seated mineral search; (d) whether the National Mineral Exploration and Development Trust (NMEDT) has successfully completed its target of 327 exploration projects as of early 2026 and if so, the details thereof; (e) the steps taken to strengthen private sector participation in mineral exploration in the country; (f) whether the Government has taken steps to strengthen mineral exploration and data accessibility in Odisha particularly in Keonjhar Lok Sabha constituency and if so, the details thereof; (g) whether any mineral exploration or geological surveys are proposed in Haryana including Bhiwani-Mahendergarh region and if so, the details thereof; and (h) the details of steps taken by the Government to promote rare earth mineral exploration in the Country?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceTender of Offshore Wind Energy
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 5321 · Asked on 2026-03-25
Ministry: NEW AND RENEWABLE ENERGY
Member asked
We have not ingested the asking members for this question.
(a) whether it is true that the offshore wind energy tender proposed off the Tamil Nadu coast in the Gulf of Mannar has been delayed beyond the earlier target timeline of February, 2026 and if so, the details thereof; (b) the status of the proposed 500 MW offshore wind project supported by Viability Gap Funding (VGF) and the timeline for release of such support; (c) the renewable energy capacity addition during the year 2025–26, State-wise including wind and solar installations in Tamil Nadu; and (d) the steps taken by the Government to expedite renewable energy investments and power sale agreements for projects proposed in Tamil Nadu?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source