Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 4,301–4,325 / 34,220
Rice Fortification Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6011 · Asked on 2026-04-01
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) the objectives and features of the Rice Fortification Programme; (b) the total quantity of fortified rice distributed under the programme so far through the Public Distribution System, the Mid-Day Meal Scheme and the Integrated Child Development Services; (c) the funds allocated and utilised for the implementation of the programme within Tamil Nadu so far; (d) whether the Government has conducted any evaluation or scientific study regarding the effectiveness of fortified rice in addressing malnutrition and micronutrient deficiencies; and (e) the details of the steps taken by the Government to ensure quality control, safety standards and awareness among beneficiaries regarding the benefits of fortified rice under this programme?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMobilising Investment for Green Hydrogen Production
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6012 · Asked on 2026-04-01
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) whether it is a fact that the National Green Hydrogen Mission (NGHM) targets 5 million tonnes of production by the year 2030 and if so, the details thereof; (b) whether it is also a fact that the country’s plan to reach 500 GW of non-fossil capacity by the year 2030 would require an investment of around Rs. 30 lakh crore and if so, the details thereof; (c) whether it is also a fact that the Government plans to mobilize the required investment through green bonds, blended finance structures and multilateral participation alongside growing interest from global investors seeking long term stable returns; and (d) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUnited States–India Joint Statement
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6013 · Asked on 2026-04-01
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
We have not ingested the asking members for this question.
(a) the manner in which the Government reconciles its commitment under the United States–India Joint Statement to “reduce barriers to digital trade” with India’s data localisation rules, cross-border data regulations and broader digital framework; (b) whether any policy changes are proposed to protect regulatory autonomy; (c) if so, whether these commitments could restrict India’s ability to mandate local storage of critical data, limit foreign access to sensitive digital infrastructure or regulate Artificial Intelligence (AI) now or in the future; (d) if so, details of critical infrastructure —such as financial systems, digital identity, health and welfare databases, telecom networks and AI datasets—are affected and to what extent and if not, the reasons therefor; and (e) the details of the safeguards ensuring these commitments do not weaken India’s ability to use domestic data for indigenous AI development, domestic value creation and strategic digital autonomy particularly regarding data localisation, market access conditions, cross-border restrictions and technology transfer?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInclusion of Bagaha Station in Amrit Bharat Station Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6014 · Asked on 2026-04-01
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether Bagaha station has not been covered under the Amrit Bharat Station Scheme despite the fact thousands of passengers commute daily for various stations across the country from the said station, yielding a daily revenue of over rupees two and a half lakh to the Railways and if so, the details thereof; (b) whether other stations in Bihar similar to the category of Bagaha station have also been covered under the said scheme and if so, the details thereof; (c) whether Bagaha is a police district and sub-divisional headquarters which share its boarding with Uttar Pradesh and Nepal as a resultant inter-state and international passengers also board trains from Bagaha station and if so, the details thereof; and (d) whether the Government is likely to cover Bagaha station under the said scheme and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWeather Monitoring and Climate Research Station
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6015 · Asked on 2026-04-01
Ministry: EARTH SCIENCES
Member asked
(a) whether the Government proposes to expand its network of weather monitoring and climate research stations in the country and if so, the details thereof; (b) whether any new meteorological or climate research centres are proposed in Haryana, if so, the details thereof; and (c) whether the drought-prone Bhiwani–Mahendragarh region has been considered for such facilities if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDMCs of FCI
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6016 · Asked on 2026-04-01
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
We have not ingested the asking members for this question.
(a) the organizational structure of Damage Monitoring Cells (DMCs) of Food Corporation of India (FCI) in Punjab, divisional, regional and zonal-wise; (b) the details of the number of damage cases have been investigated during the last five years along with number of cases that resulted in disciplinary action; (c) whether any technological tools are being piloted / used in Punjab to monitor stock health and reduce wastage; and (d) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRevival of Bharat Sanchar Nigam Limited
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6017 · Asked on 2026-04-01
Ministry: COMMUNICATIONS
Member asked
(a) the total financial assistance approved by the Government for the revival of the Bharat Sanchar Nigam Limited and the expansion of its 4G/5G network since 2014; (b) the details of the funds utilised, item and work-wise; (c) the name of the cities/districts of the country where BSNL's 4G/5G services are currently operational; (d) whether it is a fact that BSNL's network remains weak in many rural and remote areas and that 4G/5G services have not yet been launched in many districts despite significant financial support from the Government and if so, the reasons therefor; (e) whether the Government proposes to formulate a time-bound plan to expeditiously launch Bharat Sanchar Nigam Limited's 4G/5G services in the remaining districts and rural areas; and (f) if so, the details thereof and the time by which it is likely to be implemented?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSubordinate Legislation Management System
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6018 · Asked on 2026-04-01
Ministry: PARLIAMENTARY AFFAIRS
Member asked
Rao Rajendra Singh, Mala Rajya Laxmi Shah, Raghunandan Rao, Smita Wagh, Kamaljeet Sehrawat
(a) the current status of implementation of the Subordinate Legislation Management System (SLMS) across Ministries/Departments of the Union Government; (b) the number of Ministries/Departments that have been onboarded onto the SLMS portal since its launch; (c) the number of subordinate legislations processed through the system so far; (d) whether the system provides for digital tracking of the various stages of drafting, vetting, framing, laying and scrutiny of subordinate legislation before Parliament and if so, the details thereof; (e) whether the Government has conducted any training programmes or capacity building initiatives for official of Ministries to facilitate effective use of the portal and if so, the details thereof; and (f) the details of the measures taken by the Government to ensure timely framing, laying and review of subordinate legislation through the use of the SLMS portal?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceTelecom Infrastructure Works
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6019 · Asked on 2026-04-01
Ministry: COMMUNICATIONS
Member asked
(a) the details of telecom infrastructure works completed or sanctioned since 2019 (towers, fibre kms, BharatNet, PM-WANI) in West Bengal, district and year-wise; (b) the details and the number of USOF-funded towers sanctioned/installed in each district since 2019; and (c) the timeline and plan for achieving full 5G coverage in West Bengal?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceIncomplete Rail Infrastructure Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6020 · Asked on 2026-04-01
Ministry: RAILWAYS
Member asked
(a) whether several railway infrastructure projects including the Amrit Bharat Station Scheme are lying incomplete running behind schedule and if so, the details thereof and the reasons therefor; (b) the details of such projects running behind schedule including the Jaipur Division in Rajasthan along with the reasons therefor, division-wise and since when these projects have been running behind schedule; and (c) the steps taken/being taken by the Government to ensure timely completion of these projects and to prevent cost overruns?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePublications on Social and Environmental Statistics
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6021 · Asked on 2026-04-01
Ministry: STATISTICS AND PROGRAMME IMPLEMENTATION
Member asked
Parbhubhai Vasava, Anup Dhotre, Haribhai Patel, Bibhu Prasad Tarai
(a) the number of thematic statistical publications on social and environmental indicators released by the Government during the last five years, year-wise; (b) whether the Government has a centralized repository or digital platform to ensure public access to these statistical publications; (c) if so, the details thereof; (d) whether the Government has conducted any review or assessment regarding the utilization of these publications by policymakers, research institutions and academic organizations; (e) if so, the details thereof; and (f) the steps taken by the Government to improve the dissemination and accessibility of these statistical reports among researchers, policymakers and the general public and to create public awareness regarding the same?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRevenue from Advertisements
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6022 · Asked on 2026-04-01
Ministry: RAILWAYS
Member asked
(a) the details of revenue earned from advertisements displayed inside trains, on train exteriors, and at railway stations since 2022, zone and year-wise; (b) the details of advertising agencies, vendors empanelled and awarded contracts for such advertisements during such period; zone-wise; (c) the details of the advertisements displayed and the duration of such display during such period, brand-wise; (d) whether any guidelines exist regarding content standards and approval mechanisms for advertisements displayed in trains and if so, the details thereof; and (e) the details of complaints received regarding objectionable advertisements during such period?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceOrange Economy Initiatives
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6023 · Asked on 2026-04-01
Ministry: INFORMATION AND BROADCASTING
Member asked
(a) whether the Government has successfully operationalised the ‘Orange Economy’ initiatives as outlined in the 2026-27 Budget specifically the setting up of Animation, Visual Effects, Gaming and Comics (AVGC) Content Creator Labs in 15,000 secondary schools and if so, the details thereof; (b) whether the AVGC sector being a growing industry is likely to require two million professionals by 2030 and if so, the details thereof; (c) the manner in which the newly launched WaveX startup accelerator helped the first cohort of 51 Media-Tech startups in securing global IP (Intellectual Property) rights for AI-driven animation and gaming; (d) whether the Government has finalised the establishment of the National Centre of Excellence (NCoE) for AVGC in Mumbai, if so, the details of its projected capacity for year one student intake; and (e) the manner in which the ‘Create in India’ Challenge being utilised in 2026 to identify and fund grassroots content creators from Tier-II and Tier-III cities to compete on global OTT platforms?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceIntroduction of High Speed Trains
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6024 · Asked on 2026-04-01
Ministry: RAILWAYS
Member asked
(a) the details of the total route kilometres added during the last three years; (b) the details of the progress of track electrification works; (c) the details of the number of semi-high-speed trains introduced; and (d) the details of the capital expenditure incurred on modernization?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceVande Bharat Sleeper Rakes in Telangana
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6025 · Asked on 2026-04-01
Ministry: RAILWAYS
Member asked
whether the Government proposes manufacturing and network expansion for Vande Bharat sleeper rakes in Telangana and if so, the details of manufacturing and Network expansion plan and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePerformance of North East Venture Fund
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6026 · Asked on 2026-04-01
Ministry: DEVELOPMENT OF NORTH EASTERN REGION
Member asked
(a) the number of startups and enterprises funded under the North East Venture Fund (NEVF) during the last three years, State-wise; (b) the total amount of investment approved and disbursed under the fund during the said period; (c) the distribution of enterprises supported under the fund, sector-wise; and (d) the number of jobs generated by enterprises supported through the fund in the North Eastern Region?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConstruction of Kottakadavu ROB
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6027 · Asked on 2026-04-01
Ministry: RAILWAYS
Member asked
(a) whether the proposal for construction of the Kottakadavu Rail Over Bridge (ROB) near Vadakara Railway Station in Kerala has been pending for the last two decades and if so, the details thereof; (b) the reasons for the delay in sanctioning and executing the said project; (c) whether the Government is aware that non-construction of the ROB is causing severe traffic congestion on National Highway-66 and posing safety risks to commuters and if so, the details thereof; (d) whether any technical feasibility study/cost estimate has been prepared for the said project and if so, the present status thereof; (e) whether the Government proposes to sanction and execute the project at the earliest and if so, the details thereof; and (f) the details of the expected timeline for commencement and completion of the said Rail Over Bridge?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSolar Energy Generation in Bihar
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6028 · Asked on 2026-04-01
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) the efforts being made by the Government to increase the solar energy generation capacity in Bihar; (b) whether the Government has received any proposal to set up new solar parks in Bihar particularly in Adhaura of Kaimur district; (c) if so, the details thereof; and (d) the time by which the solar power plants are likely to be set up in Bihar?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBeach Sand Minerals
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6029 · Asked on 2026-04-01
Ministry: ATOMIC ENERGY
Member asked
(a) the total production of raw Beach Sand Minerals (BSM) in the country particularly in Andhra Pradesh including Kakinada during the last five years, year, State and District-wise; (b) total production of value-added BSM including ilmenite, rutile, zircon and rare earth concentrates during said period, year, State and district-wise for Andhra Pradesh; (c) whether Government has formulated a comprehensive strategy for developing end-to-end value addition chains for BSM and titanium from mining to advanced manufacturing; (d) if so, the details thereof including schemes, funding pattern and projects proposed in coastal States such as Andhra Pradesh; (e) whether private entities are permitted to mine and process BSM and if so, the quantity and value produced by them; (f) the details of safeguards put in place to curb illegal mining and exports; and (g) the measures taken by the Government to promote domestic beneficiation, technology acquisition and strategic capacity building in the BSM sector?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBroadcasting of Programming Pattern and Editorial Content on DD Podhigai
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6030 · Asked on 2026-04-01
Ministry: INFORMATION AND BROADCASTING
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has reviewed the programming pattern and editorial content broadcast on DD Podhigai during the last five years; (b) if so, the details of programme categories telecast and expenditure incurred along with editorial approval mechanisms followed under Prasar Bharati; (c) whether the Government proposes to issue guidelines or strengthen oversight mechanisms to ensure that DD Podhigai reflects pluralism, regional diversity and constitutional neutrality in its programming; and (d) if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStrengthening Cyclone Forecasting and Early Warning Systems
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6031 · Asked on 2026-04-01
Ministry: EARTH SCIENCES
Member asked
(a) whether the Government has undertaken any initiatives to further strengthen cyclone forecasting and early warning systems particularly for the Odisha coastline during the last three years; (b) the details of technological upgrades and observational infrastructure installed by the India Meteorological Department along the eastern coast, particularly in Odisha; (c) whether the additional Doppler Weather Radars, ocean buoys or coastal monitoring stations have been proposed for the State; and (d) the steps taken/being taken by the Government to improve accuracy of cyclone prediction and timely dissemination of warnings to vulnerable coastal communities?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMumbai Urban Transport Project
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6032 · Asked on 2026-04-01
Ministry: RAILWAYS
Member asked
Bharti Pardhi, Shrikant Shinde, Ravindra Waikar, Shrirang Barne, Atul Garg, Naresh Mhaske
(a) the details of the total funds allocated, released and utilised under MUTP (Mumbai Urban Transport Project)-3 and MUTP-3A, year-wise; (b) the details of the list of projects completed till date including new lines, additional tracks, signalling works and rolling stock procurement; (c) the details of the physical and financial progress of ongoing works such as fifth/sixth lines and station upgrades; (d) whether any cost escalation has occurred and if so, the details and the reasons therefor; and (e) the revised timelines for completion of pending projects and their expected impact on commuter capacity?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImprovement of CPGRAMS
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6033 · Asked on 2026-04-01
Ministry: PERSONNEL, PUBLIC GRIEVANCES AND PENSIONS
Member asked
(a) the details of the total number of complaints received, resolved and pending in the Centralised Public Grievance Redress and Monitoring System (CPGRAMS) during the last ten years and the current year, Ministry, State/Union Territory and year-wise; (b) whether CPGRAMS is maintaining a constant and satisfactory rate of grievance redressal across Ministries and States/UTs and if so, the details thereof and if not, the reasons therefor; (c) the steps taken or proposed to be taken by the Government to ensure that pending complaints are resolved within a time-bound framework including timelines by which the remaining backlog is likely to be cleared; and (d) whether the Government has prepared a time-bound action plan to improve the efficiency of CPGRAMS so that grievances are addressed promptly and on a near-immediate basis and if so, the details of such a roadmap and implementation schedule and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRedevelopment of Tirunelveli Junction Railway Station
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6034 · Asked on 2026-04-01
Ministry: RAILWAYS
Member asked
(a) whether the Government is aware of the fact that the redevelopment of Tirunelveli Junction Railway Station was announced originally at an outlay of Rs. 270 crores which was reduced to Rs. 99 crores which was further curtailed to Rs. 77 Crore and if so, the details thereof; (b) the details of the reasons of such lopsided and reduced allocation of funds; and (c) the details of such other railway stations for which the final expenditure was less than the originally announced outlay and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceIncentives under SIGHT Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 7 · Question no. 6035 · Asked on 2026-04-01
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) the details of quantum and types of financial incentives sanctioned under the Strategic Interventions for Green Hydrogen Transition (SIGHT) Programme; (b) the amount disbursed to project developers and manufacturers under SIGHT Programme so far; (c) whether these incentives have resulted in a reduction in the cost of green hydrogen production and if so, the details thereof; and (d) the norms adopted for monitoring cost competitiveness in this regard?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.