Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 3,326–3,350 / 34,220
Promotion of Coal Gasification for Energy Security
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 524 · Asked on 2026-07-22
Ministry: COAL
Member asked
We have not ingested the asking members for this question.
(a) the status of coal gasification projects approved, under implementation and proposed across the country and the extent to which such projects are expected to reduce dependence on imports of liquefied natural gas, methanol, ammonia, fertilizers and other industrial feedstocks; (b) the role envisaged for coal gasification in strengthening country's energy security, promoting value addition to domestic coal resources and supporting the development of downstream sectors such as chemicals, petrochemicals, fertilizers, hydrogen and clean-fuel production; (c) the policy measures adopted by the Government for facilitating technology transfer, attracting investments and accelerating the establishment of coal gasification projects; (d) the details of financial support, incentives and assistance extended by the Government under coal gasification promotion schemes and allied programmes during the last five years, year-wise; and (e) the estimates prepared by the Government regarding investment mobilisation, employment opportunities, import substitution and industrial growth to result from such projects?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePM-SGMBY in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 525 · Asked on 2026-07-22
Ministry: NEW AND RENEWABLE ENERGY
Member asked
(a) the number of households registered under the Pradhan Mantri-Surya Ghar Muft Bijli Yojana (PM-SGMBY) in the country since its inception, State-wise and district-wise for Maharashtra particularly in Parbhani Lok Sabha Constituency; (b) the number of households where solar panels have been installed under PM-SGMBY, State-wise and district-wise for Maharashtra particularly in Parbhani Lok Sabha Constituency; (c) the targeted number of households likely to be registered under this yojana, State-wise and district-wise for Maharashtra particularly in Parbhani Lok Sabha Constituency; (d) whether pucca houses are required to install solar panels under this yojana; (e) if so, the provisions made for installing solar panels on households having no kuccha houses; and (f) the quantum of electricity generated under this yojana along with the time-limit prescribed to complete this yojana particularly in Parbhani Lok Sabha Constituency?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSeminars Organised by National Commission for Minorities
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 526 · Asked on 2026-07-22
Ministry: MINORITY AFFAIRS
Member asked
(a) whether the National Commission for Minorities has organised seminars, conferences and outreach programmes during 2026 and if so, the details thereof; (b) whether the Commission has commissioned or completed research studies relating to minority welfare and socio-economic development and if so, the details and the objectives thereof; (c) whether the findings and recommendations of such studies have been considered for policy formulation and implementation of minority welfare programmes and if so, the details thereof; (d) whether the Government has undertaken institutional outreach and coordination with State Minorities Commissions particularly in Maharashtra to improve implementation of minority welfare schemes and if so, the details thereof; and (e) whether the Government proposes to strengthen awareness, outreach and access to minority welfare programmes particulaly in Maharashtra including Jalgaon Lok Sabha Constituency and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSpecial Package for Sugarcane Dues
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 527 · Asked on 2026-07-22
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether the Government proposes to introduce a special budget package to ensure payment of crores of rupees of dues to sugarcane farmers pending for years against private sugar mills like Shamli and Thana Bhawan of Kairana Lok Sabha constituency and if so, the details thereof; (b) whether the Government is working on any specific research and seed replacement plan to prevent yield losses due to the outbreak of red rot disease on sugarcane crops in Western Uttar Pradesh and if so, the details thereof; (c) whether any new national policy is proposed to reduce the gap between the State Government's sugarcane price and the Central Government's fixed price for sugar mills and if so, the details thereof; and (d) whether the Government is preparing any scheme to provide direct dividends to the local farmers to promote ethanol production units in the sugarcane belt of Shamli and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNuclear Energy Mission for Viksit Bharat
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 528 · Asked on 2026-07-22
Ministry: ATOMIC ENERGY
Member asked
Nishikant Dubey, Jashubhai Rathva, Hemant Savara, Sanjay Jaiswal, Rahul Lodhi, Khagen Murmu, Anurag Sharma, Aparajita Sarangi, Jai Prakash
(a) the details of progress made under the Nuclear Energy Mission for Viksit Bharat including the roadmap for achieving 100 GW of nuclear power capacity by 2047; (b) the current status of development and deployment of Small Modular Reactors (SMRs) in the country; (c) the details of the measures taken by the Government to facilitate participation of the private sector in nuclear power generation while ensuring safety and regulatory oversight; and (d) the details of safeguards put in place or enhanced for nuclear safety, waste management and security under the revised policy framework including for existing Nuclear plants like Tarapur Atomic Power Station in Palghar district?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceKavach 4.0 Version in Locomotives
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 529 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether the Government had proposed to install Kavach 4.0 version in 10,000 locomotives across the country; (b) if so, the details of the respective States including Maharashtra and Madhya Pradesh and the number of locomotives in which Kavach 4.0 version have been installed; and (c) the number of remaining locomotives in the country particularly in State of Maharashtra and Madhya Pradesh where Kavach 4.0 version is to be installed so that the target of installation of Kavach 4.0 version in all locomotives may be met?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceTelecommunications (Television, Radio and Associated Services) Rules, 2026
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 53 · Asked on 2026-07-22
Ministry: INFORMATION AND BROADCASTING
Member asked
(a) whether the Government has released the draft Telecommunications (Television, Radio and Associated Services) Rules, 2026 to consolidate multiple existing broadcasting guidelines into a single regulatory framework under the Telecommunications Act, 2023; (b) if so, the details of key features proposed in these draft rules; (c) whether any timelines have been set for finalisation and implementation of the Rules; (d) if so, the details of measures proposed to support industry transition to the new regulatory framework; (e) the specific provisions made under this new framework to boost the emerging digital media, local broadcasters and community radio in Madhya Pradesh; and (f) whether the Government is likely to accord special priority in this policy to address the issues of poor digital connectivity and the lack of local broadcasting networks in the rural and remote areas of Chhindwara district as well as to establish new information centres and community radio stations there?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDigital Initiatives for Management of Hajj Pilgrimage
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 530 · Asked on 2026-07-22
Ministry: MINORITY AFFAIRS
Member asked
(a) the digital initiatives undertaken to improve the management of Hajj pilgrimage for Indian pilgrims during Hajj 2026; (b) the extent to which online systems have been implemented for application, selection, payment, accommodation and grievance redressal; (c) the details of measures taken to enhance the welfare of pilgrims including healthcare, accommodation, transportation and emergency assistance during Hajj 2026; and (d) whether the Government proposes to introduce any additional digital services or reforms to improve the Hajj experience in future and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFiber Cables under BharatNet Project
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 531 · Asked on 2026-07-22
Ministry: COMMUNICATIONS
Member asked
(a) the specifics of funds sanctioned, allocated and utilised under the BharatNet project, categorised by State, during the last three years; (b) the number of villages connected under the BharatNet Project till date; (c) the estimated timeline for connecting the remaining villages under the same project; and (d) the details about the standards set for fiber cables under BharatNet?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment of Technology-Driven Employment Ecosystem
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 532 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is implementing initiatives to promote electronics manufacturing, electronics component production, IT/ITeS employment and digital innovation across the country under programmes such as EMC 2.0, Digital India and other flagship schemes; (b) if so, whether the Government has assessed the potential of developing a technology-driven employment ecosystem including electronics manufacturing, IT/ITeS centres, electronics component assembly, digital incubation or innovation facilities in Katni, Panna and Khajuraho of the Khajuraho Lok Sabha Constituency; (c) if so, whether the Government is aware that the absence of such technology and knowledge-based infrastructure has constrained employment opportunities for educated youth in this predominantly rural and agriculture-based region; and (d) if so, the details of the proposals, incentives or special measures under consideration to promote investment, digital entrepreneurship, electronics manufacturing and IT-enabled employment in the region?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCommercial Stoppage of Ten Express Trains at Vapi Railway Station
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 533 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) whether it is a fact that Western Railway has sent a proposal to the Railway Board for commercial stoppages of Ten important express trains at Vapi Railway Station; (b) if so, the stage at which the proposal is currently pending and the reasons for the delay in its approval; (c) whether the Government intend to grant early approval for the stoppages of these trains, keeping in view the industrial, commercial, significance and passenger amenities at the said station, as well as the convenience of lakhs of passengers from Dadra and Nagar Haveli and Daman and Diu; and (d) if so, the tentative timeline for the said proposal and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePradhan Mantri Jan Vikas Karyakram
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 534 · Asked on 2026-07-22
Ministry: MINORITY AFFAIRS
Member asked
(a) the present status of implementation of the Pradhan Mantri Jan Vikas Karyakram (PMJVK) across the country, along with the details of funds allocated, sanctioned, released and expenditure incurred during the last five years, State/UT-wise particularly Kallakurichi Lok Sabha Constituency of Tamil Nadu; (b) the details of the number of projects sanctioned, in progress and completed under PMJVK in sectors such as education, skill development, health, sanitation and basic infrastructure, district-wise; (c) the criteria adopted for identification of minority concentration areas under the scheme and whether any revision or updation of such criteria has been undertaken in recent years and if so, the details thereof; (d) whether instances of delay, non-completion or cost escalation of projects have been reported and if so, the details thereof and the corrective measures taken thereon; and (e) the details of monitoring mechanisms, geo-tagging, third-party evaluation and social audit systems in place to ensure transparency and accountability?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRestoration of Abandoned Coal Mines
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 535 · Asked on 2026-07-22
Ministry: COAL
Member asked
Dean Kuriakose, K. C. Venugopal
(a) the number of discontinued and abandoned coal mines that have not undergone mandatory physical and biological-ecological restoration as per the 2022 mine closure guidelines, State-wise; (b) the number of fatal accidents, incidences of land subsidence and underground fires reported in and around these abandoned mines during the last three years; and (c) the details of specific actions taken by the Government to curb rampant illegal coal mining and theft, State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSkilled Manpower for Semiconductor Manufacturing Projects
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 536 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
K. Sudhakar, G. Lakshminarayana, Lavu Sri Krishna Devarayalu
(a) the details of semiconductor manufacturing projects approved under the India Semiconductor Mission, State-wise particularly in Karnataka and Andhra Pradesh; (b) the details of estimated requirement of skilled manpower for these projects along with the number of persons trained so far under Government-supported semiconductor skilling programmes; (c) whether any specialised training centres or Centres of Excellence are proposed in Karnataka and Andhra Pradesh to support the semiconductor ecosystem and if so, the details thereof; (d) the expected employment generation from the approved semiconductor manufacturing project in Karnataka and Andhra Pradesh; and (e) the details of steps taken by the Government to align higher educational institutions in Karnataka and Andhra Pradesh with the skill requirements of the semiconductor industry?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of BharatNet Project
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 537 · Asked on 2026-07-22
Ministry: COMMUNICATIONS
Member asked
(a) the current status of implementation of the BharatNet Project including the number of Gram Panchayats connected and made service-ready, State-wise; (b) the details of funds allocated, released and utilised under the project during the last three years; and (c) the measures taken to ensure last-mile broadband connectivity and affordable internet access in rural and remote areas and the measures taken to ensure last-mile broadband connectivity and affordable internet access in rural and remote areas?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMega Coaching Complex and Coach Washing Pit Project in Shisho Railway Station
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 538 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) the current status of the proposed Mega Coaching Complex and Coach Washing Pit project near Shisho Railway Station in Darbhanga Lok Sabha Constituency; (b) the action taken by the Government regarding approval, land availability funding and construction of the said projects since their announcement; (c) whether it is a fact that assurances have been given by the Government for past several years regarding the timely construction of this project but the work has not started till dates and if so, the details thereof; and (d) the concrete steps taken/being taken by the Government for implementation of the said project?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceINSPIRE Programme
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 539 · Asked on 2026-07-22
Ministry: SCIENCE AND TECHNOLOGY
Member asked
Krishna Prasad Tenneti, Mahima Kumari Mewar, Balabhadra Majhi
(a) the progress made under the Innovation in Science Pursuit for Inspired Research (INSPIRE) Programme during the last five years, including component-wise details of the number of students and young researchers supported, along with the number of students and young researchers supported component-wise particularly beneficiaries from Odisha and Nabarangpur Parliamentary Constituency; (b) whether the Government proposes to further strengthen the INSPIRE Programme to encourage meritorious students to pursue higher education and research in science; (c) if so, the details thereof; and (d) the measures taken to improve outreach, awareness and participation under the Programme, particularly in rural, remote and Aspirational Districts, including Nabarangpur Parliamentary Constituency in Odisha and Rajasthan and details of the beneficiaries covered thereunder?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceABSS for Waterlogging Prevention in Maharashtra and Madhya Pradesh
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 54 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
(a) the details of total funds allocated and actually utilised during the current year for Maharashtra and Madhya Pradesh under the 'Amrit Bharat Station Scheme' and other central funds to prevent waterlogging on railway tracks and to ensure uninterrupted suburban local train services during the monsoon; (b) whether any specific technical measures have been undertaken for raising the height of tracks and widening of culverts in low-lying areas across the Central and Western Railway zones and if so, the details thereof and if not, the reasons therefor; (c) the total number and operational status of high-capacity pumps deployed along the tracks to drain out rainwater during periods of heavy rainfall; (d) the details of institutional mechanism in place for joint coordination between the Railways and Urban Local Bodies for pre-monsoon desilting of drains and smooth discharge of water; and (e) whether any advanced digital technology/real-time micro-monitoring system has been deployed to identify and track chronic waterlogging spots across the suburban network and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceBiometric Exclusion Errors under ONORC Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 540 · Asked on 2026-07-22
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) the details of the total funds allocated versus utilized under the Integrated Management of Public Distribution System (IM-PDS) during the last three years and the total volume of inter-State transactions; (b) the details of the national percentage of Electronic Point of Sale (e-PoS) transaction failures caused by biometric degradation or server latency and the number of manual overrides logged on the Annavitran dashboard; (c) the volume of ration card portability failures reported in all the States including Chhattisgarh; and (d) the corrective policy measures being implemented by the Government to deploy alternative authentication mechanisms like Iris Recognition Imaging System (IRIS) scanners or offline smart-tokens to eliminate undocumented food exclusion errors among migrant and tribal beneficiaries?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceErosion-Prone Coastal Districts in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 541 · Asked on 2026-07-22
Ministry: EARTH SCIENCES
Member asked
(a) the details of shoreline change and coastal erosion assessed by the National Centre for Coastal Research (NCCR) along the Andhra Pradesh coast during the last five years, district-wise especially in Vizianagaram; (b) the details of coastal stretches identified as high, moderate and low erosion zones by the Government in the aforesaid districts of Andhra Pradesh, district-wise; (c) whether the Government has undertaken any site-specific coastal erosion assessments in the aforesaid districts and if so, the details of the findings and mitigation measures recommended thereunder; and (d) whether any assessment has been undertaken regarding the population, coastal habitations and infrastructure vulnerable to coastal erosion in the aforesaid districts and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAvailability of Railway Accommodation for Pilgrims to Rameswaram
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 542 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware that people travelling for pilgrimage to Rameswaram are often unable to obtain confirmed railway tickets even immediately after the opening of reservations, resulting in a large number of waitlisted passengers and if so, the details thereof; (b) whether Government has assessed the demand for sleeper class accommodation in long-distance trains serving Rameswaram and the adequacy of the existing coach composition and if so, the details thereof; (c) the details of the average waitlist position, coach composition and lower berth allotment for senior citizens in major long-distance trains originating from/terminating at Rameswaram during the last three years, year-wise; (d) whether the Government proposes to introduce new trains to and from Rameswaram and augment sleeper coaches in existing trains to meet the growing demand of pilgrims and other passengers and if so, the details thereof; and (e) the steps taken by the Government to ensure timely confirmation of tickets and availability of lower berths for senior citizens travelling to and from Rameswaram?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceKavach Expansion Project in Tamil Nadu
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 543 · Asked on 2026-07-22
Ministry: RAILWAYS
Member asked
G. Selvam, C.N. Annadurai, Rani Srikumar
(a) whether the Government has taken note of the approval of the ₹201 crore Kavach project and the successful implementation of the indigenous train collision avoidance system in various zones, if so, the details thereof; (b) whether Southern Railway caters to a vast rail network and heavy passenger traffic, particularly in Tamil Nadu has been covered under the Kavach expansion programme and if so, the details thereof; (c) the details of Kavach installation completed and under implementation in Tamil Nadu including Chennai, Madurai, Tiruchirappalli and Salem Divisions, route and division-wise; (d) the details of funds allocated and expenditure incurred for Kavach deployment in Tamil Nadu during the last three years, year-wise; and (e) the details of timeline fixed for achieving complete Kavach coverage across the Southern Railway network in Tamil Nadu to enhance passenger safety?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceONORC and PDS
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 544 · Asked on 2026-07-22
Ministry: CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
Member asked
(a) whether the Government has reviewed the implementation of the One Nation One Ration Card (ONORC) scheme and reforms in the Public Distribution System (PDS); (b) if so, the number of beneficiaries covered under the ONORC scheme; (c) whether portability has improved access to foodgrains for beneficiaries and if so, the details thereof; (d) whether any leakages or exclusion errors have been identified and if so, the details thereof; (e) the details of the steps taken by the Government to promote digitisation and transparency in the Public Distribution System; and (f) the details of the measures taken by the Government to strengthen the delivery of food security benefits?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRevision of Coal Mines Pension Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 545 · Asked on 2026-07-22
Ministry: COAL
Member asked
(a) whether it is a fact that the pension under the Coal Mines Pension Scheme has not been revised since its inception and if so, the reasons therefor and the present minimum, maximum and average monthly pension, together with the number of pensioners in each pension slab; (b) whether the Government has received representations including from Members of Parliament and pensioners' associations, seeking revision of pension under the Scheme in view of inflation over the last 28 years and if so, the action taken thereon; and (c) whether any proposal for pension enhancement, indexation, dearness relief or periodic revision is under consideration and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceHacking of Social Media Accounts
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 546 · Asked on 2026-07-22
Ministry: ELECTRONICS AND INFORMATION TECHNOLOGY
Member asked
the number of special media account (WhatsApp, 'X' and Instagram) hacked of Members of Parliament and Cabinet Ministers of Government of India during the last two years?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.