Questions and answers
What members asked in the House, and how the government replied. Each record links to the page we read it from, so you can check it yourself.
What we hold
34,220Questions we have ingested: 34,220 · of those, with a reply on file: 3,495
This counts what we have read from the record, not everything Parliament did. A question with no reply here is one whose reply we have not read yet.
Showing 3,001–3,025 / 34,220
Implementation, Coverage and Impact of PMUY
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 61 · Asked on 2026-07-23
Ministry: PETROLEUM AND NATURAL GAS
Member asked
Bidyut Baran Mahato, Godam Nagesh
(a) the total number of beneficiaries covered under the Pradhan Mantri Ujjwala Yojana (PMUY) as of June, 2026 in the country, indicating the number of LPG connections released, refill consumption, financial assistance provided and active beneficiaries thereunder, State-wise and district-wise; (b) whether the Government has undertaken any assessment of the impact of improved LPG coverage under PMUY on reducing indoor air pollution, respiratory illnesses, firewood consumption and drudgery faced by women, particularly in rural, tribal and hilly areas, if so, the details thereof; (c) the details of the safety initiatives/steps taken by the Government to improve LPG affordability, refill adoption, doorstep delivery, safety awareness, fire safety inspections, replacement of LPG hoses and expansion of LPG distributorships in remote and difficult areas along with the number of beneficiaries covered under such safety initiatives, State-wise and district-wise; and (d) the positive outcomes of the said yojana in the country?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Jal Jeevan Mission
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 62 · Asked on 2026-07-23
Ministry: JAL SHAKTI
Member asked
(a) the current status of implementation of the Jal Jeevan Mission (JJM) across the country including the number of rural households provided with Functional Household Tap Connections (FHTCs), State/UT-wise, particularly in Kallakurichi Lok Sabha Constituency of Tamil Nadu; (b) the details of funds allocated, released and utilised under the said Mission during the last three financial years and the current financial year along with the reasons for underutilisation, if any, by certain States; (c) whether the Government has conducted any independent third-party assessment of water quality, regular water supply and sustainability of the infrastructure created under the said Mission and if so, the key findings thereof; (d) the steps taken to address issues relating to delayed implementation, source sustainability and uneven coverage in drought-prone and coastal regions; and (e) whether the Government proposes to extend or redesign the Mission beyond 2028 with enhanced focus on water quality monitoring and community participation and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNational High-Speed Corridors and Expressway Projects
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 63 · Asked on 2026-07-23
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
Hemant Savara, Dharambir Singh Chaudhary
(a) whether the Ministry has reviewed the progress of construction of National High-Speed Corridors and Greenfield Expressways during 2026 and if so, the outcome thereof; (b) the status of ongoing and completed National High-Speed Corridor and Expressway projects, including the length awarded, under-construction and completed so far, State-wise; (c) whether any measures have been taken to expedite completion of delayed highway, infrastructure and expressway projects through revised implementation mechanisms or contractual reforms and if so, the details thereof, State-wise; (d) whether the Government proposes to connect upcoming Vadhavan Port in Palghar district in Maharashtra with National High-Speed Corridors and Greenfield Expressways, if so, the details of the ongoing projects and upcoming projects; and (e) the number of National Highways for which the construction work has not commenced even after approval, State-wise?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFHTCs under Jal Jeevan Mission in Rajasthan
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 64 · Asked on 2026-07-23
Ministry: JAL SHAKTI
Member asked
(a) the present status of Functional Household Tap Connections (FHTCs) provided under the Jal Jeevan Mission in Karauli and Dholpur districts of Rajasthan; (b) the manner in which regular monitoring of the quality of drinking water and water supply is ensured; (c) the special measures taken for providing water supply to areas facing drinking water crisis during the summer season; and (d) the timeline set by the Government for completion of the pending projects?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment of Bhagalpur Airport
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 65 · Asked on 2026-07-23
Ministry: CIVIL AVIATION
Member asked
(a) the present status of expansion of the airstrip and the technical survey of the runway for operation of commercial flights using ATR-72 aircraft at Bhagalpur Airport; (b) whether the Union Government has held any formal correspondence with the State Government of Bihar regarding acquisition of additional land and provision of financial allocation for Bhagalpur Airport and if so, the details thereof; (c) whether the Government proposes to include Bhagalpur Airport under the Regional Connectivity Scheme (RCS)-UDAN to facilitate commencement of direct flight services to major cities such as Delhi, Kolkata and Patna; and (d) if so, the details thereof along with the timeline fixed by the Government to execute the said project?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceMonitoring of Flight Operations
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 66 · Asked on 2026-07-23
Ministry: CIVIL AVIATION
Member asked
(a) the details of the key initiatives taken by the Directorate General of Civil Aviation (DGCA) during the year 2026 to strengthen the monitoring and surveillance of flight operations; (b) whether any digital system has been introduced or upgraded for real-time monitoring of flight operations and reporting of incidents and if so, the details thereof; (c) the measures taken to ensure compliance with international aviation safety standards by airlines and airports; and (d) whether any assessment has been carried out regarding safety-related shortcomings and if so, the details thereof along with the corrective measures taken thereon?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFour-laning of National Highway-75
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 67 · Asked on 2026-07-23
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the package-wise physical and financial progress, as recorded in the latest National Highways Authority of India (NHAI) project progress reports, of the four-laning of National Highway-75 (NH-75) from Addahole/ Periyashanthi to Bantwal; (b) the operational status of the Nellyadi and Kalladka structures, underpasses, service roads, drainage, slope-protection works and trafficable carriageways; (c) the details of works that have been suspended, restricted or rescheduled during the active monsoon along with the arrangements made for drainage, work-zone safety, diversions, slope surveillance, emergency response and uninterrupted traffic; and (d) the details of package-wise post-monsoon work programme and revised dates for restarting and completion of work?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment of Lalpur Airstrip
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 68 · Asked on 2026-07-23
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government has any proposal to develop the Lalpur Airstrip located in Shahdol district of Madhya Pradesh into a full-fledged airport and if so, the details thereof; (b) whether any technical survey or feasibility study has been conducted for upgradation of the said airstrip and if so, the details and outcomes thereof; (c) whether the said airstrip has been included under the Regional Connectivity Scheme (RCS)-UDAN and if so, the present status thereof; (d) whether any tender has been floated or action plan prepared in this regard and if so, the details thereof; and (e) the timeline fixed by the Government for implementation of the said project and the time by which the construction work is likely to commence?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProjects to Decongest South Delhi
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 69 · Asked on 2026-07-23
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the total expenditure likely to be incurred on various projects to decongest South Delhi, including making the Mathura Road from Ashram Chowk to Badarpur Border and the Mehrauli-Gurgaon Road signal free, construction of elevated road from INA to Mahipalpur and construction of tunnel from Vasant Kunj Nelson Mandela Road to Shiv Murti; (b) the date by which the work on the said projects is likely to commence; (c) whether any action plan has been formulated to alleviate traffic congestion at the Kalindi Kunj intersection; and (d) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRopecar Facility to Rockfort Temple, Tiruchirappalli
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 691 · Asked on 2026-07-23
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has received any proposal or representation for providing a ropeway/ropecar facility to the Rockfort Temple, one of the prominent heritage and pilgrimage sites in Tiruchirappalli; (b) if so, the details thereof and the action taken by the Government in this regard; (c) whether the Government proposes to provide financial or technical assistance for establishing a ropecar facility to improve accessibility for elderly persons, Divyangjan and pilgrims visiting the temple; and (d) if so, the details thereof along with the proposed timeline for implementation and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGroundwater Availability in Balasore, Odisha
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 692 · Asked on 2026-07-23
Ministry: JAL SHAKTI
Member asked
(a) whether the Government is aware that Balasore district in Odisha has been grappling with depletion of groundwater resources; (b) if so, the details thereof along with the details of groundwater availability and its utilisation in Balasore district from the Financial Year 2014–15 to 2025–26, year-wise; (c) the measures undertaken by the Government to regulate and monitor groundwater extraction and recharge in Balasore district; (d) the details of funds apportioned and expended for this purpose during the above-said period; (e) whether any accomplishments have been attained in improving the groundwater level and quality in the said district; and (f) if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePM Vishwakarma in Andhra Pradesh
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 693 · Asked on 2026-07-23
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the number of artisans and craftspersons from Andhra Pradesh registered and provided training, toolkit support and credit linkage under the PM Vishwakarma Scheme, district-wise; (b) the number of Skill India Centres and Pradhan Mantri Kaushal Kendras sanctioned and operational in Andhra Pradesh, district-wise; (c) whether the Government proposes to establish dedicated PM Vishwakarma clusters in artisan-rich districts of Andhra Pradesh such as Kakinada, Srikakulam and Vizianagaram and if so, the details thereof; and (d) the details of funds released to Andhra Pradesh under the PM Vishwakarma Scheme during 2024-25 and 2025-26, year-wise, along with the number of beneficiaries covered thereunder?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceE20 Fuel Retail Outlets
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 694 · Asked on 2026-07-23
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) the extent to which the country's dependence on crude oil imports and the measures taken by the Government to reduce such dependence; (b) the details of the number of retail outlets offering ethanol blended E20 fuel along with the number of retail outlets offering fuel without blending ethanol in the country, State/UT-wise; and (c) whether the Government proposes to create a price stabilisation fund to prevent the rise in oil prices due to fluctuations in crude oil prices, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceLoans sanctioned and disbursed under PM-SVANidhi Scheme
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 695 · Asked on 2026-07-23
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) the number of street vendor loans sanctioned and disbursed under PM SVANidhi scheme during the last five years along with the amount disbursed and the repayment rate, year and State/UT-wise; (b) the number of vendors who have availed the second and third tranches of credit indicating improved creditworthiness, State-wise; (c) whether any assessment of the impact on income enhancement and digital payment adoption among street vendors has been conducted under the scheme and if so, the findings thereof; and (d) the steps taken to expand PM SVANidhi coverage to coastal market towns and fishing harbours in Andhra Pradesh including Kakinada where a significant share of informal street vendors operate?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConstruction of New High-capacity Power Transmission Lines
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 696 · Asked on 2026-07-23
Ministry: POWER
Member asked
(a) whether the Government is aware that the construction of new high-capacity power transmission lines and towers are causing damage to farmers' agricultural land, crops and irrigation systems and if so, the details thereof; (b) the number of farmers affected by these projects and the details of the compensation provided to them during the last five years, State-wise; (c) whether there is a wide disparity in the rates and procedure of providing compensation to farmers affected by such power transmission lines in various States; (d) if so, the reasons therefor; (e) whether the Government proposes to formulate a uniform and fair compensation policy nationwide, and provide appropriate annual or one-time compensation to farmers for land-use restrictions under towers and power line corridors; and (f) if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of Viability Gap Funding Scheme for BESS
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 697 · Asked on 2026-07-23
Ministry: POWER
Member asked
Krishna Prasad Tenneti, P. C. Mohan, Mala Rajya Laxmi Shah, Anup Dhotre, Shobhanaben Baraiya, Kamaljeet Sehrawat
(a) the progress made so far in the implementation of the Viability Gap Funding (VGF) Scheme for Battery Energy Storage Systems (BESS), including the energy storage capacity approved and commissioned thereunder; (b) the policy, financial and technical measures taken by the Government to promote standalone and co-located Battery Energy Storage System (BESS) projects for strengthening the integration of renewable energy; (c) the manner in which Battery Energy Storage Systems (BESS) have been envisaged to meet peak power demand, ensure grid reliability and stability and facilitate the effective integration of renewable energy; (d) whether the Government proposes to provide any additional policy, financial or incentive support to promote rapid expansion of energy storage technologies, domestic manufacturing, attract investment and encourage their wider adoption across the States and if so, the details thereof; and (e) whether any Battery Energy Storage System (BESS) projects have been sanctioned, approved or proposed in Akola district or the Maharashtra under the Viability Gap Funding Scheme and if so, the details thereof including the storage capacity, financial assistance sanctioned, the present status of implementation and the expected timeline for commissioning?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAssessment of Extent of Water Scarcity
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 698 · Asked on 2026-07-23
Ministry: JAL SHAKTI
Member asked
Manickam Tagore, Vijay Vasanth
(a) whether the Government has assessed the extent of water scarcity across States due to declining groundwater levels, if so, the details thereof and if not, the reasons therefor; (b) whether the groundwater depletion has reached critical levels in certain regions, if so, the details thereof, State-wise; (c) whether the Government has implemented any programmes for groundwater recharge and conservation, if so, the details thereof and if not, the reasons therefor; (d) whether the rainwater harvesting has been effectively promoted nationwide, if so, the details thereof including the targets set and achievements made and if not, the reasons therefor; (e) whether the watershed development programmes have improved water availability in rural areas, if so, the details thereof and if not, the reasons therefor; and (f) whether adequate funds have been allocated for water conservation schemes, if so, the details thereof including their utilisation status and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceWater Quality Monitoring in Maharashtra
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 699 · Asked on 2026-07-23
Ministry: JAL SHAKTI
Member asked
Bachhav Shobha Dinesh, Praniti Shinde
(a) the frequency of cleaning, flushing and maintenance of drinking water supply pipelines undertaken since 2014, State-wise including district-wise in Maharashtra; (b) whether any periodic technical reviews and audits of urban and rural drainage and sewerage systems have been conducted during the same period and if so, the details thereof, State-wise including district-wise in Maharashtra; (c) the number of water quality tests conducted since 2014 including testing for bacterial and chemical contamination, State-wise including district-wise in Maharashtra and the instances where contamination exceeded the permissible limits; (d) whether the Government has reviewed the lapses that led to major water contamination incidents including the recent water tragedy in Madhya Pradesh and if so, the findings thereof; and (e) the corrective steps taken to ensure that such public health disasters do not recur?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInclusion of Narayanpur Municipal Board, Sonitpur, Assam under PMAY-U 2.0
starredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 70 · Asked on 2026-07-23
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether the Union Government has received any proposal/request from the State Government of Assam for inclusion of Narayanpur Municipal Board in Sonitpur district under the Priority-II list of the Pradhan Mantri Awas Yojana-Urban (PMAY-U) 2.0 and if so, the details and the present status thereof; (b) whether the Government is aware of the housing needs of the Economically Weaker Sections (EWS) and Low Income Group (LIG) families residing in the area of Narayanpur Municipal Board and if so, the details thereof; (c) whether the Government proposes to include Narayanpur Municipal Board under the Priority-II list of the PMAY-U 2.0 and sanction houses for eligible beneficiaries therein; and (d) if so, the details thereof along with the timeline fixed for such inclusion and sanction of houses and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceEthanol-Blending and Consumer Choice
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 700 · Asked on 2026-07-23
Ministry: PETROLEUM AND NATURAL GAS
Member asked
(a) the extent of savings in crude oil import expenditure achieved as a result of the Ethanol Blended Petrol (EBP) Programme during the last five years, year-wise; (b) whether the Government has assessed the impact of ethanol blending on the retail price of petrol and the extent to which the resulting economic benefits have been passed on to consumers, if so, the details thereof; (c) whether it is a fact that despite increased ethanol blending and reduced dependence on imported crude oil, consumers have not witnessed a corresponding reduction in petrol prices, if so, the details thereof; (d) whether consumers are presently provided the option to purchase non-ethanol-blended petrol alongside ethanol-blended petrol at retail outlets, if so, the details thereof; and (e) if not, the reasons therefor and whether the Government proposes to provide consumers the freedom to choose between blended and non-blended petrol in the interest of consumer rights and informed choice, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAir Cargo Infrastructure
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 701 · Asked on 2026-07-23
Ministry: CIVIL AVIATION
Member asked
K. Sudhakar, Tejasvi Surya, Vishweshwar Hegde Kageri, Anurag Sharma, Dhairyasheel Mane, D. K. Aruna, Trivendra Singh Rawat, Ashok Kumar Rawat, Kamaljeet Sehrawat, Kripanath Mallah
(a) the progress made in strengthening air cargo infrastructure under the National Logistics Policy and the Krishi UDAN Scheme during the year 2026 in the country, State-wise; (b) the airports and cargo terminals identified for expansion or upgradation along with the current status thereof across the country, particularly in Karnataka; (c) whether air cargo operations have been integrated with the National Logistics Portal and other trade facilitation systems and if so, the details thereof; and (d) the measures taken to improve handling capacity and reduce turnaround time for export-oriented and perishable cargo?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceAssistance for Waste Management System
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 702 · Asked on 2026-07-23
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether the Government is providing any financial assistance, grant or incentive to Gram Panchayats, Resident Welfare Associations and housing societies for promoting segregation of household waste, scientific disposal and composting; (b) if so, the details of the said scheme, the amount of assistance and the number of institutions benefited thereunder so far; (c) whether the Government proposes to provide any special incentives for developing waste management systems at the community level; and (d) if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceModified UDAN Scheme for North-Eastern States
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 703 · Asked on 2026-07-23
Ministry: CIVIL AVIATION
Member asked
(a) the total number of routes sanctioned under UDAN Scheme for Assam and other North Eastern States across all phases along with the number of routes currently operational and the number of routes discontinued after the Viability Gap Funding period ended; (b) whether the Government has examined the CAG's finding that only 7–10 per cent of UDAN routes remained financially viable after the subsidy period, and if so, the details thereof along with the specific mechanism provided under the Modified UDAN Scheme 2026–2036 to prevent recurrence of such failures; (c) the amount earmarked specifically for North-Eastern routes, airport development and helipad connectivity out of the Rupees 28,840 crore allocated under the Modified UDAN Scheme; and (d) the action taken against airlines that surrendered North-Eastern routes before the end of their contracted subsidy period?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInvestigation in Air Crash Incident
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 704 · Asked on 2026-07-23
Ministry: CIVIL AVIATION
Member asked
(a) whether the Aircraft Accident Investigation Bureau (AAIB) has released the interim statement on the investigation into the Air India AI-171 aircraft crash and if so, the details thereof; (b) whether the final report would be released after completion of all investigative work and conclusion of the mandatory international review and consultation processes and if so, the details thereof; and (c) the corrective steps taken including the losses estimated and the future course of action proposed to prevent recurrence of such incidents?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProgress and Finalisation of Third and Fourth Phases of Kochi Metro
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 705 · Asked on 2026-07-23
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
(a) whether the finalisation of the selection of routes for the third and fourth phases of Kochi Metro has been completed, if so, the details thereof including the timeline fixed in this regard and if not, the reasons therefor; (b) whether a funding model has been established for the third and fourth phases of Kochi Metro, if so, the details thereof including the timeline fixed in this regard and if not, the reasons therefor; (c) whether there are any pending proposals from the State Government of Kerala related to the third and fourth phases of Kochi Metro, if so, the details thereof including the timeline fixed in this regard and if not, the reasons therefor; (d) whether any other development plans for income generation of Kochi Metro Rail Ltd. (KMRL) have been decided, if so, the details thereof including the timeline fixed in this regard and if not, the reasons therefor; (e) whether the completion date of the second phase of Kochi Metro has been fixed, if so, the details thereof including the timeline fixed in this regard and if not, the reasons therefor; and (f) whether KMRL has initiated the procurement process for additional trains as part of its expansion plans under Phase-II and Phase-III development projects, if so, the details thereof including the timeline fixed in this regard and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source
These records are read from the Parliament of India record at sansad.in.